SEVEN-G
Template P42 · 19-09-2026

Template P42 · Quarterly second-line report

Quarterly second-line report

Reports each quarter to the board committee, or the committee that replaces it, on portfolio risks, incidents, nonconformities, exceptions, the inventory reconciliation and regulatory changes, with the decisions it is asked to take.

Fernando García VarelaVersion 0.1 (working draft)19-09-2026Draft for review

Why it matters. The board committee oversees the effectiveness of control over AI, but it can only do so with an overall view that no single use case provides: risks concentrating on one supplier or model, recurring incidents, overdue nonconformities, exceptions that never end, systems appearing outside the inventory or regulations that change. This report is the second line's contribution to C4 (30 §6.3) and turns that view into specific decisions for the committee.

01Instructions for use

Aspect Guidance
When it is used Once a quarter, before the board committee meeting (C4), with the same cut-off date as the board pack (60 §7.2). A partial report is brought forward if there is an S1 incident or a critical nonconformity.
Who completes it The second-line coordinator for AI (accountable and responsible, 30 §6.3), with the AI Risk Owners, security, data protection and compliance; the AI Office provides the data from T01, T02, T06, T08, T09 and T21.
Who verifies it The third line is consulted (30 §6.3); the AI Committee sees it before it is sent and may add its position, without changing the content.
Who decides or approves The board committee oversees and decides on the proposals in section 11.
Corporate cycle stage Oversight (quarterly). The fourth quarter feeds C5. (C4)
Tool T06 (risks), T08 (incidents and nonconformities), T02 (inventory), T09 (suppliers), T21 (corporate use), T01 (exceptions and conditions) and T18 (decisions).
Reference document 30 §3.2 and §6.3; 32 §9; 33 §10–12; 34 §10.3; 37 §9; 60 §4.5–4.6.

Completion rules:


02Identification

Field Content Guidance
Period AAAA-Qn.
Data cut-off date
Addressee [Audit / Risk / Technology Committee] or the board if there is no committee.
Meeting at which it is presented Minutes reference (P39).
Prepared by Second-line coordinator for AI.
Version

03Key message and decisions requested

Field Content Guidance
Key message Three lines using the response format: "Yes" · "Yes, with one condition: …" · "Not yet, because … is missing" · "No, because …". Answers "is AI within the risk appetite?".
Changes since the previous quarter
Decisions requested List with DEC code and one line; if there are none, this is stated expressly.
(illustrative example) Key message Yes, with one condition: that the exit plan for the main model supplier, on which 62% of validated value depends, is approved.

04Portfolio risks

4.1 Critical and High residual risks

Risk (use case · Rnn) Typical risk Inherent level Residual level Owner Controls and effectiveness Accepted by and validity Next review
IA-AAAA-NNN · R01 RT-XXX-NN High · Critical

4.2 Concentration

Factors from 33 §10.1 and 14 §9; thresholds approved in C2.

Factor Situation in the quarter C2 threshold Alert? (Yes · No) Proposed measure
Model supplier
Platform and cloud
Critical function
Data
People
Sphere and ambition

4.3 Correlation: portfolio scenarios

Assessed with the matrix in 33 §4: sum of the economic impacts of the affected systems and worst impact on the other axes (33 §10.2).

Scenario Systems affected Aggregate economic impact Worst non-economic impact Level Change from previous quarter
Unavailability of the main model supplier
Change in behaviour of a common base model
Vulnerability in a common agent component
Regulatory reclassification of a type of use
Breach in a shared knowledge base

4.4 Key risk indicators

Thresholds approved in C2 (33 §11.2).

Indicator Threshold Value Previous quarter Status (Within · Outside)
Critical residual risks without board approval 0
High residual risks accepted No growth for two consecutive quarters
Lapsed acceptances 0
Untested controls (High or Critical) < 10%
Overdue treatment actions 0 over 30 days
Materialised risks with no prior risk Downward trend
Drift outside threshold with no action 0
Injection success in the last campaign Downward trend; 0 on sensitive actions
Agents with excessive permissions 0
Supplier concentration According to C2 limit
Regulatory classification overdue 0
Unregularised unauthorised use Downward trend
Field Content
Compliance with the risk appetite Within · Outside, with the limits exceeded.
Exposure to offensive AI (document 35) Main indicators and events in the quarter.

05Incidents

Quarterly content of 37 §9 and 60 §4.6.

Code System and use case Severity Type Date Status Notifications (regime, deadline met) Lessons and actions
INC-AAAA-NNN S1 · S2
S3 and S4 aggregate Number Main type Median containment time
Field Content
Regulatory notifications in the quarter and compliance with deadlines
Supplier incidents
Systemic lessons

06Nonconformities

Code Requirement not met Type Scope Status Deadline Overdue? Corrective action
NC-AAAA-NNN Critical · Major Yes · No

Critical: always individually. Major: individually if open beyond the deadline; aggregated otherwise. Minor: number only.

Summary Critical Major Minor
Open
Overdue
Closed in the quarter

07Exceptions in force

Summary of the P40 register (30 §7.4).

Code Type Requirement affected Risk level with measures Approved by Expiry Status
EXC-AAAA-NNN In force · Expired

08Quarterly inventory reconciliation

Result of the reconciliation in 32 §9, carried out by the AI Office.

Source checked Differences found Treatment Nonconformities opened
Application and enterprise architecture register
Contracts, purchases and renewals
AI supplier register (T09) and ICT third-party register (DORA, where applicable)
Cloud billing and model API consumption
Code repositories and data platforms
Record of processing activities (GDPR)
Browsing, data loss prevention and device management
Expense claims and corporate cards
Supplier release notes
Communications, surveys and audits
Field Content
Systems registered as a result of the reconciliation
Systems in production without a gate detected Each one is a critical nonconformity (01 §12).

09Regulatory changes

Register of mapping changes (34 §10.3).

Change Official source and consultation date Use cases or systems affected Step reached (1–8 of 34 §10.3) Approved by the committee (Yes · No · Not required) Pending action

10Expired conditions, lapsed acceptances and disagreements

Type Reference Body that imposed it Expiry date Treatment
Expired gate condition P29 Outcome becomes Iterate (01 §7.4, rule 4).
Expired board decision condition DEC-AAAA-NNN The body is informed (62 §10.3).
Lapsed risk acceptance IA-AAAA-NNN · Rnn The risk blocks the gate again.
Disagreement with the AI Committee (E-13) Proposed resolution.

11Proposed decisions

Each proposal with the decision sheet of 60 §5.1.

Code What is requested Type Second-line response Options What happens if no decision is taken
DEC-AAAA-NNN Approve · Accept a risk · Take note · Assign

12Quality criteria

# Check Status
1 Critical and High risks, concentration and portfolio scenarios are up to date (33 §10). Met · Not met · Not applicable · Pending
2 All key risk indicators have a value and a threshold approved in C2, or are stated as "no data".
3 S1 and S2 incidents and critical nonconformities are reported individually (37 §9; 60 §4.6).
4 The exceptions in force match the P40 register.
5 The inventory reconciliation was carried out in the quarter with all the sources in 32 §9.
6 Each regulatory change has an official source and a consultation date.
7 The proposed decisions can be approved or rejected exactly as written.
8 Confirmed facts are distinguished from assessments in progress.

13Approval and verification

Function SEVEN-G role Name and position Date Signature or reference
Prepares Second-line coordinator for AI
Provides data AI Office
Is consulted Third line
Sees it and adds its position AI Committee
Oversees and decides Board committee Meeting and resolution (P39)

Segregation of duties: the second line reports independently of the areas that sponsor the portfolio; the AI Committee may add its position but does not change the report.


14Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 19-09-2026 First version. Brings together the quarterly information on risks (33 §10–12), incidents and nonconformities (37 §9), exceptions (30 §7.4), inventory reconciliation (32 §9) and regulatory changes (34 §10.3).

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.