Legal notice and disclaimer. SEVEN-G is a reference methodological framework provided "as is" and for information purposes only. It does not constitute legal, regulatory, financial or professional advice, nor does it guarantee compliance with any law or standard. References to general regulation (such as the EU AI Act, the GDPR, DORA or NIS2), to technical standards and to regulation specific to each sector or jurisdiction may be incomplete, may not apply to a particular case or may become out of date as a result of regulatory changes, interpretations or supervisory positions after their consultation date. Each organisation that uses SEVEN-G is solely responsible for identifying the regulation that applies to it, verifying that it is current and certifying its own regulatory compliance, with the appropriate qualified advice. This methodology is a generic, free aid shared with the community so that nobody has to start from scratch; each person or organisation can and should adapt it to its own use. It must not be inferred that its legally sensitive parts have been reviewed by legal counsel: those reviews, for each company or sector, are the ultimate responsibility of the company, consultant or organisation that uses it. Although every effort is made to keep it up to date, some regulation may have changed without being reflected here. To the fullest extent permitted by law, the author accepts no responsibility whatsoever for the effects of its application in any organisation or for its full applicability. The methodology does not grant certification of any kind. The author accepts no liability for any use made of this content or for any decisions taken on the basis of it. The data, figures, companies and cases in the examples are fictitious or illustrative.
01Instructions for use
| Aspect | Guidance |
|---|---|
| When it is used | Throughout phase 6. It is opened at go-live and closed at retirement (P30). |
| Who completes it | AI Operations Owner (incidents and changes); the coordinator of each incident completes its record. |
| Who verifies it | AI Office at Lite intensity; AI Auditor at Enterprise intensity, by sampling and at each R6. |
| At which gate it is reviewed | R6 and G7. S1 and S2 incidents are also reviewed by the AI Committee. |
| Lite versus Enterprise | Lite may omit the fields marked (Enterprise). No incident or relevant change may be left unrecorded. |
| Tool | T08 Nonconformity and incident register. If the company uses another incident or change tool, this log links its identifiers and adds the AI-specific fields. |
| Relationship | P16 Lineage · P19 Rollback · P24 Operations manual (types of change) · P25 Alerts · P26 Response plan · P12 Risk register · document 37. |
Rules:
- Every change is an event with a date, an author and a reason (03 §2, principle 2).
- Incidents are coded INC-AAAA-NNN and nonconformities NC-AAAA-NNN; identifiers are not reused.
- Severity is classified using the criteria of document 37 and may be revised; both the initial and the final severity are kept.
- A relevant change executed without approval is a nonconformity (document 37).
- "No data" is not zero: if an impact is unknown, it is recorded as No data.
This template does not constitute legal advice.
02Identification
| Field | Content | Guidance |
|---|---|---|
| Use case code | IA-AAAA-NNN (T01). | |
| AI system(s) | Identifier in the inventory (T02). | |
| Intensity | Lite · Enterprise. | |
| Period covered | From DD-MM-YYYY to DD-MM-YYYY. | |
| Log owner | AI Operations Owner. | |
| Document version | ||
| Date of last update | DD-MM-YYYY. | |
| Document status | Open · Closed on retirement. |
03Incident log
3.1 Summary
Type: Performance degradation · Erroneous output with impact · Discriminatory or biased output · Information leakage · Unauthorised action by an agent · Prompt injection or manipulation · Unavailability · Regulatory breach · Misuse of the system · Supplier incident. Status: Open · Contained · Resolved · Closed.
| Code | Date and time of detection | Type | Initial / final severity | Brief description | Coordinator | Status | Closure date |
|---|---|---|---|---|---|---|---|
| INC-2026-007 (illustrative example) | 14-07-2026 10:42 | Erroneous output with impact | S3 / S2 | The assistant informed customers of a repealed return period | AI Operations Owner | Closed | 02-08-2026 |
3.2 Incident record
One record per incident.
| Field | Content | Guidance |
|---|---|---|
| Code | INC-AAAA-NNN. | |
| Detected by | P25 alert (ID) · User · Affected person · Supplier · Audit · Other. | |
| Estimated start date and time | May precede detection. | |
| Affected system version | Model, instructions, knowledge base (P16). | |
| Description | What happened, in plain language. | |
| People and processes affected | Number and type; No data if unknown. | |
| Initial and final severity, with justification | S1 · S2 · S3 · S4, using the criteria of document 37. | |
| Containment actions and time | Kill switch, rollback, reduction of autonomy, etc. | |
| Time from detection to containment | In minutes or hours. | |
| Reports checked | Result of the boxes in block 8 of P26: whether it applies, who reported, when and evidence, and P51 register. | |
| Root cause | Technical, data, process, supplier or oversight (P52). | |
| Corrective actions | What is changed, owner, date and verification. Changes are recorded in block 4. | |
| Linked nonconformity | NC-AAAA-NNN (P50) if the incident reveals a breach of the framework. | |
| Effect on the risk register | Risks reviewed in P12 and change in level. | |
| Effect on classification or intensity (Enterprise) | Does it require P04 or P11 to be reviewed? | |
| Economic impact | Amount with formula and status (validated · declared · estimated), or No data. | |
| Human review of affected outputs | How affected decisions or actions were identified and corrected. | |
| Lessons learned | What will be done differently; carried over to P30 and to C5. | |
| Closed by | Role; in S1 and S2 the closure is verified by the AI Risk Owner. |
04Change log
4.1 Summary
Type: Minor · Relevant · Emergency (defined in P24). Component: Model · System instructions · Knowledge base · Training data · Agent tools or permissions · Autonomy level · Monitoring thresholds · Integration or infrastructure · Supplier · Population or purpose. Status: Requested · Approved · Executed · Rolled back · Rejected.
| Change identifier | Date | Type | Component | Description | Approved by | Status | Related incident |
|---|---|---|---|---|---|---|---|
| (identifier from the change tool) (illustrative example) | 20-07-2026 | Relevant | Knowledge base | Replacement of the returns policy with the version in force and withdrawal of repealed documents | Technical owner with risk clearance | Executed | INC-2026-007 |
Changes use the identifier from the company's change management tool; this log does not create its own coding.
4.2 Record of a relevant or emergency change
| Field | Content | Guidance |
|---|---|---|
| Identifier | From the change tool. | |
| Reason | Improvement · Incident correction · Regulatory requirement · Change of supplier · Other. | |
| Previous and new version | Updates P16. | |
| Tests performed and result | Regression, bias, security, injection, depending on the component. | |
| Applicable rollback plan | Reference to P19; has it been updated? | |
| Does it change the autonomy level, the purpose or the population? | Yes · No. If Yes, it requires verification and a decision equivalent to G4/G5 and a new sign-off (P23). | |
| Does it require reviewing the regulatory classification, intensity or risks? | Yes · No, with justification. | |
| Updated evidence | Templates modified and new version. | |
| Approval | Role, name and date, prior to execution except in an emergency. | |
| Subsequent emergency recording | Date and time of recording and of the after-the-fact approval. |
05Period indicators
They are incorporated into the R6 continuity review.
| Indicator | Value for the period | Previous period | Observations |
|---|---|---|---|
| Incidents by severity (S1 · S2 · S3 · S4) | |||
| Median time from detection to containment (S1–S2) | |||
| Incidents with regulatory reporting | |||
| Incidents open at the end of the period | |||
| Relevant changes executed | |||
| Emergency changes | |||
| Changes executed without prior approval (should be zero) | |||
| Rollbacks executed | |||
| Linked open nonconformities |
06Quality criteria
Formal R6 and G7 criteria in document 21; process in document 37.
| # | Check | Status (Met · Not met · Not applicable · Pending) |
|---|---|---|
| 1 | All incidents have a code, justified severity and status. | |
| 2 | S1 and S2 incidents have a complete record, root cause and reports checked. | |
| 3 | Relevant changes have tests, prior approval and an updated P16. | |
| 4 | Changes in autonomy, purpose or population have gone through verification and a decision equivalent to G4/G5. | |
| 5 | Detected breaches have an open nonconformity. | |
| 6 | The period indicators have been calculated for R6. |
07Approval and verification
| Function | Role | Name | Date | Signature or reference |
|---|---|---|---|---|
| Log owner | AI Operations Owner | |||
| Verification of S1–S2 closures | AI Risk Owner | |||
| Period verifier | AI Office (Lite) · AI Auditor (Enterprise) | |||
| Review | R6 decision-maker (recorded in P29) |
Segregation of duties: the operations owner does not verify the evidence of their own operation (01 §8.1).
08Version control
| Version | Date | Changes |
|---|---|---|
| 0.1 | 16-09-2026 | First version of the template. |