SEVEN-G
Template P09 · 16-09-2026

Template P09 · Baseline

Baseline

Measures the starting position of the value hypothesis metrics, with a reproducible method, so that subsequent value is incremental and verifiable.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used In phase 2, before G2, in parallel with the value hypothesis canvas (P08). The baseline is frozen at G2 and used in phases 5, 6 and 7.
Who completes it The AI Product Owner, with the owner of the process data. Management control reviews the unit values.
Who verifies it Lite: AI Office. Enterprise: AI Auditor.
Who decides It is approved with G2: sponsor (Lite) · AI Committee (Enterprise).
Gate at which it is reviewed Hypothesis. It is consulted again at G5, R6 and G7. (G2)
Tool T11 · Value hypothesis canvas and calculator.
Lite versus Enterprise Lite may omit the fields and blocks marked (Enterprise). The definition of metrics, the period, the method and the results are mandatory in both.

Completion rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN.
Use case name
Version of the associated canvas Version of P08 to which this baseline corresponds.
Document version
Date DD-MM-AAAA.
Author Name and role.
Freeze date Date of G2. Thereafter it is only modified in accordance with section 9.

03Definition of the metrics

Metric Type Operational definition Formula Unit Data source Data owner
Main · Secondary · Safeguard
(illustrative example) Average time to first response Secondary Hours from receipt of the query to the first useful response to the customer Sum of times ÷ no. of queries hours Customer service tool Head of customer service operations
(illustrative example) External customer service hours Main (economic) Hours invoiced by the external customer service supplier Monthly sum of invoiced hours h Supplier invoices Management control

The operational definition answers: what is counted, what is excluded, from when and until when, and in which system it is recorded.


04Measurement period and method

Field Content Guidance
Reference period Start and end dates.
Justification of the duration It must cover the relevant cycles of the process (weeks, months, campaigns).
Scope or population Channels, units, customers or cases included.
Sample (Enterprise) If the whole population is not measured: size, selection criterion and representativeness.
Measured or estimated Measured · Estimated. If estimated, justification and plan to measure it before G5.
Extraction method Query, report or system from which it is obtained.
Exclusions Cases excluded and reason.
Treatment of missing data How they are shown and how many there are.
Data quality Completeness and known problems.

05Baseline results

Metric Period Value Variability No. of observations Status Remarks
Minimum–maximum or standard deviation Measured · Estimated · No data
(illustrative example) Average time to first response 01-01-2026 to 30-06-2026 26.4 h 9.1–41.7 h (monthly average) 96,300 Measured Peaks during January campaigns.
(illustrative example) External customer service hours 01-01-2026 to 30-06-2026 5,150 h 610–1,240 h/month 6 invoices Measured —
(illustrative example) Satisfaction of the customer served 01-01-2026 to 30-06-2026 No data — — No data The survey is activated in October; it will be measured four weeks before the pilot.

06Unit values for translation into money

Item Unit value (€) Source Reference date Reviewed by management control
Yes · No
(illustrative example) Cost per hour of external customer service 21.00 Current contract with the supplier 01-06-2026 Yes
(illustrative example) Average margin per order 9.00 Channel income statement First half of 2026 Yes

The unit values are used in the P08 formula (units × unit value). If they change after G2, this is recorded in section 9.


07Control group

Complete if the attribution method in P08 is a control group.

Field Content Guidance
Definition of the control group Which cases, customers or units do not receive the intervention.
Assignment criterion Random, by region, by shift or other, with justification.
Comparability Baseline values in the control group and in the treated group.
Risk of contamination How the control group is prevented from receiving effects of the intervention.
Metric Treated group (baseline) Control group (baseline) Difference Comparable?
Yes · No

08External factors and seasonality

Factor Expected effect on the metric How it is corrected or controlled
(illustrative example) Sales campaign 60% increase in queries in January Compare with the same period of the control group and not with the annual average.

09Freeze and subsequent changes

After G2, the baseline may only be modified because of a documented material error or a change in the definition of a metric, with the approval of the body that authorised the use case. Modifying it to favour the result is a nonconformity.

Date Metric Previous value New value Reason Approved by

10Reproducibility (Enterprise)

Field Content Guidance
Query or calculation procedure Link to the versioned query, script or report.
Version or snapshot of the data Identifier of the extraction used.
Location Repository where it is kept.
Person able to reproduce it Different from whoever calculated it.

11Quality criteria

The formal G2 criteria are in document 21 (see criteria G2.xx).

# Check Status
1 Each P08 metric has an operational definition, formula and source. Met · Not met · Not applicable · Pending
2 The period covers the relevant cycles of the process.
3 The baseline is measured or its estimate is justified with a measurement plan.
4 Missing data appears as "no data".
5 The unit values have a source and management control review.
6 If there is a control group, its comparability is demonstrated.
7 The freeze date is recorded.

12Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Prepares AI Product Owner
Provides data Owner of the process data
Reviews unit values Management control
Verifies AI Office (Lite) · AI Auditor (Enterprise)
Decides AI Sponsor (Lite) · AI Committee (Enterprise), with G2

Segregation of duties: the verifier has not calculated the baseline.


13Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 16-09-2026 First version. Structure aligned with 01 §6.4 and with measurement rules 1 and 8 in 00 §6.