Legal notice and disclaimer. SEVEN-G is a reference methodological framework provided "as is" and for information purposes only. It does not constitute legal, regulatory, financial or professional advice, nor does it guarantee compliance with any law or standard. References to general regulation (such as the EU AI Act, the GDPR, DORA or NIS2), to technical standards and to regulation specific to each sector or jurisdiction may be incomplete, may not apply to a particular case or may become out of date as a result of regulatory changes, interpretations or supervisory positions after their consultation date. Each organisation that uses SEVEN-G is solely responsible for identifying the regulation that applies to it, verifying that it is current and certifying its own regulatory compliance, with the appropriate qualified advice. This methodology is a generic, free aid shared with the community so that nobody has to start from scratch; each person or organisation can and should adapt it to its own use. It must not be inferred that its legally sensitive parts have been reviewed by legal counsel: those reviews, for each company or sector, are the ultimate responsibility of the company, consultant or organisation that uses it. Although every effort is made to keep it up to date, some regulation may have changed without being reflected here. To the fullest extent permitted by law, the author accepts no responsibility whatsoever for the effects of its application in any organisation or for its full applicability. The methodology does not grant certification of any kind. The author accepts no liability for any use made of this content or for any decisions taken on the basis of it. The data, figures, companies and cases in the examples are fictitious or illustrative.
01Purpose and scope
This document defines the methodology with which an organisation that applies SEVEN-G manages the risks of its AI systems and use cases. It is the reference for the framework's risk scales: documents 13 (risk appetite), 14 (portfolio), 21 (gate criteria), 35 (security), 36 (third parties), templates P12 and P13 and tool T06 use exactly the scales and levels set here.
1.1 What it covers
The six-step risk management process: identify, analyse, evaluate, treat, monitor and report.
Its application at the framework's two levels: the use case (phases 0–7) and the portfolio (corporate cycle C1–C5).
The likelihood and impact scales, the 5 × 5 matrix and the risk levels.
Inherent and residual risk, and the assessment of control effectiveness.
Risk acceptance, escalation and the risk register.
The catalogue of typical risksRT-<CAT>-NN, organised into ten categories.
Portfolio risk: concentration, correlation and supplier dependency.
Key risk indicators.
1.2 What it does not cover
The company's appetite and tolerances, which are approved in C2 (document 13).
The detail of security and agent controls (document 35), third-party controls (document 36) and regulatory compliance controls (document 34).
The management of incidents and nonconformities (document 37). A materialised risk is managed as an incident; the risk methodology captures its lessons.
1.3 Reference standards
The methodology is consistent with ISO/IEC 23894 (guidance on AI risk management, which adapts the ISO 31000 process), with the risk assessment and treatment requirements of ISO/IEC 42001, with the Map, Measure and Manage functions of the NIST AI RMF and its generative AI profile NIST AI 600-1, and with the risk management system that Regulation (EU) 2024/1689 requires of providers of high-risk systems. SEVEN-G does not replace the company's corporate risk framework: it specialises it for AI and must be integrated into it (same level language, same bodies, same report).
This document does not constitute legal advice.
02Principles
#
Principle
Practical consequence
1
Risk is assessed before investing
The full assessment is mandatory evidence for G3, the main stop gate.
2
An untested control does not reduce risk
Residual risk is only considered verified when the effectiveness of the control is evidenced (normally in phase 5).
3
The worst impact axis is assessed
Impact is the highest of the five axes; it is not averaged.
4
Every risk has an owner
Without a named owner, the risk is not registered.
5
Those who build do not accept their own risk
Acceptance follows the scale in section 7 and respects segregation of duties (01 §8).
6
Risk is systemic
In addition to the risk of each use case, portfolio concentration and correlation are managed (principle 5 of 01 §3).
7
The register is living
It is updated at every gate, at every continuity review, after every incident and whenever there is a relevant change.
03The process
AI risk management process
Six steps repeated at every gate and every review
flowchart LR
I["1. Identify"] --> A["2. Analyse"]
A --> E["3. Evaluate"]
E --> T["4. Treat"]
T --> S["5. Monitor"]
S --> R["6. Report"]
R -->|"Change, incident or review"| I
E -->|"Critical without approval"| P["G3 or G5 blocked"]
classDef ok fill:#d9ebe0,stroke:#0d7680,color:#1a1817
classDef med fill:#f2dfce,stroke:#0f5499,color:#1a1817
classDef ko fill:#f3d3da,stroke:#990f3d,color:#1a1817
class I,A,E med
class T,S,R ok
class P ko
Source: SEVEN-G
Step
What is done
Output
Owner
1. Identify
Go through the catalogue of typical risks (section 9), the phase 0 context, the regulatory classification, the architecture and the suppliers. Describe each risk as cause → event → consequence.
List of risks with the associated RT code.
AI Product Owner with the AI Technical Owner; facilitated by the AI Risk Owner.
2. Analyse
Estimate inherent likelihood and impact using the scales in section 4, justifying the determining impact axis. Identify existing controls.
Inherent level per risk.
Use case team.
3. Evaluate
Compare with the appetite and tolerances (document 13). Decide which risks require treatment and in what order.
Prioritisation and proposed response.
AI Risk Owner.
4. Treat
Choose the response (avoid, mitigate, transfer, accept), design and apply controls, estimate the target residual and obtain acceptance of the residual.
Mitigation and contingency plan (P13); acceptance decision.
Risk owner; acceptance by whoever is competent under section 7.
5. Monitor
Verify the effectiveness of controls, monitor key risk indicators, review at the frequency set for the level and when triggers occur.
Updated register; verified residual.
AI Operations Owner and risk owner; verified by the AI Auditor at the gates.
6. Report
Present the risk profile to the body that decides the gate and, in aggregate, to the AI Committee and the board.
Risk profile of the inventoried systems, including those that predate the framework and corporate use of AI.
Direction(C2)
Approval of the appetite, tolerances, economic materiality threshold and indicator thresholds (document 13).
Portfolio(C3)
Concentration, correlation and supplier dependency when prioritising (section 10).
Oversight(C4)
Monthly report to the AI Committee and quarterly report to the board or board committee (section 12).
Review(C5)
Effectiveness of the risk management system, materialised risks, lessons and recalibration of scales.
04Assessment scales
4.1 Likelihood
Likelihood is estimated for the use case's horizon or, for systems in production, for the following twelve months. The frequency reference is used for recurring events and the percentage reference for one-off events.
Likelihood
Name
Indicative reference
1
Rare
Less than once in 5 years or < 5 % over the use case's horizon
2
Unlikely
Once every 2–5 years or 5–20 %
3
Possible
Once every 1–2 years or 20–50 %
4
Likely
Several times a year or 50–80 %
5
Almost certain
Monthly or more often, or > 80 %
Supporting criteria: precedents in the company or the sector, results of tests and pilots, exposure (users, volume, external access), existence of a motivated attacker, maturity of the technology. For security threats with an active attacker (RT-GEN, RT-SEG) and external exposure, likelihood should not be rated below 3 without evidence from adversarial testing.
4.2 Impact across five axes
Impact is assessed on five axes and the highest is taken. The determining axis and its justification are recorded.
M is the economic materiality threshold that the company approves in C2 (document 13) in proportion to its size. The percentages of M are indicative and are calibrated in C2.
Impact
Economic
People and rights
Regulatory
Operational
Reputational
1 · Negligible
Less than 1 % of M.
No appreciable effect on people.
No non-compliance.
Brief interruption with no effect on customers or relevant processes.
No external repercussions.
2 · Minor
From 1 % to 5 % of M.
Inconvenience to a few people, immediately correctable.
Formal non-compliance that can be remedied without notifying the authorities.
Degradation lasting hours in a non-critical process.
Isolated complaints.
3 · Moderate
From 5 % to 20 % of M.
Reversible adverse effect on a limited group (wrongful treatment, delay, incorrect information).
Non-compliance that requires formal correction and may require notification to the supervisor.
Interruption of a relevant process for one working day or sustained degradation.
Local or sector-level coverage; recurring complaints.
4 · Major
From 20 % to 100 % of M.
Significant harm: wrong decisions on rights or access to services, exposure of personal data with risk to individuals.
Mandatory notification, formal request or likely sanctioning proceedings.
Interruption of a critical function within its tolerance, or of a relevant process for several days.
National coverage; measurable loss of customers or partners.
5 · Critical
More than M.
Serious or irreversible harm to health, systematic discrimination or infringement of fundamental rights.
Prohibited practice, possible serious incident under the AI Act, serious sanction or loss of authorisation.
Interruption of a critical function beyond its impact tolerance.
Lasting damage to trust; attention from the supervisor and the board.
4.3 Risk level and 5 × 5 matrix
Level = Likelihood × Impact, with four levels: Low 1–4 · Medium 5–9 · High 10–15 · Critical 16–25.
Likelihood \ Impact
1 · Negligible
2 · Minor
3 · Moderate
4 · Major
5 · Critical
5 · Almost certain
5 · Medium
10 · High
15 · High
20 · Critical
25 · Critical
4 · Likely
4 · Low
8 · Medium
12 · High
16 · Critical
20 · Critical
3 · Possible
3 · Low
6 · Medium
9 · Medium
12 · High
15 · High
2 · Unlikely
2 · Low
4 · Low
6 · Medium
8 · Medium
10 · High
1 · Rare
1 · Low
2 · Low
3 · Low
4 · Low
5 · Medium
Rules of use:
Whole numbers are used. When in doubt between two values, the higher one is taken and the doubt is recorded.
Extreme impact rule: a risk with impact 5 on the people and rights axis or on the regulatory axis is treated, for acceptance purposes, as at least High, even if its likelihood is 1. This prevents rare but unacceptable events from being accepted by the AI Product Owner.
Practices prohibited by the AI Act are not assessed: they are avoided (01 §6.5).
05Inherent risk, controls and residual risk
5.1 Definitions
Concept
Definition
Inherent risk
Level of the risk without considering controls specific to the use case. General corporate controls are only considered if they are tested and documented in the company.
Target residual risk
Level expected after applying the planned controls. It is used at G3 and G4.
Verified residual risk
Level after checking the effectiveness of the controls with evidence. It is the level required at G5 and monitored at R6.
5.2 Control types
Type
Acts on
Examples
Preventive
Likelihood
Least privilege for agents, data validation, contractual no-training clause.
Detective
Impact, by shortening the time to detection
Drift monitoring, alerts on anomalous actions, sample review.
Insurance, contractual indemnity. It does not transfer regulatory accountability or harm to people.
5.3 Control effectiveness
Effectiveness
Criterion
Maximum reduction allowed
Effective
Designed, implemented and tested with evidence in the last review period, with no relevant exceptions.
Up to 2 levels of likelihood (preventive) or of impact (detective or corrective).
Partially effective
Implemented and tested with exceptions, incomplete coverage or unsupervised manual dependency.
1 level.
Ineffective
The test fails or the control does not operate as designed.
None. A corrective action is opened.
Untested
Designed or implemented without an effectiveness test.
None in the verified residual. It may be used in the target residual.
Rules:
The total reduction cannot take likelihood below 1 or impact below the impact the event would produce with the corrective control already activated.
Transfer controls only reduce the economic axis; impact continues to be determined by the highest of the other axes.
In generative AI and agents, the effectiveness of controls against prompt injection must be tested through adversarial testing (document 35, section 8); a policy or an instruction to the model is not, on its own, an effective control.
An ineffective control on a High or Critical residual risk is also a nonconformity (document 37).
06Risk responses
Response
When
Conditions
Avoid
Unacceptable risk with no alternative: prohibited practice, Critical with no viable treatment, cost of the control higher than the value.
Change the scope, design, data, supplier or autonomy level; or Stop at the gate.
Mitigate
Usual response for Medium, High and Critical.
Controls with an owner, deadline and target residual. Plan in P13.
Transfer
Significant economic impact with a transfer market.
Document what is transferred and what is not; review insurance exclusions and indemnity limits.
Accept
Residual within appetite or disproportionate mitigation cost.
Decision by the competent level (section 7), with a validity period and review conditions.
Every High or Critical risk under treatment must have a contingency plan: what is done if it materialises, who activates it and with what trigger. In systems with the ability to act, the plan includes activating the kill switch or the rollback.
07Acceptance and escalation
7.1 Who accepts residual risk
Residual level
Accepted by
Conditions
Low
AI Product Owner
With a record.
Medium
AI Sponsor
With clearance from the AI Risk Owner.
High
AI Committee
With a treatment plan, indicators and a maximum acceptance validity until the next continuity review.
Critical
Not accepted. Exceptionally, only the board or its board committee, within the appetite approved in C2.
Rationale, time limit, compensating controls and monitoring at every quarterly meeting. A Critical residual without that approval blocks G3 and G5.
Rules:
No one accepts a risk of a use case they are building (01 §8.2).
Acceptance expires when the level, the system, the supplier, the model, the regulatory classification or the autonomy level changes, and in any case on the recorded validity date.
Accepting a risk does not exempt compliance with regulation: a legal breach is not accepted as a risk; it is corrected.
7.2 Escalation triggers and extraordinary review
Trigger
Action
Indicative time limit
New Critical residual risk
Notification to the AI Committee; assessment of stopping or suspension.
Same working day
New High residual risk or a one-level increase
Notification to the AI Sponsor and the AI Risk Owner; review at the next committee meeting.
5 working days
Key risk indicator outside threshold
Review of the associated risk and its controls.
5 working days
Materialised risk
Management as an incident (document 37) and reassessment.
According to severity
Ineffective control on a High or Critical risk
Nonconformity and reassessment of the residual.
According to nonconformity type
Change of model, supplier, data, autonomy or regulation
Reassessment of the affected risks before the change.
Before deployment
Overdue treatment action
Alert to the owner; if High or Critical, to the committee.
On expiry
7.3 Review frequency
Residual level
In development (phases 0–5)
In production (phase 6)
Critical (exceptionally accepted)
Continuous, with a report at every committee meeting
Monthly and at every quarterly board meeting
High
At every gate and at least monthly
Quarterly, coinciding with Enterprise R6
Medium
At every gate
Half-yearly or at every R6
Low
At G3 and G5
Annually or at R6
08Risk register
The risk register is the "Risk matrix and register" evidence of 01 §6.10. It is implemented with template P12 and tool T06, on the Risk entity of the common data model (03 §4).
8.1 Fields
Block
Field
Content
Identification
Identifier
Use case code and sequential number (illustrative: IA-2026-014 · R03); for portfolio risks, scope "Portfolio".
Typical risk
Catalogue code RT-<CAT>-NN, or "Specific" if there is no equivalent.
Category
EST, TEC, DAT, ECO, LEG, ORG, REP, GEN, SEG or TER.
Title and description
Cause → event → consequence, in plain language.
Affected systems and suppliers
Link to the inventory (T02) and the supplier register (T09).
Date and phase of identification
Date, phase and who identified it.
Owners
Risk owner
Named person with the ability to act.
AI Risk Owner
Second line that issues clearance.
Inherent analysis
Likelihood (1–5) and justification
Reference used and sources.
Impact per axis (1–5)
Economic, people and rights, regulatory, operational, reputational; determining axis.
Inherent level
Calculated.
Controls
Controls
Description, type, code (SEG, AG or other), owner.
Effectiveness
Effective, partially effective, ineffective or untested; date and evidence of the test.
Assessment changes with date, author and reason (03 §2, principle 2).
8.2 Register quality
The verifier checks, as a minimum: that all Medium or higher risks have an owner, a control and a residual; that the justification of likelihood and impact is traceable; that acceptances are signed by the competent person and are current; that the typical risks applicable to the use case's technology and classification have been considered (included or discarded with a reason); and that the register existed before the gate (01 §7.4, rule 3). The specific criteria are in documents 21 and 22.
09Catalogue of typical risks
The catalogue is a starting list, not an exhaustive one. In phase 3, the team must review at least the typical risks in the categories that apply to its technology and exposure, and record those discarded with a reason. Each company may extend the catalogue with sequential codes and must declare those it adds. To carry out that review, the Excel of the use case generated by T06 lists the typical risks that apply to the profile of the use case (technology, exposure, autonomy, regulatory classification, ambition and third parties) and have no registered risk with their code, with a proposed mitigation and contingency for each one and columns to include or discard it with a reason.
The Phase column indicates where the risk is identified and where it is mainly treated; controls with a SEG or AG code are described in document 35.
9.1 Strategic (EST)
Code
Risk and description
Typical causes
Typical controls
Phase
RT-EST-01
Misalignment with the AI thesis. The use case does not contribute to the ambition or the spheres approved in C2.
Technology-driven origin; weak sponsorship; no screening.
Fit with the thesis at G0; sphere classification (P07); prioritisation in C3.
0–1
RT-EST-02
Declared but unevidenced ambition. What is Optimise is presented as Augment or Transform, and decisions are made with wrong expectations.
Incentives to "transform"; ambiguous criteria.
Five classification questions (T05); confirmation in phase 2; review at G7.
1, 2, 7
RT-EST-03
Missed opportunity. The decision process is so slow that the advantage is lost.
Long gate time limits; the same return criterion for all bets.
Reference time limits (03 §3.6); criteria by ambition (01 §7.6); agility metrics.
C3, all
RT-EST-04
Technology lock-in. The chosen platform or model is superseded and changing is costly.
Dependence on proprietary features; tightly coupled architecture.
Model abstraction layer; portability of data and prompts; review at R6.
4, 6
RT-EST-05
Withdrawal of sponsorship or funding. The use case loses support before demonstrating value.
Changes in leadership; value not visible in time.
Stage-gated funding; learning milestones; stop criteria set in advance.
0, C3
RT-EST-06
Portfolio concentration in a single bet. A single use case or platform concentrates investment or expected value.
Large bets without limits per stage.
Concentration limits in the appetite (13); quarterly review.
C3, C4
9.2 Technical (TEC)
Code
Risk and description
Typical causes
Typical controls
Phase
RT-TEC-01
Insufficient performance in real-world conditions. The system does not reach the threshold outside the test environment.
Validation with non-representative data; pilot without an attribution method.
Success threshold set in advance; pilot in real-world conditions (P22).
3, 5
RT-TEC-02
Degradation and drift. Performance falls because of changes in the data, the environment or user behaviour.
Dynamic environment; no monitoring.
Drift and performance monitoring (P25); retraining or retirement thresholds.
6
RT-TEC-03
Lack of robustness. Erroneous outputs in response to atypical inputs, noise or edge cases.
Testing limited to common cases.
Robustness and edge-case testing; referral to a person when out of domain.
4, 5
RT-TEC-04
Confabulation. Generative AI produces false content presented as true.
Lack of authoritative sources; out-of-scope tasks.
Retrieval over authoritative sources; citations; periodic evaluations; user notice.
4–6
RT-TEC-05
Outputs that are neither explainable nor traceable. It is not possible to reconstruct why an output was produced.
Insufficient logs; opaque models without documentation.
Logging of inputs, versions and outputs; model documentation; explanations proportionate to the use.
4
RT-TEC-06
Insufficient integration and capacity. Latency, availability or volume cannot support the process.
Testing without real load; external dependencies.
Load testing; service level agreements; graceful degradation.
4, 5
RT-TEC-07
Unmanaged change. Changes to the model, prompts, parameters or configuration without prior evaluation.
Frequent changes; no version management.
Change management with regression evaluations; prompt versioning.
5, 6
RT-TEC-08
Irreversibility. It is not possible to return to the previous state or to the process without AI.
Rollback plan non-existent or untested; manual process dismantled.
Rollback plan tested before G5 (P19); fallback process maintained.
4, 5
9.3 Data (DAT)
Code
Risk and description
Typical causes
Typical controls
Phase
RT-DAT-01
Insufficient quality. Incomplete, erroneous or outdated data.
No control at source; legacy systems.
Quality profiling in phase 3; validation rules; data owner.
3, 4
RT-DAT-02
Non-representative data and bias. The data do not reflect the population or reproduce historical discrimination.
Biased samples; proxy variables for protected characteristics.
Representativeness analysis; fairness metrics; testing by group.
3, 5
RT-DAT-03
Lack of legal basis or incompatible purpose. Use of personal data without a legal basis or for a different purpose.
Reuse of operational data without analysis.
Legal analysis; data protection impact assessment; minimisation.
3
RT-DAT-04
Unknown lineage. It is not known where the data come from, what transformations they have undergone or under what licence.
Consumption budgets and limits; cost per transaction monitored (T13); SEG-10.
3, 6
RT-ECO-03
Unrealised value. Released capacity is not converted into savings or reallocated.
No realisation plan; organisational resistance.
Measurement rule 3 (00 §6); realisation plan at G5; monitoring (P28).
5–7
RT-ECO-04
Inflated value or double counting. The same euro is attributed to several use cases or declared without a formula.
Pressure for results; no independent validation.
Measurement rules 1, 2 and 5; validation by management control.
2, 6, 7
RT-ECO-05
Unforeseen exit cost. Replacing the supplier or retiring the system costs more than estimated.
Contracts without exit clauses; data in closed formats.
Exit plan (document 36); exit cost in the economic assessment.
3, 7
RT-ECO-06
Rise in demand and concessions from customer agents. Agents always ask for what hardly anyone used to claim, and the company pays more concessions or handles more contacts than forecast.
No posture set by journey; eligibility and concession rules that depend on customer effort; agent traffic neither detected nor tagged.
Posture by journey in C2 (13 §5.6); SEG-28; eligibility and concession rules applied outside the model; exposure as a separate scenario (40 §5.4); reading of the indicators in 35 §10.
C2, 6
9.5 Legal and compliance (LEG)
Code
Risk and description
Typical causes
Typical controls
Phase
RT-LEG-01
Incorrect regulatory classification. A high-risk system is treated as minimal-risk or out of scope.
Classification without legal judgement; change of purpose.
Classification with T07 and legal review; review at R6 and upon changes (34).
0, 3, 6
RT-LEG-02
Prohibited practice. The use falls within a practice prohibited by the AI Act.
Lack of awareness; evolution of the use.
Screening at G0 and G3; always avoid (01 §6.5).
0, 3
RT-LEG-03
Transparency breach. People do not know they are interacting with an AI or that content is synthetic.
Design without transparency requirements.
Requirements of Article 50 of the AI Act in the design; interface review.
4, 5
RT-LEG-04
Automated decisions without safeguards. Decisions with significant effects without effective human intervention or the right to contest.
Nominal oversight; progressive automation not reviewed.
Human oversight design (P17); analysis of Article 22 of the GDPR.
3, 4
RT-LEG-05
Omitted impact assessments. The data protection impact assessment or the fundamental rights impact assessment is not carried out or not updated.
Failure to inform and consult. Workers' representatives or affected workers do not receive, before use, the required information or consultation on a system that affects working conditions or employment.
Late or missing legal analysis; changes in parameters, rules or purpose not communicated.
Information and consultation process (50 §7.2) and information sheet (50 §7.3); no Proceed or Proceed with conditions at G5 without evidence that information has been provided; IND-ADO-12 (41).
3–5, 6
RT-ORG-08
Labour dispute. The introduction of AI gives rise to collective consultations, complaints or disputes that delay, condition or block the use case.
Late or ambiguous communication; effect on employment without dialogue; destinations of released capacity decided without participation.
Position on AI and work approved in C2 (13); effect assessment (50 §3.4); dialogue with workers' representatives and internal communication (50 §7 and §10); senior management decision on relevant PER-D1 destinations.
2–5, 7
RT-ORG-09
Deterioration of wellbeing. Work intensification, excessive monitoring, loss of autonomy or oversight workload harm the health and engagement of the people affected.
Objectives and workloads not reviewed after AI; usage data used to monitor people; excessive review volumes.
Review of the occupational risk assessment, including psychosocial risks, and purpose limitation (50 §9.2); oversight design (P17); pulse survey (IND-ADO-15, 41).
4–6
9.7 Reputational (REP)
Code
Risk and description
Typical causes
Typical controls
Phase
RT-REP-01
Discriminatory outcomes. The system treats groups of people less favourably.
Bias in data or design; no testing by group.
Bias testing before G5; monitoring by group; human oversight.
3, 5, 6
RT-REP-02
Errors visible to customers. Wrong responses or decisions with public repercussions.
Direct exposure without safeguards.
Prior evaluations; referral to a person; rapid incident response.
5, 6
RT-REP-03
Use perceived as inappropriate or intrusive. Use that is legal but contrary to the expectations of customers, employees or society.
No ethical analysis; insufficient communication.
Ethical review in phase 3; transparency; complaints channel.
3
RT-REP-04
Harmful or offensive content. Generative AI produces content that is offensive, dangerous or unbecoming of the brand.
Insufficient filters; user manipulation.
Input and output filters (SEG-03); adversarial testing; sample oversight.
4–6
RT-REP-05
Misleading communication about AI. Capabilities or results that AI does not have are attributed to it.
Commercial pressure; unvalidated value.
Review of communications; use of validated value (00 §6).
5, 7
9.8 Generative AI and agents (GEN)
Code
Risk and description
Typical causes
Typical controls
Phase
RT-GEN-01
Direct prompt injection and jailbreak. A user manipulates the system to bypass its restrictions.
Restrictions based solely on instructions to the model.
SEG-02, SEG-03, SEG-11; limits enforced outside the model.
4, 5
RT-GEN-02
Indirect injection. Malicious instructions in emails, documents, websites or tool responses alter the task.
The system treats untrusted content as instructions.
SEG-02; AG-12; AG-05; specific testing (AG-18).
4, 5
RT-GEN-03
Excessive agency. The system has more tools, permissions or autonomy than necessary.
AG-02; autonomy level decided in phase 4 (35 §5); AG-20.
4, 6
RT-GEN-04
Unauthorised or untraceable action. An agent executes an action that does not correspond to an authorised intent, or it is not possible to reconstruct why.
No intent-based access control; incomplete logs.
AG-04, AG-05, AG-06, AG-10.
4–6
RT-GEN-05
Information leakage. Personal or confidential data or system prompts leak through responses, retrieval or tools.
Retrieval without user permissions; secrets in prompts.
SEG-05, SEG-06, SEG-07.
4, 6
RT-GEN-06
Improper output handling. The model's output is executed or inserted into other systems without validation.
Trust in the output; direct integrations.
SEG-04; AG-11.
4, 5
RT-GEN-07
Memory or context poisoning. Manipulated content persists in memory or in the knowledge base and alters future decisions.
Shared memory without control; ingestion without validation.
AG-14; SEG-08; RT-DAT-06.
4, 6
RT-GEN-08
Cascading failures and unbounded consumption. Loops, retries or chains of agents amplify errors or costs.
No iteration limits or circuit breakers.
AG-07, AG-16; SEG-10.
4, 6
RT-GEN-09
Human trust exploitation. The system induces a person to approve an inappropriate action.
Approvals without context; overreliance.
AG-08 with sufficient information; RT-ORG-04.
4, 6
9.9 Security and offensive AI (SEG)
Code
Risk and description
Typical causes
Typical controls
Phase
RT-SEG-01
Impersonation with synthetic voice or video. CEO fraud or false orders with a legitimate appearance.
Payment processes based on voice or image recognition.
SEG-16, SEG-17, SEG-18.
C4, 6
RT-SEG-02
AI-generated phishing and social engineering. Personalised, convincing messages at scale.
Weak authentication; public exposure of employee information.
SEG-15, SEG-17.
C4
RT-SEG-03
Accelerated exploitation of vulnerabilities. The time between the disclosure of a vulnerability and its exploitation shrinks.
Slow patching; unknown exposed attack surface.
SEG-13, SEG-19.
6, C4
RT-SEG-04
Compromise of non-human identities. Theft or abuse of agent credentials, service keys or tokens.
Long-lived credentials; excessive permissions.
AG-01, AG-02, AG-03, AG-20.
4, 6
RT-SEG-05
Data or model poisoning. Manipulation of training, fine-tuning or evaluation data.
Model extraction and service abuse. Mass queries to replicate the model, infer data or exhaust resources.
Exposed interfaces without limits.
SEG-10, SEG-12.
4, 6
RT-SEG-07
AI supply chain compromise. Malicious or vulnerable models, libraries, connectors or tool servers.
Components downloaded without verification.
SEG-09; AG-13; supplier assessment (36).
4, 6
RT-SEG-08
Errors of AI cyber defence. False negatives that let an attack through or automated containments that interrupt operations without a real attack; the defensive system itself attacked or manipulated.
Automated response without limits or validation; detection not measured against a baseline; dependency on a single supplier.
SEG-21, SEG-22, SEG-23, SEG-24, SEG-25 (35 §9.3).
4, 6
RT-SEG-09
Customer impersonation with AI. Synthetic voice or video that passes customer identification in automated channels, or documents and images manipulated with AI that support claims, onboarding or data changes.
Identification based only on voice, image or a document; detection used as the sole barrier; no second factor independent of the channel.
Synthetic-voice detection and liveness checks as support; second factor independent of the channel; review of documents and images; SEG-18; scenarios in the test bench (SEG-27) (35 §9.1).
3, 4, 6
9.10 Third parties (TER)
Code
Risk and description
Typical causes
Typical controls
Phase
RT-TER-01
Supplier dependency and lock-in. Changing supplier is unfeasible within a reasonable time or cost.
Closed formats; proprietary features.
Exit strategy; portability (36 §7).
3, 4
RT-TER-02
Use of data by the supplier. The supplier uses data, prompts or outputs for training or other purposes.
Unilateral change of model or terms. The supplier changes the version, behaviour or price, or withdraws the model.
Managed services without contractual advance notice.
Advance notice and pinned versions; regression evaluations (RT-TEC-07).
3, 6
RT-TER-04
Uncontrolled sub-processors and location. Data processed by third parties or in unauthorised locations.
Opaque subcontracting chain.
List of sub-processors; authorisation of changes; contractual location.
3
RT-TER-05
Supplier failure or discontinuity. Prolonged unavailability, insolvency or market exit.
Small or critical supplier with no alternative.
Continuity and exit plan; financial due diligence; level N3 (36 §4).
3, 6
RT-TER-06
Unidentified embedded AI. Software already contracted incorporates AI features without assessment.
Supplier updates; activation by default.
Embedded AI questionnaire; review of updates (36 §8).
C1, 6
RT-TER-07
Concentration in common suppliers. Many systems depend on the same model or cloud provider.
Standardisation without concentration analysis.
Concentration analysis (section 10); limits in the appetite.
C3
10Portfolio risk
The risks of use cases do not simply add up: they interact. The AI Committee must review the portfolio, at least quarterly, with three analyses.
10.1 Concentration
Factor
What is measured
Indicative warning signal
Model provider
Systems in production and expected value that depend on the same provider or model family.
More than half of validated value depends on a single provider without a tested exit plan.
Platform and cloud
Systems on the same execution or agent platform.
Critical function with no execution alternative.
Critical function
Critical or important functions supported by AI.
More than one critical function without an operational fallback process.
Data
Systems that depend on the same data source or knowledge base.
Source with no owner or with unmeasured quality.
People
Systems that depend on the same key people.
One person is the AI Technical Owner of several Enterprise systems.
Sphere and ambition
Distribution of High residual risk by sphere and ambition level.
Risk concentrated in customer or decision spheres without enhanced oversight.
The thresholds are set in the risk appetite (document 13); those in this table are indicative.
10.2 Correlation
Two risks are correlated when the same cause materialises both at once. Typical common causes: the same foundation model (a version change or a vulnerability affects all the systems that use it), the same attack technique (an indirect injection that works on one agent usually works on others with the same design), the same regulatory change or the same legal interpretation, and the same supplier or sub-processor.
For each common cause, the AI Office should build a portfolio scenario and assess it with the matrix in section 4, adding up the economic impacts of the affected systems and taking the worst impact on the other axes. Minimum recommended scenarios:
Unavailability of the main model provider for several days.
Change in the behaviour of a foundation model used by several systems.
Exploited vulnerability in a common agent component (connector, tool server, library).
Regulatory reclassification of a type of use present in several use cases.
Data breach in a shared knowledge base.
10.3 Supplier dependency
Dependency is assessed using the N1–N3 requirement level of document 36 and two questions: how much time and cost it takes to replace the supplier, and which functions stop in the meantime. Portfolio risks are recorded in T06 with scope "Portfolio", an owner in the AI Office and acceptance by the AI Committee or, if they are Critical, by the board.
11Risk appetite and key risk indicators
11.1 Relationship with the appetite
The risk appetite is approved in C2 and developed in document 13. This methodology requires it to include, as a minimum:
A statement per risk category (for example, zero tolerance for prohibited practices and for untreated discrimination).
The economic materiality threshold M of section 4.2.
Portfolio limits: maximum number of accepted High residual risks, no Critical risk without board approval, concentration limits.
Key risk indicator thresholds.
11.2 Key risk indicators
The thresholds are indicative and are approved in C2. All are calculated with data from T01, T06, T08 and T09.
Indicator
Definition
Indicative threshold
Critical residuals
Current Critical residual risks, with and without board approval.
0 without approval
High residuals
Number and evolution of accepted High residual risks.
No increase for two consecutive quarters
Expired acceptances
Acceptances whose validity has expired without review.
0
Untested controls
Percentage of controls on High or Critical risks without a current effectiveness test.
Less than 10 %
Overdue actions
Treatment actions for High or Critical risks that are past their deadline.
0 overdue by more than 30 days
Materialised risks
Incidents linked to registered risks versus incidents with no previously identified risk.
Downward trend in unidentified ones
Drift
Systems with drift or performance metrics outside threshold.
0 without an open action
Injection success
Percentage of adversarial injection tests that succeeded in the last campaign.
Downward trend; 0 on sensitive actions
Agents with excessive permissions
Agent identities with unjustified permissions in the last review.
0
Supplier concentration
Proportion of validated value dependent on the main model provider.
According to the C2 limit
Overdue classification
Systems whose regulatory classification has not been reviewed within the time limit.
0
Unauthorised use
Shadow AI cases detected and not regularised.
Downward trend
12Risk reporting
Recipient
Frequency
Minimum content
Body that decides the gate
At every gate
Inherent and residual profile, High and Critical risks with controls and effectiveness, required acceptances, changes since the previous gate.
AI Committee
Monthly
Residual heat map of the portfolio, new and escalated risks, pending and expired acceptances, indicators outside threshold, materialised risks.
Board or board committee
Quarterly
Critical and High residuals by sphere, concentration and portfolio scenarios, compliance with the appetite, significant incidents, exposure to offensive AI (35), decisions requested. Presented with the quarterly second-line report (P42).
Annual review(C5)
Annual
Effectiveness of the risk management system, recalibration of scales and catalogue, lessons learned.
The report to the board uses business language: what can happen, whom it affects, what is being done and what decision is requested. It should not present unprioritised technical lists of risks.
Calculation of levels with the extreme impact rule, inherent and residual 5 × 5 matrix for each use case and for the portfolio, control effectiveness, acceptance by the body for its level, observations from sections 4 to 8 (Critical residual without approval, High without contingency, acceptance expired or insufficient, review overdue), CSV export and Excel of the use case: matrix, register, mitigation plan (P13 §4) and contingency plan (P13 §6) proposed for each risk from the catalogue in section 9 according to its typical risk, and the typical risks that apply to the profile of the use case and are not registered, to include or discard with a reason (section 8.2); the proposals are a starting point and do not replace the decision of the competent body. "Risks" view of the T01 register. Portfolio concentration and correlation (section 10) are analysed with P12 §7.
Use case register, inventory, incidents, suppliers and board dashboard(T01 · T02 · T08 · T09 · T17)
First version. Sets the common scales of likelihood and impact across five axes, the 5 × 5 matrix, target and verified residual risk, control effectiveness, tiered acceptance, the register fields, the catalogue of 70 typical risks in ten categories, the portfolio risk analysis and the key risk indicators. Organisational risks RT-ORG-07 (information and consultation), RT-ORG-08 (labour dispute) and RT-ORG-09 (wellbeing), proposed in document 50, added to the catalogue.
0.2
25-09-2026
Adds typical risk RT-SEG-08 (errors of AI cyber defence), bringing the catalogue to 71 typical risks.
0.3
19-10-2026
Adds typical risk RT-SEG-09 (customer impersonation with AI), bringing the catalogue to 72 typical risks (D159).
0.4
16-11-2026
Adds typical risks RT-ECO-06 (rise in demand and concessions from customer agents) and RT-LEG-09 (dispute over an action taken by the customer's agent), bringing the catalogue to 74 typical risks (D185).
External sources cited
Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.