Template P29 · Gate decision record

Gate decision record

Provides an auditable record of each gate decision: evidence, status of each criterion, degree of compliance, outcome, conditions, reason, and who verified and who decided.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used At all the gates of the lifecycle: G0, G1, G2, G3, G4, G5, the R6 continuity review and G7. One record for each iteration of the same gate.
Who completes it The team submits the evidence (block 3); the verifier completes blocks 4 to 7; the decision-maker, blocks 8 to 11; block 12 is reviewed by the AI Auditor (at Lite, by sampling, 01 §9.3). The AI Office keeps custody of the record.
Who verifies it and who decides As per 01 §7.5 (table in block 13).
Lite versus Enterprise Lite may omit the fields marked (Enterprise). At Lite, G0, G1 and G2 may be resolved in a single session, as may G4 and G5; one decision is recorded per gate even if the session is shared, and each piece of evidence is verified.
Tool T03 Gate manager (module of T01). The statuses and the calculation of the degree of compliance follow 03 §3.4.
Relationship Document 21 (criteria G<n>.<nn> and R6.<nn>) · document 22 (LV checklists) · P04 Intensity · P07 Ambition · P23 Go-live sign-off · P28 Value tracking · P30 Scale or retirement decision.

Decision rules (01 §7.4):

  1. Nobody decides on their own work. Whoever provides evidence neither verifies it nor decides.
  2. No mandatory evidence, no decision.
  3. Evidence must exist before the gate. Documentation prepared after the fact to justify progress already made invalidates the gate and is a major nonconformity.
  4. Conditions have a deadline and an owner. An expired condition that has not been fulfilled turns the outcome into Iterate.
  5. Iteration limit. After two iterations at the same gate, the decision is escalated to the higher body.
  6. Stop criteria are set in advance and are not relaxed without the approval of the body that authorised the use case.
  7. Every decision is recorded with outcome, reason, conditions, decision-maker and verifier.

02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
Use case name
Gate G0 Authorisation · G1 Opportunity · G2 Hypothesis · G3 Feasibility · G4 Design · G5 Go-live · R6 Continuity review · G7 Scale or retire.
Iteration 1, 2, 3… If it is the 3rd or later, the decision falls to the higher body (rule 5).
Grouped session (Lite) No · G0–G2 · G4–G5.
Intensity Lite · Enterprise (P04).
Ambition level Optimise · Augment · Transform (P07).
Regulatory classification Prohibited · High risk · Transparency obligations · Minimal risk · Out of scope · Pending classification.
Request date Date on which the team submits the evidence.
Verification date
Decision date
Days to decision Working days between request and decision. Indicative reference time limit: 5 (Lite) · 10 (Enterprise), as approved in C2 (03 §3.6).
Record version

03Evidence submitted

The mandatory evidence for each phase is set out in 01 §6.10.

Evidence Template Version Date of the evidence Link Prior to the request? (Yes · No) Verified (Yes · No) Verifier's observations
Value hypothesis canvas (illustrative example, G2) P08 1.0 02-03-2026 Document repository Yes Yes —
Baseline (illustrative example, G2) P09 0.9 28-02-2026 Document repository Yes No Baseline estimated without justification; measurement is required

04Gate criteria

The criteria in document 21 for the gate, the intensity and the ambition level are listed. No codes are invented: they are copied from document 21. Status: Met · Not met · Not applicable · Pending (03 §3.4).

Code (document 21) Criterion Mandatory (Yes · No) Status Linked evidence Justification (mandatory for Not met and Not applicable) Does it block the decision? (Yes · No)
[code from document 21] (illustrative example) The baseline is measured, not estimated, unless justified Yes Not met P09 v0.9 An estimate from the business area is provided without measurement Yes

Binary checklist applied: LV-Gn from document 22 · version: ______.


05Degree of compliance

Measure Value Calculation
Total criteria
Not applicable criteria
Applicable criteria Total − Not applicable.
Met criteria
Degree of compliance % Met ÷ applicable × 100.
Mandatory criteria Not met If greater than zero, Proceed cannot be recorded.
Mandatory criteria Pending If greater than zero, Proceed cannot be recorded.
Does any criterion not met affect critical controls for security, legal compliance or human oversight? Yes · No If Yes, Proceed with conditions is not possible (01 §7.3).

06Criteria differentiated by ambition level

Only at G2, G3, G5 and G7 (01 §7.6). The column for the use case's level is assessed.

Gate Optimise Augment Transform Status
Hypothesis (G2) Baseline for cost, time or errors; expected savings with a formula. Performance and cost metrics; adoption target. Return hypothesis with learning milestones; investment limit per stage; board approval.
Feasibility (G3) Positive expected annual net value within the horizon set in C2. Feasibility of adoption and of the role change, in addition to the expected net value. Feasibility of the first stage; stop criteria per stage; documented option value.
Go-live (G5) Efficiency validated against the baseline; plan to realise the released capacity. Actual adoption and performance improvement measured. Verified market or customer evidence.
Scale or retire (G7) Realised savings, not just released capacity. Sustained performance and reassigned capacity. Measured return and verified change in the operating model or the offering.

07Dual validation

Condition (01 §7.2) Is it met? (Yes · No) Verifier's comment
Tangible results: the criteria are met with real data, tests or results.
Verified documentation: the mandatory evidence exists, is traceable and has been verified.

If either is No, the gate cannot be passed.


08Outcome

Tick a single outcome permitted for the gate.

Gate Permitted outcomes
Authorisation (G0) Proceed · Proceed with conditions · Iterate · Stop
G1, G2, G3 Proceed · Proceed with conditions · Iterate · Pivot · Stop
G4, G5 Proceed · Proceed with conditions · Iterate · Stop
Continuity review (R6) Proceed with operation · Proceed with conditions · Bring G7 forward (01 §7.3)
Scale or retire (G7) Scale · Iterate · Retire. Keeping the system unchanged is recorded as Iterate with a return to phase 6.
Outcome Tick
Proceed ☐
Proceed with operation (R6 only) ☐
Proceed with conditions ☐
Iterate ☐
Pivot ☐
Stop ☐
Scale (G7 only) ☐
Retire (G7 only) ☐
Bring G7 forward (R6 only) ☐
Field Content Guidance
Reason for the decision Brief reasoning based on blocks 4 to 7. Mandatory for all outcomes.
If Iterate: what must be repeated and planned date of the new request At G7, the phase to which it returns (phase 6 if the system is kept unchanged).
If Pivot: new hypothesis to be formulated in phase 2 The approved context is retained.
If Scale: reference to the new phase 0 Detailed in P30.
Risks accepted in this decision (Enterprise) Risk, residual level and who accepts it according to its level (document 33).

09Conditions

Only with Proceed with conditions. The conditions are verified at the next gate or on the date indicated. Status: Open · Fulfilled · Expired.

# Condition Related criterion Owner Deadline How it will be verified Status
1 (illustrative example) Complete the training of the designated supervisors on the second shift [code from document 21] AI Product Owner 30-06-2026 Attendance record in P20 Open

10Coded stop or retirement reason

Mandatory with Stop or Retire. Tick one main reason and, where appropriate, one secondary reason (03 §3.3).

Reason Main Secondary
No plausible value ☐ ☐
Hypothesis refuted ☐ ☐
Insufficient data ☐ ☐
Technically unfeasible ☐ ☐
Cost exceeds value ☐ ☐
Unacceptable risk ☐ ☐
Regulation ☐ ☐
No adoption ☐ ☐
Replaced by another solution ☐ ☐
Change in strategic priority ☐ ☐
Field Content Guidance
Lessons learned Link to the lessons block in P30 or summary.
Resources released Unspent budget, people and licences.
Retirement plan (if Retire) P30.

11Escalation and board approval

Field Content Guidance
Is it escalated to the higher body owing to the iteration limit? Yes · No. Body and date.
Does it require board approval? Yes for Transform at G2 and for Scale at G7 (01 §7.5).
Body, date and minutes reference (Enterprise) Board or board committee.
Linked board recommendation (Enterprise) Identifier in the recommendations register (document 62), if any.

12Quality criteria

The AI Auditor (at Lite, by sampling) checks the quality of the record itself, in addition to the criteria in document 21 for the specific gate:

# Check Status (Met · Not met · Not applicable · Pending)
1 All mandatory evidence is recorded, dated prior to the request.
2 Each criterion has a status, evidence and, where appropriate, justification.
3 The degree of compliance is correctly calculated.
4 The outcome is one of those permitted for the gate and is consistent with the mandatory criteria.
5 The conditions do not affect critical controls and have an owner and a deadline.
6 Stop and Retire have a coded reason.
7 Verifier and decision-maker are different people and are not part of the team.
8 The iteration limit is respected.

13Approval and verification

Function Role as per 01 §7.5 Name Date Part of the team that builds? Declaration of no conflict of interest
Submits the evidence AI Product Owner or another team role Yes —
Verifier Must be No ☐
Decision-maker Must be No ☐
Risk clearance (where required) AI Risk Owner Must be No ☐

Reference from 01 §7.5:

Gate Verifies (Lite) Decides (Lite) Verifies (Enterprise) Decides (Enterprise)
Authorisation (G0) AI Office Sponsor AI Auditor AI Committee
Opportunity (G1) AI Office Sponsor AI Auditor Sponsor, informing the committee
Hypothesis (G2) AI Office Sponsor AI Auditor AI Committee
Feasibility (G3) AI Office Sponsor with risk clearance AI Auditor AI Committee
Design (G4) AI Office Sponsor with risk clearance AI Auditor AI Committee
Go-live (G5) AI Office Sponsor with risk clearance AI Auditor AI Committee after multi-level sign-off (P23)
Continuity review (R6) AI Office Sponsor AI Auditor AI Committee
Scale or retire (G7) AI Office Sponsor AI Auditor AI Committee

14Version control

Version Date Changes
0.1 16-09-2026 First version of the template. Consistency adjustments with 01 (segregation of duties at Lite, R6 outcomes, agents criterion) and with 34 and 37.