Legal notice and disclaimer. SEVEN-G is a reference methodological framework provided "as is" and for information purposes only. It does not constitute legal, regulatory, financial or professional advice, nor does it guarantee compliance with any law or standard. References to general regulation (such as the EU AI Act, the GDPR, DORA or NIS2), to technical standards and to regulation specific to each sector or jurisdiction may be incomplete, may not apply to a particular case or may become out of date as a result of regulatory changes, interpretations or supervisory positions after their consultation date. Each organisation that uses SEVEN-G is solely responsible for identifying the regulation that applies to it, verifying that it is current and certifying its own regulatory compliance, with the appropriate qualified advice. This methodology is a generic, free aid shared with the community so that nobody has to start from scratch; each person or organisation can and should adapt it to its own use. It must not be inferred that its legally sensitive parts have been reviewed by legal counsel: those reviews, for each company or sector, are the ultimate responsibility of the company, consultant or organisation that uses it. Although every effort is made to keep it up to date, some regulation may have changed without being reflected here. To the fullest extent permitted by law, the author accepts no responsibility whatsoever for the effects of its application in any organisation or for its full applicability. The methodology does not grant certification of any kind. The author accepts no liability for any use made of this content or for any decisions taken on the basis of it. The data, figures, companies and cases in the examples are fictitious or illustrative.
01Instructions for use
| Aspect | Guidance |
|---|---|
| When it is used | It is designed in phase 4, configured and tested in phase 5 and maintained in phase 6. |
| Who completes it | AI Operations Owner, with the AI Technical Owner and the AI Product Owner (adoption and value metrics). |
| Who verifies it | AI Office at Lite intensity; AI Auditor at Enterprise intensity. |
| At which gate it is reviewed | G4 (design), G5 (tested configuration) and R6 (currency of thresholds). |
| Lite versus Enterprise | Lite may omit the fields marked (Enterprise). Every use case in production must monitor, as a minimum, performance, availability, cost and the human oversight indicators of P17. |
| Relationship | P09 Baseline · P16 Lineage (drift reference) · P17 Oversight indicators · P18 Action log · P19 Rollback triggers · P24 Operations manual · P26 Incident response · P28 Value tracking · documents 41 (Indicator catalogue) and 52. |
Rules:
- Each rollback trigger in P19 must have an alert in this document.
- "No data" is not zero: the absence of a metric is in itself an alert, never a normal value.
- The severity of an alert is an initial proposal; the severity of the incident is classified using the criteria of document 37 (P26).
- Threshold changes are recorded in P27 with their reason.
02Identification
| Field | Content | Guidance |
|---|---|---|
| Use case code | IA-AAAA-NNN (T01). | |
| AI system(s) | Identifier in the inventory (T02). | |
| Technology | Predictive ML · Generative AI · Agent · Language and document processing · Vision · Optimisation · Embedded third-party AI · Rules (not AI). | |
| Intensity | Lite · Enterprise. | |
| Monitoring tool | Name of the internal or provider tool. | |
| Document version | ||
| Author | Role and name. | |
| Date | DD-MM-YYYY. | |
| Document status | Draft · Submitted for verification · Verified · Approved · Superseded. |
03Metrics catalogue
Category: Model performance · Data drift · Usage drift · Input data quality · Bias and fairness · Availability and latency · Cost and consumption · Security · Agent behaviour · Human oversight · Adoption · Value.
| ID | Metric | Category | Definition and formula | Source | Calculation frequency | Reference value | Warning threshold | Critical threshold | Owner |
|---|---|---|---|---|---|---|---|---|---|
| M-01 (illustrative example) | Human override rate | Human oversight | Proposals rejected or corrected ÷ proposals reviewed, daily | Validation log | Daily | 8% (pilot) | > 15% | > 25% on two consecutive days | AI Operations Owner |
| M-02 (illustrative example) | Model consumption cost | Cost and consumption | Daily sum invoiced by the provider | Provider console | Daily | €65/day | > €90/day | > €150/day | AI Product Owner |
| M-03 (illustrative example) | Actions blocked by limits | Agent behaviour | No. of actions blocked by limits or intent-based access control | Action log (P18) | Continuous | 0–3/day | > 10/day | Any action executed outside limits | Information security |
| M-04 (illustrative example) | Input data freshness | Input data quality | Hours since the last successful load | Load process | Hourly | < 2 h | > 4 h | > 12 h or no data | Technical on-call |
04Minimum metrics by type of system
Tick those that apply and link the ID from block 3.
| Metric | Predictive ML | Generative AI | Agent | ID in block 3 |
|---|---|---|---|---|
| Performance against reference (with actual outcome when available) | ☐ | ☐ | ☐ | |
| Drift in input variables | ☐ | |||
| Usage drift: distribution of topics or intents and queries outside the validated scope | ☐ | ☐ | ||
| Performance differences between groups (Enterprise) | ☐ | ☐ | ☐ | |
| Unequal responses in counterfactual pairs (mandatory if the system decides, recommends or communicates with people, or has direct exposure) | ☐ | ☐ | ||
| Ungrounded responses or responses flagged as incorrect by users | ☐ | ☐ | ||
| Detection of prompt injection attempts | ☐ | ☐ | ||
| Detected leakage of confidential or personal data | ☐ | ☐ | ||
| Actions executed, blocked and validated by people | ☐ | |||
| Kill switch activations | ☐ | |||
| Human override rate and validation time | ☐ | ☐ | ☐ | |
| Availability, latency and errors | ☐ | ☐ | ☐ | |
| Consumption and infrastructure cost | ☐ | ☐ | ☐ | |
| Days in cost-driven degraded mode and quality during the mode | ☐ | ☐ | ||
| Effective use (adoption) | ☐ | ☐ | ☐ |
References for generative AI and agents (document 52 §4.2.6, §4.2.7 and §10.3):
| Field | Content | Guidance |
|---|---|---|
| Usage reference | Topics, intents and scope validated at G5, with their reference distribution (P16). | |
| Query classification | Rules, classifier or human sampling; sample size and frequency. | |
| Counterfactual pairs | Protected attributes or proxies tested (according to the impact assessment), number of pairs and what counts as a material difference (decision, amount, tone, refusal, completeness). Threshold in P17. | |
| Minimum quality in degraded mode | Minimum value of the quality metric below which the system moves to the next level of the cascade; sampling at least doubled during the mode. |
05Alert rules
Proposed initial severity: S1 Critical · S2 High · S3 Medium · S4 Low (confirmed using document 37). Associated action: Review · Apply P24 procedure · Open incident (P26) · Activate rollback trigger (P19) · Kill switch.
| Alert ID | Condition (metric and threshold) | Initial severity | Recipient | Channel | Maximum acknowledgement time | Associated action | P19 trigger |
|---|---|---|---|---|---|---|---|
| AL-01 (illustrative example) | M-01 > 25% on two consecutive days | S2 High | AI Operations Owner | On-call tool | 2 working hours | Activate rollback trigger | D-01 |
| AL-02 (illustrative example) | M-03: action executed outside limits | S1 Critical | Technical on-call and security | Immediate notification | 15 minutes | Kill switch and open incident | D-02 |
| AL-03 (illustrative example) | Any critical metric with no data for more than one cycle | S3 Medium | Technical on-call | On-call tool | 4 working hours | Apply P24 procedure | — |
| AL-04 (illustrative example) | Month-to-date cost ≥ 100% of the budget | S4 Low | AI Operations Owner | On-call tool | 4 working hours | Apply P24 procedure (cost-driven degradation cascade, level N2) | D-04 |
06Dashboards and recipients
| Dashboard or report | Recipients | Content | Frequency |
|---|---|---|---|
| Operational dashboard | Operations owner and on-call | All block 3 metrics in near real time | Continuous |
| Oversight report | Product owner and supervisors | Human oversight indicators and complaints | Weekly |
| Report for R6 | R6 decision-maker | Trends, alerts, incidents and value | According to intensity |
| Data for the board dashboard (Enterprise) | AI Office | Aggregated indicators in the dashboard format (T17) | Quarterly |
07Configuration testing
Each alert with a rollback, kill switch or incident action is tested before G5.
| Alert ID | Test date | Method (Simulation of the condition · Injection of test data · Other) | Did it reach the recipient on time? (Yes · No) | Result (Passed · Not passed) | Observations |
|---|---|---|---|---|---|
08Threshold review
| Field | Content | Guidance |
|---|---|---|
| Review frequency | At least at each R6. | |
| Who proposes changes | AI Operations Owner. | |
| Who approves changes | Technical owner with risk clearance for critical thresholds. | |
| Threshold change log | P27, with reason and previous value. | |
| Recalibration after relevant changes (Enterprise) | A new model version or population entails reviewing reference values. |
09Quality criteria
Formal G4, G5 and R6 criteria in document 21.
| # | Check | Status (Met · Not met · Not applicable · Pending) |
|---|---|---|
| 1 | Each metric has a definition, source, reference, thresholds and owner. | |
| 2 | The minimum metrics for the type of system are covered. | |
| 3 | Every P19 trigger and every P17 oversight indicator has an alert. | |
| 4 | The absence of data generates an alert. | |
| 5 | Critical alerts have been tested and reach the recipient on time. | |
| 6 | Threshold changes are recorded with their reason. | |
| 7 | For generative AI and agents, the usage reference, the counterfactual pairs where applicable and the minimum quality in degraded mode are set. |
10Approval and verification
| Function | Role | Name | Date | Signature or reference |
|---|---|---|---|---|
| Author | AI Operations Owner | |||
| Co-author | AI Technical Owner | |||
| Clearance of critical thresholds | AI Risk Owner | |||
| Verifier | AI Office (Lite) · AI Auditor (Enterprise) | |||
| Gate decision-maker | As per 01 §7.5 (recorded in P29) |
Segregation of duties: the verifier is not part of the team that builds or operates the system.
11Version control
| Version | Date | Changes |
|---|---|---|
| 0.1 | 16-09-2026 | First version of the template. |
| 0.1 | 18-09-2026 | Usage drift, unequal responses in counterfactual pairs and days in cost-driven degraded mode in the minimum metrics; references for generative AI and agents; example alert AL-04; quality criterion 7. |