SEVEN-G
Document 20 · 16-09-2026

Document 20 · Phase manuals

Phase manuals

How each phase of the lifecycle of an AI use case is carried out, from authorisation to evolution or retirement

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review
8phase manuals
13sections per manual
4technology profiles
31linked evidence templates

01Purpose and scope

This document turns the use case lifecycle defined in document 01 (section 6) into working instructions. For each phase, from 0 to 7, it sets out what must be done, in what order, who does it, what evidence must exist before the decision gate and how that gate is prepared. It includes the differences by intensity (Lite or Enterprise; at Express, the P01 §14 living record replaces the templates and each gate is assessed with the reduced list in 21 §2.5), by ambition level and by technology, as well as the transitions between phases.

What it does not cover and where to find it

Topic Document
Criteria for each gate (G<n>.<nn>, R6.<nn>) and checklists (LV-G0…) 21 and 22
Adoption, released capacity and training 23
Bodies, roles and escalation of decisions 30
Risks, regulation, agent security, third parties and incidents 33, 34, 35, 36 and 37
Content of each piece of evidence Templates P01–P31

Scope. AI use cases and third-party AI embedded in processes (01 §1.2). Corporate use of general-purpose AI only goes through these manuals if it meets any Enterprise criterion (01 §9.2); otherwise it is governed through the inventory, the acceptable use policy and training (document 31).

This document does not constitute legal advice. The regulatory references were consulted in September 2026 and their validity must be checked in document 34.


02How to use the manuals

2.1 Common structure

Sections 3 to 10 each develop one phase with thirteen fixed sections: 1 objective · 2 when it starts and when it ends · 3 inputs · 4 step-by-step activities · 5 roles · 6 mandatory evidence · 7 differences between Lite and Enterprise · 8 differences by ambition level · 9 technology-specific considerations · 10 reference time limit · 11 gate preparation · 12 common mistakes · 13 events in the register.

The AI Product Owner uses them as a working guide; the AI Technical Owner, in phases 3 to 5; the AI Operations Owner, in phase 6; the AI Sponsor, to know what to demand before a gate; the AI Risk Owner, for their activities and clearances; the AI Auditor and the AI Office, to know what evidence and which mistakes to look for when verifying.

2.2 Overview

Use case lifecycle
Eight phases with auditable decision gates and a real capacity to stop
AUTHORISE DECIDE BUILD AND DEMONSTRATE OPERATE AND EVOLVE 0Context 1Opportunitydiscovery 2Valuehypothesis 3 · STOPFeasibilityand risk 4Design 5Delivery andvalidation 6Operation 7Evolution orretirement ◆ Gate Proceed · Proceed with conditions · Iterate · Pivot · Stop Phase 7: Scale · Iterate · Retire Phase 3 is the main stop gate: without technical, economic and risk feasibility, nothing is designed.
Source: SEVEN-G
Phase Gate Accountable (A) Templates Time limit Lite / Enterprise
0 · Context and constraints Authorisation (G0) AI Sponsor P01–P05 10 / 20 days
1 · Opportunity discovery Opportunity (G1) AI Sponsor P06, P07, P31 20 / 30 days
2 · Value hypothesis Hypothesis (G2) AI Sponsor P07, P08, P09 20 / 30 days
3 · Feasibility and risk Feasibility (G3) AI Sponsor P04, P10–P14 20 / 45 days
4 · Solution design Design (G4) AI Technical Owner P15–P20 20 / 45 days
5 · Delivery and validation Go-live (G5) AI Product Owner P12, P19–P23 60 / 90 days
6 · Operation and governance Continuity review (R6) AI Operations Owner P04, P12, P20, P24–P28 No time limit; R6 half-yearly / quarterly
7 · Evolution or retirement Scale or retire (G7) AI Sponsor P07, P28, P30 15 / 30 days

Every decision is documented with the gate decision record (P29) in the gate manager (T03). The use case record (P31) is opened in phase 1 and maintained until retirement.

2.3 Conventions

2.4 Rules common to all phases

  1. Evidence exists before the gate is requested, with author, date and version. Documentation produced after the fact invalidates the gate and is a major nonconformity (01 §7.4).
  2. Whoever provides evidence neither verifies it nor decides on it.
  3. No mandatory evidence, no decision. T03 does not allow Proceed to be recorded with mandatory criteria in Not met or Pending.
  4. Conditions have a deadline and an owner and are not accepted for critical security, legal compliance or human oversight controls. Once expired, the outcome becomes Iterate.
  5. After two iterations at the same gate, the decision is escalated to the higher body.
  6. Stop criteria are not relaxed without approval from the body that authorised the use case.
  7. Intensity only goes up without waiting for a gate. It is determined in phase 0 and reviewed at G3 and at each R6. If an Enterprise criterion appears earlier (for example, Transform ambition or an agent with the capacity to act), the use case moves to Enterprise at that moment. A return to Lite can only be decided at G3 or R6.
  8. Every amount has a formula and a status, and released capacity is reported separately (measurement rules 1, 2 and 3). P31 is kept in plain language (rule 10).
  9. Grouping is not omitting. When G0–G2 or G4–G5 are grouped in Lite, each gate is recorded as a separate decision in T03 and each piece of evidence is verified.

2.5 Recording in T01

Event types (03 §3.3): registration; entry into and exit from a phase; gate request; verification; decision with outcome; creation, fulfilment or expiry of conditions; move to on hold and resumption; change of classification (ambition, intensity or regulatory); incident; nonconformity; stop; retirement. All of them carry date, author and comment. Section 13 of each manual lists those specific to the phase; on hold, conditions and nonconformities can occur in any phase.


03Context and constraints (phase 0)

3.1 Objective

Formally authorise the use case and set its framework: strategic objective, sphere, constraints, roles, intensity and inventory registration. Question: is the use case authorised and within what framework?

3.2 When it starts and when it ends

3.3 Inputs

Registered idea with a plain-language description (T01) · AI thesis, ambition by sphere and risk appetite (C2, document 13) · portfolio, framework budget and Enterprise investment threshold (C3, document 14) · corporate and acceptable use policy (document 31) · inventory and existing use cases (T02, T01) · regulatory mapping and sector regulations (document 34) · if it comes from scaling, the G7 decision and lessons learned (P30).

3.4 Step-by-step activities

# Activity Performed by Involved
1 Describe the business need and the strategic objective without presupposing the solution; identify the primary and secondary sphere. Product Technical, user area
2 Check the fit with the thesis, the ambition of the sphere and the portfolio; search T01 and T02 for similar use cases or systems. Product AI Office
3 Declare regulatory, ethical, data (availability, preliminary legal basis, special categories), budgetary, time, technological and supplier constraints. Product Risk, Technical, legal counsel
4 Preliminary regulatory identification with T07 (possible prohibited practice, high risk, transparency); if no conclusion can be reached, Pending classification. Product Risk
5 Assign the six roles, check incompatibilities (01 §8.2) and obtain express acceptance. The AI Auditor is appointed by the third line, not by the AI Sponsor. Product AI Office, third line
6 Determine the intensity with T04; if there are agents, declare the planned autonomy level (A0–A3). Product Risk
7 Set the budget and spending limit authorised up to G3. Product Management control
8 Register the planned systems in T02, even if they do not yet exist. Product Technical
9 Draft the charter, gather the evidence and request G0 in T03. Product —

3.5 Roles

Sponsor A · Product R · Technical C · Operations I · Risk C · Auditor V (in Lite the AI Office verifies).

3.6 Mandatory evidence

Evidence Template Tool
Use case charter P01 T01
Context and constraints statement P02 T01
Role assignment record P03 T01
Intensity determination P04 T04
Inventory registration P05 T02

3.7 Differences between Lite and Enterprise

Aspect Lite Enterprise
Templates Fields marked (Enterprise) are omitted. Complete.
Verification and decision AI Office; AI Sponsor. AI Auditor; AI Committee.
Grouping G0, G1 and G2 in a single session. Separately.
Regulatory identification With T07. With T07 and review by legal counsel.

3.8 Differences by ambition level

Ambition is proposed in phase 1; in phase 0 the charter only records the planned ambition.

Level What changes
Optimise Charter focused on one process and one area; fit within the area's portfolio is usually sufficient.
Augment The groups whose work will change are identified from the outset and the people function is consulted.
Transform It should stem from a bet planned in C2 or C3. Enterprise intensity from the outset, an AI Sponsor from senior management and a charter with stages and an investment limit for the first one.

3.9 Technology-specific considerations

Profile What changes
Predictive ML Declare whether the result will influence decisions about people (Enterprise criterion) and identify the historical data and its owner.
Generative AI Declare exposure, type of content generated, use of third-party models and whether personal or confidential data will be input.
Agents Declare planned autonomy and reachable systems. A2 or A3 with an effect on third parties, money, personal data or production systems implies Enterprise.
Embedded third-party AI Identify supplier, product and function; whether it is enabled by default and what data the supplier receives. Inventory registration is mandatory. Preliminary requirement level N1–N3.

3.10 Reference time limit

10 days in Lite and 20 in Enterprise.

3.11 Preparation of gate G0

3.12 Common mistakes

3.13 Events in the register

Registration · entry into phase 0 · system registration in T02 · first intensity classification and preliminary regulatory classification · G0 request, verification and decision · conditions · exit or stop with coded reason.


04Opportunity discovery (phase 1)

4.1 Objective

Identify opportunities from the business side within the authorised scope, discard those that do not require AI or have no plausible value, and propose the sphere and ambition level. Question: is there a business opportunity that requires AI?

4.2 When it starts and when it ends

4.3 Inputs

Evidence and conditions from G0 (P01–P05, T03) · process or decision data: volumes, times, costs, errors (user area, management control) · stopped or retired use cases with comparable reasons (T01) · sphere map and ambition criteria (documents 10 and 12, T05).

4.4 Step-by-step activities

# Activity Performed by Involved
1 Analyse the process or decision: steps, volumes, times, costs, errors, decision points and people. Product Technical, user area
2 Record the opportunities in P06 with the problem, the affected user or customer and the expected result. Product User area
3 Identify and compare non-AI alternatives: process redesign, rules, conventional automation, training, policy change. Product Technical
4 Estimate the order of magnitude of the value with a formula (units × unit value), marked estimated, and of the effort. Product Technical, management control
5 Note why each opportunity moves forward or is discarded. Product Risk
6 Propose sphere and ambition with the five questions in 00 §5.2 (T05, P07). Product AI Office
7 Draft the use case record (P31) for the selected opportunity. Product —
8 Review the intensity if an Enterprise criterion appears; request G1. Product Risk

4.5 Roles

Sponsor A · Product R · Technical C · Operations I · Risk C · Auditor V (in Lite the AI Office verifies).

4.6 Mandatory evidence

Evidence Template Tool
Opportunity portfolio and filtering notes P06 T01
Non-AI alternatives considered P06 T01
Proposed sphere and ambition level P07 T05
Plain-language description of the case P31 T01

4.7 Differences between Lite and Enterprise

Aspect Lite Enterprise
Portfolio May be limited to one opportunity with its alternatives. Several opportunities compared where the scope allows.
Verification and decision AI Office; AI Sponsor. AI Auditor; AI Sponsor, informing the committee.
Grouping With G0 and G2. Separately.

4.8 Differences by ambition level

Level What changes
Optimise Rigorous comparison with the non-AI alternatives: if a rule or a redesign achieves the same, it is discarded.
Augment The roles and decisions that would change are identified, together with what people will be able to do that they cannot do today.
Transform Exploration with customers, the market or the operating model; it is not discarded for lack of short-term return; the hypothesis of a change in offering or competition is documented. It moves to Enterprise.

4.9 Technology-specific considerations

Profile What changes
Predictive ML Check that there is historical data and that the actual outcome is observable; if it will never be known whether the prediction was right, the hypothesis will not be falsifiable.
Generative AI Distinguish individual productivity (corporate use, document 31) from integration into a process. Prioritise tasks where errors are detectable or tolerable.
Agents List the agent's actions and whether they are reversible; consider starting with less autonomy.
Embedded third-party AI Check in T02 whether an already licensed tool offers the function; consider build, buy or partner.

4.10 Reference time limit

20 days in Lite and 30 in Enterprise.

4.11 Preparation of gate G1

4.12 Common mistakes

4.13 Events in the register

Entry into phase 1 · proposed ambition · change of intensity, where applicable · G1 request, verification and decision · conditions · exit, pivot or stop with coded reason.


05Value hypothesis (phase 2)

5.1 Objective

Formulate a measurable and falsifiable value hypothesis, with baseline, target, success threshold, attribution method and stop criteria defined before investing in construction. Question: what value do we expect, how will we measure it and how will we know it has failed?

5.2 When it starts and when it ends

5.3 Inputs

P06, P07 and P31 approved · operational data for the baseline period (user area, systems) · unit values such as cost per hour, margin or cost per error (management control) · return horizon and thresholds (C2) · measurement rules and indicators (documents 40 and 41) · in the case of a pivot, previous evidence and reason (T01, P29).

5.4 Step-by-step activities

# Activity Performed by Involved
1 Formulate the hypothesis: if [change] is introduced, [metric] will go from [baseline] to [target] within [time frame] for [population], measured with [method]. Product Technical
2 Define the primary metric, secondary metrics and guardrail metrics (quality, complaints, errors, fairness) that must not worsen. Product Technical, Risk
3 Measure the baseline with real data from a representative period, with source, extraction and quality documented (P09). An estimate is only accepted if justified and marked. Product Technical, user area
4 Set the target and the success threshold: the minimum result that justifies proceeding. Product Management control
5 Choose the attribution method: control group, staggered rollout, before and after with seasonality correction, or another justified method. Product Technical, AI Office
6 Express the expected value in money with a formula, separating efficiencies, return and preliminary recurring cost; released capacity separately (T11). Product Management control
7 Confirm the ambition level with the formulated hypothesis (P07). Product AI Office
8 Define stop criteria (results, time limits or costs); for Transform, learning milestones and an investment limit per stage. Product Risk
9 For Augment and Transform, set the adoption target (document 23). Update P31 and request G2. Product User area

5.5 Roles

Sponsor A · Product R · Technical C · Operations I · Risk C · Auditor V (in Lite the AI Office verifies). The AI Sponsor accepts the success threshold and the stop criteria and undertakes to respect them.

5.6 Mandatory evidence

Evidence Template Tool
Value hypothesis canvas, attribution method and stop criteria P08 T11
Baseline metrics P09 T11
Confirmation of the ambition level P07 T05

5.7 Differences between Lite and Enterprise

Aspect Lite Enterprise
Baseline May be based on existing management reports if they are verifiable. Reproducible extraction with documented source and query.
Attribution Before and after acceptable with justification. Control group or staggered rollout where feasible.
Verification and decision AI Office; AI Sponsor. AI Auditor; AI Committee; board for Transform.

5.8 Differences by ambition level

Level What is required at G2 (01 §7.6)
Optimise Baseline for cost, time or errors and expected savings with a formula, separate from released capacity.
Augment Performance metrics (productivity, quality, conversion) and cost metrics, and an adoption target.
Transform Return hypothesis with learning milestones, investment limit per stage and board approval. More uncertainty is accepted, but not the absence of stop criteria.

5.9 Technology-specific considerations

Profile What changes
Predictive ML Separate business metrics from model metrics; translate the business threshold into minimum model performance. The baseline is the current process (rules or expert judgement).
Generative AI Measure the time and quality of current work by sampling with an explicit rubric; include the variable consumption cost.
Agents Per-task metrics: tasks completed correctly, escalated to a person, erroneous actions and cost per task.
Embedded third-party AI The benefits advertised by the supplier are neither a baseline nor a hypothesis; measurement uses the company's own data and includes licences and consumption.

5.10 Reference time limit

20 days in Lite and 30 in Enterprise. For Transform, waiting for the board meeting counts as decision time.

5.11 Preparation of gate G2

5.12 Common mistakes

5.13 Events in the register

Entry into phase 2 (flagging the pivot, if any) · confirmed ambition · G2 request, verification and decision · board approval for Transform · conditions · exit, pivot or stop.


06Feasibility and risk (phase 3)

6.1 Objective

Decide whether the use case is technically, economically, regulatorily and organisationally feasible with acceptable risk. It is the main stop gate: what is not stopped here is stopped later at a higher cost.

6.2 When it starts and when it ends

6.3 Inputs

P08 and P09 approved · risk appetite, thresholds and horizon (C2) · scales and typical risks RT-<CAT>-NN (document 33) · regulatory mapping (document 34, T07) · authorised access to real data samples within the constraints of P02 · supplier documentation and offers · architecture and security standards.

6.4 Step-by-step activities

# Activity Performed by Involved
1 Assess the availability, quality, representativeness and legal basis of the data using real data. Technical Risk, data protection officer
2 Assess technical feasibility, if necessary with a test limited in scope, time and spending that does not turn into construction. Technical Product
3 Estimate construction and recurring costs by category (document 42, T13), including control, compliance, adoption and training. Technical and Product Management control, Operations
4 Calculate the expected annual net value and the additional net value per euro and compare them with the C2 horizon. Product Management control
5 Classify the system with legal judgement (P11, T07), including the company's role (provider or deployer). Risk Legal counsel
6 Carry out the required impact assessments: data protection impact assessment (Art. 35 GDPR) and fundamental rights impact assessment (Art. 27 EU AI Act) in the cases provided for. Risk Data protection officer, Product
7 Identify and assess inherent and residual risks with the 5 × 5 scale (P12, T06), including generative AI, agents, security and third parties. Risk, Product and Technical Operations
8 Define responses, the mitigation and contingency plan (P13) and acceptance of residual risk at the appropriate level. Risk Product, Technical
9 Assess suppliers with their requirement level N1–N3 (P14, T09). Technical Risk, procurement
Sphere map and ambition levels (10) Assess the impact on people with the preliminary analysis of roles and tasks (document 23). Product People, user area
Maturity model (11) Review the intensity (P04), update P31 and request G3. Product Risk

Acceptance of residual risk: Low, AI Product Owner with a record; Medium, AI Sponsor with risk clearance; High, AI Committee; Critical, not accepted except with exceptional approval by the board or its board committee within the C2 appetite.

6.5 Roles

Sponsor A · Product R · Technical R · Operations C · Risk R · Auditor V (in Lite the AI Office verifies). Construction and control work at the same time, but risk clearance remains independent of what product and technical provide.

6.6 Mandatory evidence

Evidence Template Tool
Feasibility assessment (data, technical, costs, net value) P10 T13
Regulatory classification and impact assessments P11 T07
Risk matrix and register P12 T06
Mitigation and contingency plan P13 T06
Supplier assessment, if any P14 T09
Intensity review P04 T04

6.7 Differences between Lite and Enterprise

Aspect Lite Enterprise
Regulatory classification Mandatory; Lite simplifies the template, not the obligation. Mandatory, with a legal report.
Impact assessments Those required by law, whatever the intensity. Those required and those decided by the committee.
Costs Main categories. All the categories in document 42.
Verification and decision AI Office; AI Sponsor with risk clearance. AI Auditor; AI Committee.

6.8 Differences by ambition level

Level What is required at G3 (01 §7.6)
Optimise Positive expected annual net value within the C2 horizon.
Augment Feasibility of adoption and of the role change, in addition to the expected net value.
Transform Feasibility of the first stage, stop criteria per stage and documented option value: what learning or position is gained even if the next stage is not funded.

6.9 Technology-specific considerations

Profile What changes
Predictive ML Biases in historical data, representativeness, proxy target variables and the need for explainability for oversight.
Generative AI Representative test case set including adversarial cases; risks of incorrect or ungrounded content and of information leakage; consumption cost scenarios; supplier data use terms; transparency (document 34).
Agents Inventory of actions and reachable systems; impact of the worst possible action; excessive permissions, unauthorised actions and indirect prompt injection; justification of the autonomy level.
Embedded third-party AI Level N1–N3, dependency and substitutability, use of data for training, location, audit rights, notice of model changes and exit plan; DORA or NIS2 where applicable.

6.10 Reference time limit

20 days in Lite and 45 in Enterprise.

6.11 Preparation of gate G3

6.12 Common mistakes

6.13 Events in the register

Entry into phase 3 · final regulatory classification · intensity review · supplier registration in T09 · G3 request, verification and decision · conditions · on hold (frequent due to data or suppliers) · exit, pivot or stop (insufficient data, technically unfeasible, cost higher than value, unacceptable risk, regulation).


07Solution design (phase 4)

7.1 Objective

Design a solution that is controllable, supervisable and reversible, in which every risk accepted at G3 has a designed control and adoption and measurement are planned from the design stage. Question: how is it built with control, human oversight and reversibility?

7.2 When it starts and when it ends

7.3 Inputs

Risks, responses and required controls (P12, P13) · obligations arising from the regulatory classification (P11) · metrics, baseline and attribution (P08, P09) · supplier conditions (P14) · preliminary analysis of the impact on people (P10) · architecture, security and data standards (documents 35 and 51).

7.4 Step-by-step activities

# Activity Performed by Involved
1 Define the architecture and record the decisions with the options considered (P15). Technical Operations, information security
2 Document data and model lineage: sources, transformations, versions, training and evaluation sets, third-party models (P16). Technical Data protection officer
3 Design human oversight (P17): what the system decides, what a person validates, what is never delegated, intervention criteria, how a result is overridden and information for those affected. Technical Product, Risk, user area
4 Design security (P18, T10): identity and permissions, least privilege, protection against injection, activity logging and, for agents, intent-based access control and kill switch. Technical Risk, information security
5 Trace each risk in P12 to a control and to the test that will check it in phase 5. Technical Risk
6 Design the instrumentation for measuring value and adoption according to the attribution method. Technical Product, management control
7 Define monitoring (performance, degradation, bias, costs, security, usage) and the initial alert thresholds. Technical Operations
8 Prepare the rollback plan (P19): triggers, procedure, owner, target time, return to the previous process, data and how to test it. Technical Operations, user area
9 Design adoption (P20, document 23): impact on roles, training, communication and use of released capacity. Product People, user area
Sphere map and ambition levels (10) Define the test and pilot plan (population, duration, control group, interruption criteria) and request G4. Technical Product, Risk

7.5 Roles

Sponsor I · Product C · Technical A/R · Operations C · Risk C · Auditor V (in Lite the AI Office verifies). Product carries out the adoption design because it is accountable for adoption (01 §8.1); operations ensures that the solution can be operated and rolled back.

7.6 Mandatory evidence

Evidence Template Tool
Architecture record P15 —
Data and model lineage P16 —
Governance and human oversight design P17 —
Security design P18 T10
Rollback plan P19 —
Adoption plan P20 T20

7.7 Differences between Lite and Enterprise

Aspect Lite Enterprise
Design review Uninvolved technical peer. Formal review with information security and data protection.
Adoption plan Training and use of released capacity. All the blocks of P20.
Verification and decision AI Office; AI Sponsor with risk clearance. Can be grouped with G5. AI Auditor; AI Committee.

7.8 Differences by ambition level

Level What changes
Optimise Process change is minimised and the way released capacity will materialise is planned (to whom, when, through what mechanism).
Augment Role redesign and human oversight are the core; the user experience is tested with real users.
Transform Staged design with decision points and an architecture that allows stopping at the end of each stage while retaining the learning; changes to the operating model (roles, decision rights) and experiments with customers.

7.9 Technology-specific considerations

Profile What changes
Predictive ML Versioning of models and data, retraining as a controlled change, decision thresholds, explanations useful to the supervisor and drift detection.
Generative AI Authorised sources for content retrieval, input and output filters, versioned system instructions, retention of conversations in line with data protection, automated evaluations and consumption limits.
Agents Own identity, minimum permissions per tool, closed list of actions, human validation of sensitive actions, intent-based access control, logging of intent and action, volume and amount limits and kill switch.
Embedded third-party AI Configuration of the AI function, contractual clauses translated into technical controls, management of supplier versions and an alternative if the function changes or is withdrawn.

7.10 Reference time limit

20 days in Lite and 45 in Enterprise.

7.11 Preparation of gate G4

7.12 Common mistakes

7.13 Events in the register

Entry into phase 4 · verification of G3 conditions · change of intensity if the design alters autonomy, exposure or data · G4 request, verification and decision · conditions · exit or stop.


08Delivery and validation (phase 5)

8.1 Objective

Build or integrate the solution, test it and demonstrate value under real conditions before the final go-live. Theoretical results are not enough. Question: does it work and deliver value under real conditions?

8.2 When it starts and when it ends

8.3 Inputs

Approved design and G4 conditions (P15–P20) · test and pilot plan · authorised environments, access and data · signed contracts with suppliers · training and communication materials (P20).

8.4 Step-by-step activities

# Activity Performed by Involved
1 Build or integrate according to the design, recording deviations and their approval. If it is built with AI assistance, apply document 53. Technical Operations
2 Run functional, performance, bias, robustness and security tests, including prompt injection tests for generative AI and agents. Technical Risk, information security
3 Test each critical control in P17 and P18 and record the result. Technical Risk
4 Train pilot users and supervisors before they use the system. Product People, user area
5 Run the pilot with the attribution method, recording value and adoption indicators. Product Technical, Operations
6 Analyse results against the hypothesis and the threshold, with the status of each amount (P22). Product Management control
7 Test the rollback plan under realistic conditions and record time and result (P19). Technical Operations
8 Update the risk register with what has been observed (P12). Technical and Product Risk
9 Prepare operations: manual, monitoring and alerts configured, incident response plan and handover. Technical Operations
Sphere map and ambition levels (10) Prepare the delivery report (P21). Technical —
Maturity model (11) Obtain the go-live sign-off (P23): in Enterprise, technical, risk and compliance, information security and data protection, each with veto power; in Lite, risk clearance. Request G5. Product Signatories

8.5 Roles

Sponsor I · Product A · Technical R · Operations C · Risk C · Auditor V (in Lite the AI Office verifies). The AI Sponsor decides G5 in Lite, with risk clearance.

8.6 Mandatory evidence

Evidence Template Tool
Delivery report P21 —
Validation, test and pilot results P22 T11
Rollback plan test P19 —
Updated risk register P12 T06
Go-live sign-off P23 T03
Adoption plan with training delivered P20 T20

8.7 Differences between Lite and Enterprise

Aspect Lite Enterprise
Pilot One team or a reduced volume. Population and duration sufficient for the attribution method.
Go-live Risk clearance. Multi-level sign-off with veto power.
Verification and decision AI Office; AI Sponsor with risk clearance. AI Auditor; AI Committee after sign-off.

8.8 Differences by ambition level

Level What is required at G5 (01 §7.6)
Optimise Efficiency validated against the baseline and a plan to materialise released capacity.
Augment Real adoption and performance improvement measured.
Transform Market or customer evidence: usage, conversion, initial revenue or verified operational change.

The adoption criteria at G5 are detailed in document 23.

8.9 Technology-specific considerations

Profile What changes
Predictive ML Validation with recent data not used in training, bias by group, threshold calibration and comparison with the current process.
Generative AI Test case set plus human review of a sample; rate of incorrect or ungrounded responses; injection and leakage tests; actual cost per transaction; transparency where applicable.
Agents Tests in an isolated environment; pilot with less autonomy than the target (for example, A1 before A2); real test of the kill switch; indirect injection and limits.
Embedded third-party AI Acceptance tests with the company's own data; check that the deployed configuration is the one contracted; rollback includes disabling the AI function.

8.10 Reference time limit

60 days in Lite and 90 in Enterprise. If the attribution method requires a longer pilot, the time limit is set at G4 and recorded.

8.11 Preparation of gate G5

8.12 Common mistakes

8.13 Events in the register

Entry into phase 5 · verification of G4 conditions · incidents in tests and pilot (T08) · sign-offs · G5 request, verification and decision · move to In production or stop (hypothesis refuted, no adoption, unacceptable risk…).


09Operation and governance (phase 6)

9.1 Objective

Operate stably, maintain control, respond to incidents and continue measuring value. Question: does it still work, deliver value and remain under control? The gate is replaced by the periodic continuity review (R6).

9.2 When it starts and when it ends

9.3 Inputs

Solution in production with delivery report and sign-offs (P21, P23) · operations documentation (P24–P26) · tested rollback plan (P19) · hypothesis and attribution (P08, P09) · adoption plan and use of released capacity (P20) · incident and nonconformity process (document 37, T08).

9.4 Step-by-step activities

# Activity Performed by Involved
1 Operate according to the manual (P24): procedures, access, maintenance and continuity. Operations Technical
2 Monitor performance, degradation, bias, costs, security and usage, with alerts and owners responsible for responding (P25). Operations Technical
3 Manage incidents (P26), record them with severity S1–S4 (P27, T08) and notify where applicable, including possible serious incidents under the EU AI Act, DORA or NIS2 (document 37). Operations Risk, Technical
4 Manage changes to the model, data, instructions, supplier version or permissions with an impact assessment. If they alter classification, autonomy or intensity, the competent body decides (section 11.7). Operations Technical, Risk
5 Carry out the post-market monitoring required by regulation (document 34). Operations Risk
6 Measure the realised value with its status and the actual costs per period (P28, T12, T13). Product Management control
7 Track adoption and the materialisation or reassignment of released capacity (P20, document 23). Product User area, people
8 Maintain the risk register and the validity of the regulatory classification and of the intensity. Risk Product
9 Prepare the R6 and, if it detects relevant deviations, propose bringing G7 forward. Operations and Product Risk, Sponsor

9.5 Roles

Sponsor I · Product C · Technical C · Operations A/R · Risk C · Auditor V (in Lite the AI Office verifies). The AI Product Owner continues to measure value and adoption; the AI Sponsor decides the R6 in Lite.

9.6 Mandatory evidence

Evidence Template Tool
Operations manual P24 —
Monitoring and alerts P25 —
Incident response plan P26 T08
Incident and change register P27 T08
Value tracking P28 T12
Risk register and intensity review at each R6 P12, P04 T06, T04
Adoption and capacity tracking P20 T20

9.7 Differences between Lite and Enterprise

Aspect Lite Enterprise
Continuity review (R6) Half-yearly; AI Office and AI Sponsor. Quarterly; AI Auditor and AI Committee.
Monitoring Performance, cost and usage. Full, with bias, security and defined on-call cover.
Visibility Aggregated board dashboard. Board dashboard by use case.

9.8 Differences by ambition level

Level What changes
Optimise Tracking focuses on converting released capacity into materialised savings; if this does not happen, the R6 records it as a deviation.
Augment Sustained performance and adoption, effective human oversight (override rate within the planned band) and reassigned capacity.
Transform Each R6 reviews learning milestones, consumption of the stage investment limit and first returns. Exceeding the approved limit requires an express decision by the body that approved it, generally as G7 (Scale).

9.9 Technology-specific considerations

Profile What changes
Predictive ML Data and concept drift, retraining as a controlled change, bias by group and comparison of predicted and actual outcomes.
Generative AI Periodic evaluations with a fixed set, human sampling of outputs, supplier model version changes treated as changes, consumption cost and complaints.
Agents Review of intent and action logs, removal of unused permissions, periodic testing of the kill switch, alerts for anomalous actions and oversight of aggregates in A3.
Embedded third-party AI Supplier changes, incidents and service levels; review of the requirement level; contract renewals as decision points.

9.10 Reference time limit

No time limit (03 §3.6). It is controlled through the R6 frequency, whose decision is taken within 5 or 10 working days of the request. An overdue R6 triggers an alert in T01.

9.11 Preparation of the R6 review

9.12 Common mistakes

9.13 Events in the register

Incidents and severity · changes · nonconformities · classification changes · request, verification and decision of each R6 · conditions · G7 brought forward (status Awaiting G7).


10Evolution or retirement (phase 7)

10.1 Objective

Decide on the basis of evidence whether the use case is scaled, iterated or retired, and check the actual ambition against the declared ambition. Question: do we scale, iterate or retire?

10.2 When it starts and when it ends

10.3 Inputs

Realised value with status and actual costs (P28, T12, T13) · incidents, changes and nonconformities (P27, T08) · risks (P12) · adoption and capacity (P20) · declared ambition (P07) · current thesis and portfolio (C2, C3) · internal or market alternatives.

10.4 Step-by-step activities

# Activity Performed by Involved
1 Consolidate the realised value by type with its status and the validated proportion, and compare it with the hypothesis and the threshold. Product Management control
2 Calculate the realised annual net value and, for scaling, the additional net value per additional euro invested. Product Management control, Technical
3 Review the actual ambition with the five questions and the production evidence (P07, T05). Product AI Office
4 Assess accumulated risks, incidents, nonconformities, regulatory validity, adoption and released capacity. Product Risk, Operations, user area
5 Analyse options: scale (scope, investment, new hypothesis), iterate (to which phase and why; keeping it unchanged is iterating to phase 6) or retire (reason and replacement). Product Technical, Operations
6 Record the lessons learned. Product All roles
7 If retirement is proposed, prepare the plan (T22): date, reason, body, replacement, data and models in line with retention obligations, revocation of access and agent identities, contracts, alternative process and communication to those affected. Product and Operations Risk, data protection officer
8 Prepare the decision (P30), request G7 and, once decided, execute it: register the new use case, return the use case to its phase or execute and verify the retirement. Product AI Office

10.5 Roles

Sponsor A · Product R · Technical C · Operations C · Risk C · Auditor V (in Lite the AI Office verifies). Operations takes part in executing the retirement.

10.6 Mandatory evidence

Evidence Template Tool
Value realisation tracking P28 T12
Scaling or retirement decision, lessons learned and retirement plan where applicable P30 T22
Actual ambition against declared ambition P07 T05

10.7 Differences between Lite and Enterprise

Aspect Lite Enterprise
Verification and decision AI Office; AI Sponsor. AI Auditor; AI Committee; board for scaling Transform.
Retirement plan Data, access and communication. Complete, with verification of its execution by the AI Auditor.
Lessons learned Brief record in T01. Session with all roles and record in P30.

10.8 Differences by ambition level

Level What is required at G7 (01 §7.6)
Optimise Materialised savings, not just released capacity.
Augment Sustained performance and reassigned capacity.
Transform Measured return and verified change in the operating model or the offering; scaling requires board approval.

If the actual ambition is lower than the declared ambition, it is reclassified in T01. The difference feeds the transformation index (document 12) and is a signal of the Declared but unevidenced transformation profile.

10.9 Technology-specific considerations

Profile What changes
Predictive ML Useful life of the model, cost of maintaining it and validity of scaling to populations different from those in the pilot.
Generative AI Comparison with alternative models; a model change when scaling is a significant change.
Agents Increasing autonomy (for example, from A2 to A3) is not a minor iteration: it is processed as Scale or as Iterate to phase 4, with a new assessment of risks and intensity.
Embedded third-party AI Retirement includes termination or amendment of the contract, return or certified deletion of data and disabling of the function; scaling usually requires renegotiation.

10.10 Reference time limit

15 days in Lite and 30 in Enterprise until the decision. Execution of the retirement is controlled using the dates in its plan in T22.

10.11 Preparation of gate G7

10.12 Common mistakes

10.13 Events in the register

Awaiting G7 · actual ambition · G7 request, verification and decision · board approval where applicable · registration of the linked use case (Scale) · return to phase (Iterate) · retirement with coded reason.


11Transitions between phases

The cycle is not linear: each gate can send the use case back to an earlier phase, stop it or open a new cycle.

Transitions between phases
What happens to the use case depending on the outcome of each gate
flowchart LR
  F["Current phase"] --> G{"Gate"}
  G -->|"Proceed or with conditions"| S["Next phase"]
  G -->|"Iterate (maximum 2 before escalating)"| F
  G -->|"Pivot (G1, G2 and G3 only)"| F2["Phase 2 with new hypothesis"]
  G -->|"Stop"| P["Stopped"]
  F -.->|"Recorded external cause"| E["On hold"]
  E -.->|"Resumption"| F
  S -.->|"After passing G5"| PR["In production with R6"]
  PR -->|"Planned time or deviation"| G7{"G7"}
  G7 -->|"Scale"| N0["New phase 0"]
  G7 -->|"Iterate"| FX["Relevant phase (6 if kept unchanged)"]
  G7 -->|"Retire"| R["Retired"]
  classDef ok fill:#d9ebe0,stroke:#0d7680,color:#1a1817
  classDef med fill:#f2dfce,stroke:#0f5499,color:#1a1817
  classDef ko fill:#f3d3da,stroke:#990f3d,color:#1a1817
  classDef espera fill:#f2dfce,stroke:#807973,color:#1a1817,stroke-dasharray:4 3
  class S,PR,N0 ok
  class F2,FX med
  class P,R ko
  class E espera
Source: SEVEN-G

Proceed with conditions. Each condition is recorded in T03 with a deadline, an owner and the gate at which it will be verified. If it expires without being met, the outcome becomes Iterate and the use case returns to the phase of the gate that imposed it; if it is already in production, it is dealt with at the next R6 or G7 is brought forward.

11.1 Iterate

11.2 Pivot

11.3 Stop

11.4 On hold

A system in production does not move to On hold: its suspension is managed with the incident response plan or the rollback plan (documents 37 and 52) and analysed at the next R6 or at a G7 brought forward.

11.5 Scaling as a new phase 0

11.6 Retirement

It is decided at G7 and executed with P30 and T22. It records date, reason, deciding body, replacement, treatment of data and models and communication to those affected (01 §6.9). The Retired status is only recorded when the AI Auditor (Enterprise) or the AI Office (Lite) verifies the execution of the plan, including the revocation of access and the update of the inventory.

11.7 Classification changes during the cycle

Change Treatment
Intensity from Lite to Enterprise Immediate when the criterion appears; pending work is completed with Enterprise templates and subsequent gates are resolved with an Enterprise verifier and decision-maker.
Intensity from Enterprise to Lite Only at G3 or R6, with recorded justification.
Ambition Proposed in phase 1, confirmed in phase 2 and reviewed in phase 7. A change to Transform at any other time requires Enterprise intensity and board approval before proceeding.
Regulatory classification If it becomes high risk or a possible prohibited practice is detected, the use case returns to phase 3 or, if it is in production, G7 is brought forward.
Agent autonomy Any increase is a significant change: new risk assessment, intensity review and decision by the competent body before applying it.

11.8 Use cases predating adoption of the framework

They are regularised within the time limit approved in C2 through a review equivalent to G7 (01 §14). The evidence for phases 6 and 7 is prepared, together with the essential evidence from earlier phases (regulatory classification, risks, rollback plan), expressly identified as produced during regularisation, so it does not constitute documentation produced after the fact within the meaning of 01 §7.4.


12Associated tools and templates

The templates for each phase are in the table in section 2.2 and in section 6 of each manual; P29 (gate decision record) is used at all gates and P31 (use case record) from phase 1 to phase 7.

Tool Phases
Use case register · Gate manager (T01 · T03) All
Inventory · Intensity determination · Regulatory classifier (T02 · T04 · T07) 0, 3, 6
Ambition classifier (T05) 1, 2, 7
Risks · Suppliers · Costs per use case (T06 · T09 · T13) 3–7
Incidents and nonconformities · Agent security (T08 · T10) 4–6
Value hypothesis · Value realisation tracking (T11 · T12) 2, 5, 6, 7
Adoption and capacity plan · Retirement manager (T20 · T22) 4–7

Document Relationship
01 · Foundational methodology Normative reference that these manuals develop.
03 · Tools and use case register Statuses, events, time limits and tools.
12 · Transformation index Ambition criteria and effect of actual ambition.
13 and 14 · AI thesis and portfolio management Thresholds, horizon, time limits and retirement criteria.
21 and 22 · Gate criteria and checklists G<n>.<nn> and R6.<nn> criteria and LV- controls.
23 · Adoption and change Adoption plan, released capacity and adoption criteria.
30 · Governance model Bodies and escalation of decisions.
33 to 37 · Risk, regulation, security, third parties and incidents Scales, obligations and controls applied in phases 3 to 6.
40 to 43 · Measurement and value Rules, indicators, costs and benefits realisation.
52 and 53 · Operations and construction Operations in phase 6 and AI-assisted construction in phases 4 and 5.

14Version control

Version Date Changes
0.1 16-09-2026 First version. Develops phases 0–7 of document 01 with thirteen common sections, differences by intensity, ambition and technology, links to templates P01–P31 and tools from 03, and transition rules (iterate, pivot, stop, on hold, scaling, retirement, classification changes and regularisation). Consistency adjustments with 01 (segregation of duties in Lite, R6 outcomes, agent criterion) and with 34 and 37.

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.