SEVEN-G
Template P30 · 16-09-2026

Template P30 · Scale or retire decision

Scale or retire decision

Substantiates the G7 decision —scale, iterate or retire— with evidence, plans the retirement where appropriate and captures the lessons learned.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used Phase 7 (Evolution or retirement), before G7. Also when an R6 continuity review brings G7 forward due to relevant deviations, and in the regularisation of systems pre-dating the adoption of the framework (01 §14).
Who completes it AI Product Owner (evidence, options and lessons), with the AI Operations Owner (retirement plan).
Who verifies it AI Office at Lite intensity; AI Auditor at Enterprise intensity.
Who decides Sponsor at Lite intensity; AI Committee at Enterprise intensity. Scaling a Transform use case also requires board approval (01 §7.5). The decision is recorded in P29.
Lite versus Enterprise Lite may omit the fields marked (Enterprise). The retirement plan (block 8) is always completed when the outcome is Retire.
Tool T22 Retirement manager.
Relationship P07 Ambition classification (review in phase 7) · P12 Risk register · P16 Lineage · P20 Adoption and capacity · P27 Incident and change log · P28 Value tracking · P29 Gate decision record · document 14 (Portfolio management).

Rules:

This template does not constitute legal advice. The retention and deletion of data must be validated with data protection and legal counsel.


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
Use case name
AI system(s) Identifier in the inventory (T02).
Confirmed ambition level Optimise · Augment · Transform.
Intensity Lite · Enterprise.
Origin of the decision Ordinary G7 · G7 brought forward by R6 · Regularisation · Portfolio decision.
Go-live date
Document version
Author Role and name.
Date DD-MM-YYYY.
Document status Draft · Submitted for verification · Verified · Approved · Superseded.

03Summary of the evidence

Magnitude Value Status or source Guidance
Realised annual efficiencies (€) Validated · Declared · Estimated P28.
Realised annual return (€) P28.
Actual annual recurring cost (€) P28.
Annual net value (€) Efficiencies + return − recurring cost.
Proportion of validated value P28.
Expected annual net value in the hypothesis (€) P08.
Released capacity: realised · reassigned · pending (hours) P28 block 6; not counted.
Total investment made (€)
Main residual risk and trend Low · Medium · High · Critical P12.
S1–S2 incidents since go-live P27.
Open nonconformities Document 37.
Adoption against target P20.
Currency of the regulatory classification Current · Requires review P11.

04Declared versus actual ambition

The five classification questions are answered again using actual evidence (00 §5.2).

# Question Answer in phase 2 (Yes · No) Answer with actual evidence (Yes · No) Evidence
1 Does it change the value proposition received by the customer or end user?
2 Is the process redesigned end to end, and not just a task?
3 Do roles, organisational structure or who makes which decisions change?
4 Does it generate revenue, services or markets that did not exist before?
5 Could it be retired without affecting the business model, simply returning to the previous cost?
Field Content Guidance
Actual ambition level Optimise · Augment · Transform. If it differs from the confirmed level, P07 and the register are updated.
Compliance with the G7 criterion for the level (01 §7.6) Optimise: realised savings · Augment: sustained performance and reassigned capacity · Transform: measured return and verified change. Status: Met · Not met · Pending.

05Options assessed

Option Arguments for Arguments against Additional investment (€) Expected additional annual net value (€) Additional net value per euro Timeframe
Scale
Iterate —
Retire Retirement cost Recurring cost savings minus value lost —

A scaling potential without additional investment, hypothesis and timeframe is not a data point (measurement rule 4).


06Decision

Field Content Guidance
Outcome Scale · Iterate · Retire.
Reason Based on blocks 3 to 5.
Coded reason (if Retire) No plausible value · Hypothesis refuted · Insufficient data · Technically unfeasible · Cost exceeds value · Unacceptable risk · Regulation · No adoption · Replaced by another solution · Change in strategic priority.
Deciding body and date Sponsor (Lite) · AI Committee (Enterprise).
Board approval Mandatory for Scale in Transform. Date and reference of the minutes.
Gate decision record Reference to P29.

07If scaling or iterating

Field Content Guidance
Extended scope (Scale) New areas, countries, users, uses or functions.
New phase 0 (Scale) The extended scope starts a new phase 0 with its charter (P01); its treatment in the register is governed by document 14.
Planned changes in intensity or classification (Scale) For example, the extended scope introduces direct exposure to customers.
Phase to return to (Iterate) And what must change in order to return to G7.
Planned date of the new review (Iterate)

08Retirement plan

8.1 General information

Field Content Guidance
Date of the decision
Effective retirement date Date on which the system ceases to produce effects.
Coded reason The one in block 6.
Deciding body
Replacement Another AI system · Non-AI solution · Manual process · None. Identifier if it is a system.
Transition to the replacement Coexistence period, cut-over criteria and capacity required.
Estimated cost of the retirement (€) (Enterprise)

8.2 Treatment of data and models

Item Treatment (Retain · Anonymise · Delete · Return · Archive) Basis (legal obligation, audit, legal defence, end of purpose) Time limit Owner Evidence (for example, deletion certificate, P57 §8)
Training data and datasets (P16)
Knowledge base
Inference and action logs
Data held by suppliers
Models and versions
System instructions and configuration
Technical documentation and lifecycle evidence Archive Audit and traceability

8.3 Technical and contractual decommissioning

Action Owner Date Status (Pending · Done · Verified)
Deactivate the system and its integrations
Revoke agent identities, credentials and permissions (P18)
Cancel licences and access to third-party models
Terminate or adapt contracts; request deletion or return from the supplier
Remove alerts and dashboards, retaining the history
Update the AI system inventory (T02)
Update regulatory registrations where appropriate (Enterprise)

8.4 Communication to those affected

Recipient Message Channel Date Owner
Internal users
Customers or affected individuals
Employee representatives, where appropriate (Enterprise)
Suppliers
Authorities, where appropriate

8.5 People and capacity

Field Content Guidance
People who operated or oversaw the system New assignment.
Capacity needed again If the released capacity had been reassigned or realised, how the process is covered.

8.6 Verification of the retirement

Field Content Guidance
Verification date
Verified by AI Office (Lite) · AI Auditor (Enterprise).
Result Executed · Executed with pending items · Not executed.
Status in the register Only with Executed does it move to Retired.

09Lessons learned

Applicable to: This use case · Portfolio · Company governance framework.

# What happened Why it happened What will be done differently Applicable to Owner for incorporating it Taken to C5? (Yes · No)
1 (illustrative example) Adoption stalled at 40% of the target The tool added a step to the process without removing any Redesign the process before building in Augment use cases Portfolio AI Office Yes

10Quality criteria

Formal G7 criteria in document 21; LV-G7 checklist in document 22.

# Check Status (Met · Not met · Not applicable · Pending)
1 The value evidence comes from P28, with statuses and validated proportion.
2 The actual ambition has been reviewed using the five questions.
3 The options have investment, additional net value and timeframe where applicable.
4 The outcome is Scale, Iterate or Retire, with a reason, and with a coded reason if it is Retire.
5 Scaling in Transform has board approval.
6 The retirement plan covers date, reason, body, replacement, data and models, and communication.
7 The retirement is verified before the use case is marked as Retired.
8 There are lessons learned with an owner.

11Approval and verification

Function Role Name Date Signature or reference
Author AI Product Owner
Retirement plan AI Operations Owner
Data review Data protection
Verifier AI Office (Lite) · AI Auditor (Enterprise)
Decision-maker Sponsor (Lite) · AI Committee (Enterprise) · Board (Scale in Transform)

Segregation of duties: the verifier and the decision-maker are not part of the team that builds or operates the system.


12Version control

Version Date Changes
0.1 16-09-2026 First version of the template.