SEVEN-G
Template P17 · 19-10-2026

Template P17 · Governance and human oversight design

Governance and human oversight design

Establishes what the system decides, what a person validates and what is never delegated, with what autonomy level and with what human oversight modes.

Fernando García VarelaVersion 0.2 (working draft)19-10-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used Phase 4 (Solution design), before requesting G4. It is reviewed at G5 with what was observed in the pilot and at every R6, or earlier if the autonomy level or the affected population changes.
Who completes it AI Product Owner and AI Technical Owner, with the business area that will use the system.
Who verifies it AI Office under Lite; AI Auditor under Enterprise. The AI Risk Owner issues clearance.
At which gate it is reviewed G4; its actual operation is checked at G5 (P22) and at R6.
Lite versus Enterprise Lite may omit the fields marked (Enterprise). A system at level A2 or A3 whose actions affect third parties, money, personal data or production systems is Enterprise (criterion "agents with the ability to act", 01 §9.2).
Relationship P04 Intensity determination · P11 Regulatory classification · P18 Security design · P19 Rollback plan · P24 Operations manual · P25 Monitoring · document 35 (autonomy and AG controls) · document 52.

Rules:

This template does not constitute legal advice. Obligations regarding human oversight and automated decisions are confirmed with the regulatory mapping (document 34).


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
Use case name
AI system(s) Identifier in the inventory (T02).
Intensity Lite · Enterprise.
Ambition level Optimise · Augment · Transform.
Regulatory classification Prohibited · High risk · Transparency obligations · Minimal risk · Out of scope · Pending classification.
Document version
Author Role and name.
Date DD-MM-AAAA.
Document status Draft · Submitted for verification · Verified · Approved · Superseded.

03Decision context

Field Content Guidance
Process or decision in which the system intervenes Describe it in business language (P31).
Users Who uses the output.
Affected persons Who receives the effect: customers, employees, citizens, suppliers.
Does it significantly influence decisions about people? Yes · No. If Yes, it is an Enterprise criterion.
Are there decisions based solely on automated processing with legal or similarly significant effects? Yes · No · To be determined. If Yes or To be determined, data protection must analyse Article 22 of the GDPR.
Consequence of a system error What happens if the output is incorrect and who bears it.
Reversibility of the decision or action Reversible at no cost · Reversible at a cost · Irreversible.

04Autonomy level

Tick a single level. The levels are defined in document 35.

Level Name What the system does Human role Tick
A0 Assistance Informs, summarises or generates content. The person decides and executes. ☐
A1 Recommendation Proposes a specific decision or action. The person validates each action before it is executed. ☐
A2 Supervised action Executes actions within defined limits. Supervises, can interrupt and reviews after the fact. ☐
A3 Autonomous action Executes sequences of actions without individual review within strict limits. Sets limits, supervises aggregates and has a kill switch. ☐
Field Content Guidance
Justification for the level chosen Why a lower level is not enough. The lowest level that achieves the objective is preferable.
Level in the pilot It may be lower than the target (for example, A1 in the pilot and A2 in production).
Conditions for moving up a level (Enterprise) Evidence required (results, override rate, incidents) and the body that authorises it.
Conditions for moving down a level Thresholds that require autonomy to be reduced; they are carried over to P19 as a degraded mode.

05Allocation of decisions

One row per decision or action in the process. Allocation: The system decides · A person validates · Never delegated.

Decision or action Allocation Justification Role that validates or decides Information needed by the validator
Prioritise the queue of incoming requests (illustrative example) The system decides Reversible, with no direct effect on the person; processing remains human — —
Propose the resolution of a request (illustrative example) A person validates Affects the applicant; requires checking of documentation Case handler Proposed outcome, main reasons and documents consulted
Reject a request (illustrative example) Never delegated Significant effect on the person; requires human reasoning Head of the area Complete case file

Decisions that the company has declared non-delegable in its corporate policy (document 31) and that apply to this system:

Non-delegable decision Reference in the policy How it is technically guaranteed

06Human oversight modes

Modes: Prior validation (a person approves each output before it takes effect) · Real-time oversight (a person observes and can intervene while the system acts) · Sample-based after-the-fact review · Aggregate oversight through indicators and thresholds.

Mode Applies? (Yes · No) Scope Responsible role Frequency or sample size Intervention criterion Where it is recorded
Prior validation
Real-time oversight
Sample-based after-the-fact review
Aggregate oversight

Guidance: A1 requires prior validation; A2 requires at least real-time oversight or after-the-fact review, and a kill switch; A3 requires aggregate oversight, strict limits (P18) and a tested kill switch (P19).


07Effective capability of the overseer

Requirement How it is guaranteed Evidence
Understands the capabilities and limitations of the system Training recorded in P20; limitations from P16.
Is aware of the risk of over-relying on the automated output Training and interface design.
Can correctly interpret the output Explanation or reasons shown alongside the output.
Can decide not to use, correct, override or reverse the output Function available and logged.
Can interrupt the system Kill switch (P18) and who can activate it.
Has time and a workload compatible with oversight (Enterprise) Expected volume per person and time per review.

In high-risk systems, these requirements are checked against Article 14 of the EU AI Act (document 34).


08Transparency and rights of affected persons

Field Content Guidance
Are people informed that they are interacting with an AI system or that the content is generated? Yes · No · Not applicable. How and at what point.
Information on the logic and the reasons for the output What is explained and to whom.
Channel for requesting human review or contesting Channel, internal response time limit and role that reviews.
Log of complaints related to the system (Enterprise) Where they are recorded and how they feed P25 and P27.
Immediate handover to a person (direct exposure) Signs of vulnerability that trigger it, express request, channel and maximum time until a person responds (35 §4.6).
Log of handovers Where reason, time and time to response are recorded; they are carried over to P25.

Notice texts and register in P49.


09Responsibilities and escalation

Role Holder Deputy Oversight responsibility Escalates to
AI Product Owner Design of the allocation of decisions and of adoption AI Sponsor
AI Operations Owner Day-to-day operation of oversight and alerts AI Committee in S1–S2 incidents (P26)
Designated overseers Validation, review and override AI Operations Owner
AI Risk Owner Clearance on the sufficiency of oversight AI Committee

10Oversight indicators

They are carried over to P25 with their thresholds.

Indicator Definition Alert threshold Frequency
Human override rate Outputs corrected or rejected ÷ outputs reviewed
Average validation time Time between proposal and validation
After-the-fact review coverage Outputs reviewed ÷ outputs produced
Acceptance without effective review (Enterprise) Validations taking less than the reasonable minimum time
Complaints from affected persons Number per period
Handovers to a person Handovers by reason and requests not served

11Quality criteria

The formal G4 criteria on human oversight are in document 21 (and its checklist LV-G4 in document 22); autonomy controls are in the AG controls of document 35.

# Check Status (Met · Not met · Not applicable · Pending)
1 A single autonomy level is assigned and justified.
2 Each relevant decision in the process has an allocation, and the non-delegable ones are identified.
3 The oversight modes are consistent with the autonomy level.
4 The overseer can override and interrupt, and is trained to do so.
5 There is a human review channel for affected persons where appropriate.
6 The oversight indicators have a threshold and have been carried over to P25.
7 Data protection has reviewed the applicability of Article 22 of the GDPR where appropriate.

12Approval and verification

Function Role Name Date Signature or reference
Author AI Product Owner
Co-author AI Technical Owner
Clearance AI Risk Owner
Verifier AI Office (Lite) · AI Auditor (Enterprise)
Gate decision-maker According to 01 §7.5 (recorded in P29)

Segregation of duties: the AI Risk Owner and the verifier are not part of the team that builds; no one verifies or approves their own work.


13Version control

Version Date Changes
0.1 16-09-2026 First version of the template.
0.2 19-10-2026 Immediate handover to a person and handover log (8) and handover indicator (10) (35 §4.6) (D159).

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.