Use case charter

Formally authorises an AI use case and sets its objective, scope, preliminary ambition, budget and owners.

Fernando García VarelaVersion 0.2 (working draft)01-10-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used In phase 0 (Context and constraints), before requesting G0. It is updated if the scope, the authorised budget or the owners change, and when scaling at G7 (new phase 0 for the extended scope).
Who completes it The AI Product Owner, with the AI Sponsor, who is accountable for its content.
Who verifies it Lite: AI Office. Enterprise: AI Auditor.
Who decides Lite: AI Sponsor. Enterprise: AI Committee.
Gate at which it is reviewed Authorisation. (G0)
Tool T01 · Use case register (the identification and classification fields feed the use case record).
Lite versus Enterprise Lite may omit the fields marked (Enterprise). The rest is mandatory in both intensities.
Related templates P02 (constraints), P03 (roles), P04 (intensity), P05 (inventory), P07 (ambition), P29 (gate decision), P31 (use case record).

Completion rules:


02Identification

Field Content Guidance
Use case code Format IA-AAAA-NNN, assigned by the use case register (T01). It is not reused.
Use case name Short, descriptive name, without internal acronyms.
Sponsoring area Business unit that has the need.
Document version 0.1, 0.2… while in draft; 1.0 when submitted to G0.
Date DD-MM-AAAA.
Author Name and role in SEVEN-G.
Phase and status Registered or In phase (03 §3.2). (phase 0)
Evidence location Link to the company's document repository.

03Business problem or opportunity

Field Content Guidance
Understandable description What it is and what it will be used for, in language for non-specialists (measurement rule 10). Three to five sentences. Reused in P31.
Business need The problem or the opportunity, not the technology. Illustrative example: the response time to customer queries about the status of their orders exceeds 24 hours in peak season.
Process or decision affected Specific business process, task or decision.
People affected Internal users, customers or other external persons, and how they are affected.
Why now Reason for the opportunity or urgency.
Consequence of not acting What happens if the use case is not authorised.

04Objective and strategic fit

Field Content Guidance
Use case objective Business outcome pursued, in one sentence. Metrics and thresholds are set in P08.
Fit with the AI thesis Reference to the AI thesis and to the ambition approved in C2 for the sphere.
Primary sphere 01 Customer · 02 Product and service · 03 People · 04 Operations · 05 Data · 06 Knowledge · 07 Decision · 08 Regulation, ethics and accountability · 09 AI governance
Secondary sphere Same list, or "none".
Preliminary ambition level Optimise · Augment · Transform. It is formally classified with P07 in phase 1.
Type of AI use AI use case · Third-party AI embedded in processes · Corporate use of general-purpose AI · Regularisation of unauthorised use (01 §1.2).
Inclusion in the portfolio (C3) Yes · No. If it does not appear in the prioritised portfolio, justify why it is proposed outside the cycle.
Related use cases (Enterprise) IA-AAAA-NNN codes with dependencies or shared outcomes. If they share value, the allocation will be declared in P08 (rule 5).

05Scope

Field Content Guidance
In scope Processes, units, channels, geographies and users included.
Out of scope Express exclusions. Anything not included is understood to be excluded.
Planned AI systems Provisional name and link to its P05 record (inventory registration).
Planned suppliers Third parties that could provide models, platforms or services. They will be assessed with P14 in phase 3.
Initial assumptions Facts taken as true which, if they fail, change the charter.

06Preliminary expected value

Field Content Guidance
Expected value type Efficiency · Return · Avoided risk · Compliance (taxonomy in 03 §3.3). There may be several.
Preliminary hypothesis One sentence. Illustrative example: a response assistant will resolve a significant share of order queries without human intervention.
Order of magnitude of value Annual range in euros, with estimated status. A potential without investment, hypothesis and timeframe is not a data point (rule 4).
Order of magnitude of investment Range in euros.
Expected time to first evidence of value Months to the pilot (phase 5).

07Authorised budget and timelines

Field Content Guidance
Budget authorised at G0 Spending cap up to the next decision point (usually G2 or G3). It is not the total budget.
Investment threshold approved in C2 If the total planned investment exceeds it, Enterprise intensity applies (P04, criterion 8).
Target dates for G1 and G2 Consistent with the reference time limits per phase approved in C2 (03 §3.6).
Planned cost categories (Enterprise) Licences · model consumption · compute and infrastructure · data · build staff · operations staff · suppliers and services · control and compliance · adoption and training.
Source of funding (Enterprise) Area budget, portfolio budget or other.

08Owners and bodies

Role Person and position Guidance
AI Sponsor Accountable for the value and the investment.
AI Product Owner Accountable for the value hypothesis and adoption.
AI Technical Owner May be designated in phase 3 if the solution is not yet known.
AI Operations Owner May be designated before phase 4.
AI Risk Owner Second line. May not be part of the team that builds.
AI Auditor (Enterprise) Independent of the team and with no reporting line to the sponsor.
Body that decides G0 Sponsor (Lite) · AI Committee (Enterprise).

Details, incompatibilities and substitutes are recorded in P03.


09Constraints, intensity and inventory

Field Content Guidance
Main constraints Summary of P02: regulatory, ethical, data, budgetary, time and technological.
Red lines What the use case will not do under any circumstances.
Determined intensity Express · Lite · Enterprise, with the criterion or eligibility that determines it (P04). If Express, section 14 is also completed.
Preliminary regulatory classification Prohibited · High risk · Transparency obligations · Minimal risk · Out of scope · Pending classification. In phase 0 it is usually "Pending classification"; it is resolved in P11.
Inventory registration Reference of the P05 record and registration date.

10Initial risks and dependencies

No. Risk or dependency Type Owner Planned treatment
1 Risk · Dependency
2
(illustrative example) The assistant's responses could contain incorrect information about delivery times. Risk Product owner To be assessed in P12; in the pilot, human review of a sample.

The formal risk assessment is carried out in phase 3 with P12. Only known risks are noted here so that the G0 decision-maker is aware of them.


11Conditions of the authorisation

Field Content Guidance
What G0 authorises Activities, budget and access permitted up to the next gate.
What it does not authorise For example, access to production data or contracting suppliers before G3.
No. Condition Time limit Owner Status
1 Open · Fulfilled · Expired
(illustrative example) Designate the technical owner before starting phase 3. 30 days Sponsor Open

An expired, unfulfilled condition turns the outcome into Iterate (01 §7.4). The decision is recorded in P29.


12Quality criteria

The verifier checks at least the following. The formal G0 criteria are in document 21 (see criteria G0.xx).

# Check Status
1 The need is formulated in business terms, not technology terms. Met · Not met · Not applicable · Pending
2 There is a description understandable to non-specialists.
3 The sphere, the preliminary ambition and the type of use follow the controlled taxonomy.
4 The fit with the AI thesis and with the portfolio is justified.
5 The scope includes express exclusions.
6 The figures have estimated status and are not presented as a commitment.
7 The authorised budget has a cap and a decision point.
8 There is a committed sponsor and the assigned roles appear in P03 without incompatibilities.
9 P02, P04 and P05 exist and are consistent with this charter.
Sphere map and ambition levels (10) The document has an author, date and version, and existed before the gate was requested.

13Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Prepares AI Product Owner
Accountable for content AI Sponsor
Verifies AI Office (Lite) · AI Auditor (Enterprise)
Decides AI Sponsor (Lite) · AI Committee (Enterprise)

Segregation of duties: the verifier has not prepared the charter; the verification date is earlier than the decision date; in Enterprise the sponsor presents, but does not decide on their own use case.


14Living record (Express intensity only)

In an Express use case (01 §9.4) this section replaces the templates of phases 0 to 5: it is filled in stages and updated at each gate, and the evidence the company already has is referenced instead of copied (21 §4.3). Each row indicates the criteria of the reduced list (21 §2.5) for which it provides evidence. At Lite and Enterprise this section is not used.

Block Minimum content Criteria Completed at
Context and opportunity Business problem, process affected, non-AI alternative and why AI adds something; screening for prohibited practices. G0.01, G0.04, G1.01, G1.03, G1.07 Entry (G0–G2)
Express eligibility The six conditions in P04 §5.1 answered "Yes" and who confirms them. G0.07 Entry (G0–G2)
Owners Sponsor, product, technical and risk owners by name; incompatibilities checked. G0.05, G0.06 Entry (G0–G2)
Register and inventory Code IA-YYYY-NNN and inventory record; no budget consumed before the decision. G0.08, G0.09 Entry (G0–G2)
Value hypothesis What changes, in which metric, by how much and when; measured baseline; value with formula; stop criterion with threshold and date. G2.01, G2.03, G2.04, G2.06, G2.08 Entry (G0–G2)
Risk and compliance Regulatory classification, legal basis if there is personal data, risks assessed with the scale in document 33 (in T06) and plan for High risks; [GEN] generative AI risks and autonomy; [TER] minimum clauses with the supplier. G3.03, G3.06–G3.09, G3.11–G3.13 and the "Yes ◆" criteria of [GEN] and [TER] G3
Minimum design and testing Human oversight, transparency, security and traceability; test results and robustness tests; [GEN] evaluation and defences. The "Yes ◆" criteria of G4 and G5 Go-live (G4–G5)
Rollback and operation Stop mechanism, rollback plan tested with its actual time, incident plan and literacy of those who use the system. G4.09, G5.11, G5.17, G5.19 Go-live (G4–G5)
Approval Date and decision of each gate with risk clearance at G3, G4 and G5 (in T01). G5.22, G5.23 Each gate

Why it matters. A small use case that had to fill in thirty templates would end up not being registered. The living record keeps in a single document everything the core requires and an audit asks to see, without asking for anything twice.


15Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 16-09-2026 First version. Structure aligned with 01 §6.2 and with the controlled taxonomy of 03 §3.3.
0.2 01-10-2026 New section 14, living record of Express use cases (01 §9.4), which replaces the templates of phases 0 to 5 with the criteria of the reduced list (21 §2.5).