SEVEN-G
Document 62 · 16-09-2026

Document 62 · Recommendations and decisions register

Recommendations and decisions register

Tracking, with persistent identifiers, of what the board recommends, assigns and decides

Fernando García VarelaVersion 0.2 (working draft)16-09-2026Draft for review
2record types with their own identifier
4statuses declared by the recipient
4independent assessments
0reused identifiers

01Purpose and scope

The recommendations and decisions register keeps, with identifiers that are never reset, what the board and its committees recommend, assign and decide on AI, who must carry it out, within what time limit, what evidence has been provided and whether someone independent considers that it has been met.

Its purpose is to ensure that follow-up does not depend on the memory of meetings or on the minutes, and to distinguish what the recipient declares from what has been verified.

It applies to:

It does not replace the minutes, which are the corporate record, or the lifecycle gate decision record (template P29, tool T03). The register links to both.


02Principles

# Principle What it implies
1 Persistent identifier Each recommendation and each decision receives a code that does not change, is not reused and is not reset.
2 Declared is not verified The recipient declares the status; an independent person assesses compliance. The two are shown separately.
3 No evidence, no compliance A recommendation can only be assessed as conformant if there is linked, dated and versioned evidence.
4 Nothing is closed silently Closure and discarding are accepted by the body that issued the recommendation, with a record.
5 Every change is an event Changes of status, date, recipient or text are recorded with date, author and reason.
6 Linked to measurement Each recommendation indicates the block of the board dashboard or the item of data in the use case register where its effect is checked.
7 A single data model The register is the Recommendation entity of the common model (03 §4); it is fed by and feeds the other tools.

03Identifiers

3.1 Format

The board dashboard data schema (motor/ESQUEMA.md in the demonstrations repository) does not define an identifier format for recommendations. The T18 demonstration tool uses sequential codes per organisation (R-01, R-02…) grouped by session. SEVEN-G adopts the format of the common specification:

Type Format Example Status of the format
Recommendation or assignment REC-AAAA-NNN REC-2026-007 Common specification §5.9
Decision of the board or the committee DEC-AAAA-NNN DEC-2026-014 Proposed in this document; pending incorporation into the common specification §5.9 and the glossary (document 02)

3.2 Rules

  1. AAAA is the year in which the recommendation is issued or the decision is adopted (or requested).
  2. NNN is a sequential number of at least three digits that is not reset when the year or session changes. If 999 is exceeded, four digits are used.
  3. An identifier is never reused, not even when the recommendation is discarded, cancelled owing to a recording error or merged with another.
  4. A recommendation that is split keeps its identifier in the main part; the new parts receive new identifiers and are linked to the original.
  5. A substantially reformulated recommendation is closed as Superseded and a new linked one is recorded. Minor wording changes are recorded as an event without changing the code.
  6. The correspondence with previous identifiers (for example, R-NN from a previous tool) is kept in the previous identifier field.
  7. Use cases keep their own IA-AAAA-NNN code (document 03); incidents and nonconformities, INC-AAAA-NNN and NC-AAAA-NNN.

04Fields of a recommendation

Block Field Content Mandatory Completed by
Identification Code REC-AAAA-NNN Yes Board secretariat
Previous identifier Code in a previous tool, if any. No AI Office
Issuing body Full board, board committee (which one) or director or adviser with AI experience, with the board's acceptance. Yes Board secretariat
Session of origin Body and date of the session; reference to the minutes. Yes Board secretariat
Type Recommendation · Assignment. Yes Board secretariat
Content Text What is recommended, worded so that it can be checked whether it has been met. Yes Issuing body
Reason Why it is recommended, in one or two sentences. Yes Issuing body
Compliance criterion What evidence will demonstrate that it has been met. Yes Issuing body, with the AI Office
Area Value · Risk · Compliance · Security · Data · People · Governance · Suppliers. Yes AI Office
Sphere 01 to 09 (controlled taxonomy, 03 §3.3). Yes AI Office
Priority High · Medium · Low, using the criterion approved by the issuing body. Yes Issuing body
Accountability Recipient Accountable person and area. A single person is accountable, even if several areas collaborate. Yes Issuing body
Original committed date Date agreed when the recommendation was issued. It is not overwritten. Yes Recipient, accepted by the body
Current committed date Current date after rescheduling. Yes System
Reschedulings Number, dates, reason and who accepted them. If any Recipient and issuing body
Follow-up Declared status Section 5. Yes Recipient
Status date Date of the latest declaration. Yes System
Evidence provided Links, with type, author, date and version (section 7). To declare Met Recipient
Independent assessment Section 6. To close Independent assessor
Assessor and date Person and date of the assessment. To close System
Assessment comment Reason for the assessment, especially if it is nonconformant. If nonconformant Independent assessor
Closure Situation Open · Closed · Discarded · Superseded. Yes System, with the body's acceptance
Closure date and body Who accepted the closure or discarding and when. On closure Board secretariat
Links Use cases IA-AAAA-NNN codes affected. If any AI Office
Systems, incidents and nonconformities INC-AAAA-NNN, NC-AAAA-NNN, inventory systems. If any AI Office
Decisions Related DEC-AAAA-NNN. If any Board secretariat
Dashboard block Block of the board dashboard where the effect is measured (section 11). Recommended AI Office
History Events Creation, status changes, reschedulings, assessments, closure, with date, author and comment. Yes System

How to word a verifiable recommendation

Hard to verify Verifiable
"Improve value measurement." "Break down the value of each use case in production into efficiencies, return and recurring cost, with attribution method and management control validation, before the year-end close."
"Strengthen agent security." "Ensure that each agent with the ability to act has its own identity, minimum permissions, action logging and a tested kill switch, before extending its use."
"Take regulation into account." "Classify all systems in the inventory under the EU AI Act with a signed legal opinion, starting with those that affect decisions about people."

05Statuses declared by the recipient

Status Meaning Requirements
Pending Work has not started. Current committed date.
In progress Work has started and has not been completed. Brief description of progress and current committed date.
Met The recipient considers that the recommendation has been met. Evidence provided that covers the compliance criterion. It automatically moves to awaiting assessment.
Discarded The recipient proposes not to carry it out. Reason and alternative, if any. Requires the acceptance of the issuing body; until then the recommendation remains open.

Alerts calculated by the register that are not statuses:

Alert When it is triggered
Overdue The current committed date has passed and the status is neither Met nor accepted Discarded.
Not updated The status has not been updated since the previous session of the issuing body.
Awaiting assessment Declared Met and without an independent assessment within the set time limit (by default, before the next session).
Discrepancy Declared Met and assessed Nonconformant.
Repeated rescheduling Two or more reschedulings (section 9.3).

06Independent assessment

6.1 Who assesses

The assessment is carried out by a person independent of the recipient and of whoever carries out the work: internal audit, the AI Auditor, the second line when the recommendation does not affect its own work, or the director or adviser with AI experience when the board commissions them and they have no interest in the execution. The issuing body appoints the assessor by type of recommendation.

6.2 Scale

Assessment Meaning Consequence
Conformant The evidence demonstrates that the compliance criterion is met. Closure is proposed to the issuing body.
Conformant with observations The essentials are met; non-critical aspects remain, which are indicated. Closure is proposed with the observations recorded; if any observation requires work, it is recorded as a new linked recommendation.
Nonconformant The evidence does not demonstrate compliance or is insufficient. The recommendation returns to In progress with a new committed date; the discrepancy is recorded.
Not assessed It has not yet been assessed. Initial assessment status.

6.3 Rules

  1. The assessment is based only on the linked evidence. Anything not in the register is not considered.
  2. The assessor does not rewrite the recommendation. If they consider the compliance criterion inadequate, they propose a change to the issuing body.
  3. Discrepancies are reported to the board in the quarterly pack (60 §4.7).
  4. The assessment is shown alongside the declared status, never in its place.

07Evidence provided

Requirement Description
Link Location of the document or data in the company's repository. Evidence is linked, not copied (03 §2).
Type Approved document · Record or data from a system · Test result · Minutes or decision · Audit report · Verifiable configuration.
Author, date and version Mandatory.
Relationship with the criterion Which part of the compliance criterion it covers.
Prior verification If the evidence has already been verified at a gate or in an audit, who verified it and when is stated.

The following are not sufficient evidence on their own:


08Lifecycle

Lifecycle of a recommendation
The recipient declares; someone independent assesses; the issuing body closes
flowchart LR
  E["Issued and recorded"] --> P["Pending"]
  P --> C["In progress"]
  C --> D["Declared met with evidence"]
  D --> V{"Independent assessment"}
  V -->|"Conformant or with observations"| K["Closure accepted by the issuing body"]
  V -->|"Nonconformant"| C
  P --> X["Discarding proposed"]
  C --> X
  X -->|"Accepted"| XD["Discarded"]
  X -->|"Not accepted"| C
  classDef ok fill:#d9ebe0,stroke:#0d7680,color:#1a1817
  classDef med fill:#f2dfce,stroke:#0f5499,color:#1a1817
  classDef ko fill:#f3d3da,stroke:#990f3d,color:#1a1817
  class K ok
  class E,P,C,D,X med
  class XD ko
Source: SEVEN-G
Step What happens Who Reference time limit
1. Issue The body formulates the recommendation in the session. Issuing body In the session
2. Recording Code, recipient, compliance criterion and committed date are assigned. Board secretariat with the AI Office 5 working days after the session
3. Acceptance by the recipient The recipient confirms that they understand it and accepts the date, or proposes another to the issuing body. Recipient 10 working days after recording
4. Execution The recipient updates the status before each session of the issuing body. Recipient Before the pack cut-off date
5. Declaration of compliance Met status with linked evidence. Recipient Before the committed date
6. Assessment Conformant, conformant with observations or nonconformant. Independent assessor Before the next session
7. Closure The issuing body accepts the closure in session or through the procedure it has delegated. Issuing body At the next session

09Closure, discarding, rescheduling and reopening

9.1 Closure

A recommendation is closed when three conditions are met at the same time: declared status Met, assessment Conformant or Conformant with observations, and acceptance by the issuing body. The closure records the date, the body and the reference to the minutes.

9.2 Discarding

Discarding is legitimate when the recommendation has lost its purpose (change of strategy, retired use case, alternative solution) or when its cost clearly exceeds its benefit. It requires a reason, an alternative if one exists and the express acceptance of the issuing body. A discarded recommendation does not disappear from the register or from the indicators.

9.3 Rescheduling

9.4 Reopening

A closed recommendation is reopened, keeping its code, if it is discovered that the evidence was incorrect or that compliance has not been maintained (for example, a control that was subsequently deactivated). The reopening is recorded as an event with a reason and reported to the issuing body. If the problem is different from the original one, a new linked recommendation is recorded.

9.5 Supersession

When the issuing body substantially reformulates a recommendation, the original is closed as Superseded with a reference to the new one, which receives its own code.


10Recorded board decisions

10.1 Which decisions are recorded

Decision Recording
Approval of the AI thesis, ambition by sphere, risk appetite, corporate policy and framework budget (C2). Mandatory
Approval of Transform use cases at G2 and of their scaling at G7. Mandatory
Exceptional acceptance of Critical residual risks. Mandatory
Decisions of the annual review (C5): adjustments to the thesis, thresholds and time limits. Mandatory
Notings of stops, retirements, S1 incidents and critical nonconformities. Mandatory
Assignments to management. Recorded as recommendations of type Assignment (REC).
Other decisions on AI by the board or the board committee. Recommended

10.2 Fields of a decision

Field Content
Code DEC-AAAA-NNN (proposed).
Body and session Full board or board committee; date; reference to the minutes.
Type Approve · Authorise with limits · Accept a risk · Take note (60 §4.3).
Text of the decision As recorded in the minutes.
Decision sheet Link to the sheet presented (60 §5).
Outcome Approved · Approved with conditions · Deferred · Rejected.
Target ambition per sphere Only in the decision approving the C2 thesis (document 13): target ambition of each value sphere 01–07 —Optimise, Augment, Transform or not a priority—. Those with Transform are the spheres of condition IT-D1 in document 12. The board dashboard reads it for the impact map (60 §10.5).
Conditions and limits Each condition with owner and time limit; limits on investment, stage and validity.
Validity Date until which it is valid, where applicable (for example, the acceptance of a risk).
Execution owner Accountable person.
Links IA-AAAA-NNN, REC-AAAA-NNN, INC-AAAA-NNN, NC-AAAA-NNN, gate decision (P29).
Follow-up Execution status of the conditions (pending, in progress, met, overdue) and review date.
History Events with date, author and reason.

10.3 Rules

  1. A deferred decision keeps its code and is presented again with it.
  2. The conditions of a decision are tracked like those of a gate: an expired condition that has not been met is reported to the body, which decides whether the decision remains in force.
  3. A risk acceptance expires on its validity date; from then on, the risk once again blocks the corresponding gate until a new decision is taken.
  4. The board decision at G2 or G7 and the gate decision record are linked in both directions, so that lifecycle traceability is complete.

11.1 With the use case register

11.2 With the board dashboard

Each recommendation indicates the dashboard block (T17) in which the board can check its effect:

Area of the recommendation Dashboard block
Value, cost, validation, additional net value per euro Value versus potential
Ambition level and distribution of investment Where the company invests
Decision times and time to production Agility
Regulatory classification, controls, impact assessments Risk and compliance
Assistants and agents: guardrails, tests, identity and permissions Assistants in production; agents
Retirements, new additions and incidents Movements and incidents
Licences, use, unauthorised use, training Trend and adoption
Exposure to AI-enabled attacks Exposure to AI-enabled attacks
Inventory and typology Inventory

11.3 Register indicators

They are reported in the quarterly pack (document 60) and in the annual review:

Indicator Definition
Open Recommendations not closed, discarded or superseded, by issuing body and area.
Overdue Open, with the current committed date passed.
Closed in the period With a conformant or conformant with observations assessment.
Discrepancies Declared met and assessed nonconformant in the period.
Time to closure Median days from recording to closure, by priority.
Reschedulings Percentage of recommendations with at least one rescheduling and with two or more.
Expired decision conditions Conditions of DEC decisions past their time limit.
Awaiting assessment Declared met without independent assessment.

12Tool T18: current situation and pending adaptation

12.1 Current situation

The tool T18 · Board recommendations register exists (03 §5.4) as part of the public demonstrations repository for the board dashboard, with fictitious data in eleven sectors. For each session, it shows each recommendation with an identifier that is never reset, area, recipient, committed date, declared status, evidence presented, free-text assessment and a link to the dashboard block where it is measured.

The engine files published in that repository are a copy of their private source project: they are not edited in the demonstrations repository but at source, and are republished using their procedure, which includes a terminology check before publication.

12.2 Adaptation required

Aspect Current T18 (demonstration) SEVEN-G requirement Adaptation
Identifier Sequential R-NN per organisation REC-AAAA-NNN without reset New format; keep the previous one in previous identifier.
Decisions Not recorded DEC-AAAA-NNN with conditions and validity New entity and view.
Origin Numbered sessions of a body Issuing body (full board, committee, adviser) and session Issuing body field and filter.
Declared statuses Pending, in progress, met, discarded The same four No change in values; add status date.
Assessment Free text Scale Conformant · Conformant with observations · Nonconformant · Not assessed, with assessor, date and comment Structured fields.
Compliance criterion Does not exist Mandatory New field.
Dates A single committed date Original date, current date and reschedulings New fields and history.
Evidence Free text Links with type, author, date and version Evidence structure of the common model (03 §4).
Closure Not explicit Situation (open, closed, discarded, superseded) with body and date New block.
Links Dashboard block Dashboard block, IA, INC, NC, DEC Extend.
History Does not exist Events with date, author and reason New.
Alerts Count by status Overdue, not updated, awaiting assessment, discrepancy, repeated rescheduling New calculation.
Data source Demonstration data generated with the dashboard Recommendation entity of the common model, integrated with T01 Integration in tool wave 1 (03 §6).
Terminology Designed for tracking the recommendations of an advisory body Generic for any issuing body Configurable texts.

Priority: tool wave 1 (03 §6), together with connecting the T17 dashboard to the use case register. Until the adaptation is available, the register can be kept with template P69, prepared as a spreadsheet with the fields in sections 4 and 10.

12.3 Status of the adaptation (version 0.1)

From schema 0.5 of the use case register, T18 is a T01 module ("Board (T18)" view), with a single data model (03 §4):

Aspect Available Pending
Identifiers REC-YYYY-NNN and DEC-YYYY-NNN, sequential by year and never reset. Previous identifier of migrated records.
Decisions Body, minutes reference, type, subject, text, outcome, linked use cases and recommendations, investment cap and stage, stage decision, validity, owner and spheres with Transform as target (section 10.2). Conditions with owner and time limit, and their follow-up.
Recommendations Text, addressee, status (open, in progress, closed, discarded), evidence and linked use cases. Compliance criterion, original and current dates, rescheduling, independent assessment, history and the alerts in section 5.
Transformation index Decisions feed signal 8 and condition IT-D1 of document 12 in the T14 calculator. —
Board dashboard The T17 connector generates the register page from the recommendations in T01. Decisions in the dashboard.

Why it matters. Board decisions no longer live only in the minutes: they are linked to use cases and recommendations, and the transformation index can check with data whether the board decides on, funds and oversees Transform bets. What is pending is still kept with template P69.


13Illustrative example

Fictitious records, unrelated to any company.

Field REC-2026-003 REC-2026-009 DEC-2026-014
Body and session Board committee · March session Full board · June session Full board · September session
Type Recommendation Assignment Authorise with limits
Text Break down the value of each use case in production into efficiencies, return and recurring cost, with management control validation. Present the company's position on the effect of AI on employment. Authorise stage 1 of IA-2026-018 with a limit of €400,000 and a continuity decision in nine months.
Compliance criterion All use cases in production with the three components and status; management control report. Document approved by senior management and presented to the full board. Condition: pilot contract approved by legal counsel within 60 days.
Recipient or owner Management control department People department Sales department
Original · current date 30-06 · 30-09 (1 rescheduling) 30-11 · 30-11 Condition: 60 days from the decision
Declared status Met In progress Condition in progress
Evidence Management control validation report (version 2); value table per use case in the register. Draft position (version 1). —
Assessment Conformant with observations: two generative AI use cases keep their value as declared. Not assessed —
Situation Closure proposed at the December session; observation recorded as REC-2026-017. Open In force
Links Dashboard block: Value versus potential Dashboard block: Trend and adoption IA-2026-018 · REC-2026-006

14Associated tools and templates

Name Use in this document
Use case register (T01) IA-AAAA-NNN links and events.
Gate manager (T03) Link between board decisions and gate decisions.
Nonconformity and incident register (T08) INC and NC links.
Board AI dashboard (T17) Blocks where the effect of each recommendation is checked.
Board recommendations register (T18) Implementation of the register (section 12).
Gate decision record (P29) Transform G2 and G7 decisions.
Scaling or retirement decision (P30) G7 decisions escalated to the board.
Board decisions register (P69) Register of recommendations, assignments and decisions until T18 has been adapted (sections 4, 10 and 12.2).

Document Relationship
00 · What SEVEN-G is and how it helps companies Recommendations register as a measurement component and tool.
01 · Foundational methodology Decision rules, iteration limit, bodies.
02 · Glossary and conventions Incorporation of the DEC-AAAA-NNN code and of the statuses.
03 · Tools and use case register Data model (Recommendation entity), T17, T18 and build order.
38 · AI audit framework Independent assessment and conformity scale.
60 · Board pack Extract from the register in each pack and decision format.
61 · Board conversation guide Recording after each session.

16Version control

Version Date Changes
0.1 16-09-2026 First version. Defines persistent identifiers REC-AAAA-NNN and, as a proposal, DEC-AAAA-NNN; fields, declared statuses, independent assessment, evidence, lifecycle, closure, board decisions, links with use cases and the dashboard, indicators and pending adaptation of tool T18.
0.2 28-09-2026 The decision approving the C2 thesis records the target ambition of each sphere (§10.2), which the board dashboard uses in the impact map (60 §10.5).

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.