SEVEN-G
Template P50 · 19-09-2026

Template P50 · Nonconformity register

Nonconformity register

Records each nonconformity with the framework and tracks it from detection to closure by the AI Auditor, with type, containment, root cause, actions, effectiveness verification and time limits.

Fernando García VarelaVersion 0.1 (working draft)19-09-2026Draft for review

Why it matters. A framework that does not record its own breaches cannot demonstrate that it is being complied with. The nonconformity record forces the event to be separated from its cause, the effectiveness criterion to be set before it is verified, and closure to be carried out by someone other than whoever gave rise to it. The company register allows the AI Committee and the board committee to see what is open, what is overdue and what keeps recurring; without it, critical nonconformities can remain buried in emails and the framework audit (document 38) has nothing to sample.

01Instructions for use

Aspect Guidance
When it is used From the moment a possible nonconformity is detected (37 §3.1): in a gate verification, an R6, an audit, a use case register alert, a control test, an incident or a report from anyone. The record remains open until closure and, for critical and major nonconformities, until the re-audit.
Who completes it The AI Office records and keeps it. Whoever detects the nonconformity proposes the type; the action owner documents containment, root cause and actions.
Who verifies it The AI Auditor confirms the type, verifies effectiveness and closes it. At Lite intensity, the AI Auditor may close minor nonconformities on the basis of the AI Office's documentary verification (37 §3.8).
Who decides or approves The action plan is approved by the AI Committee (critical), the AI Risk Owner (major) or the AI Office (minor). Disagreements about the type are resolved by the AI Committee.
Stage, gate or moment At any point in the use case lifecycle and the corporate cycle. It is reviewed at R6 (R6.15), at G7 (G7.04), in the C4 quarterly report and in the C5 annual review.
Tool T08 · Nonconformity and incident register (T01 module), with statuses, time limits, overdue alerts and links. This template is its equivalent in document or spreadsheet format.
Reference document Document 37 §3 (process), §6 (relationship with incidents) and §8–9 (indicators and reporting to the board); 01 §12.
Lite versus Enterprise The process is the same. Lite may omit the fields marked (Enterprise); the root cause for major and critical nonconformities and closure by the AI Auditor are never omitted.

Completion rules:


02Identification

Field Content Guidance
Code NC-AAAA-NNN.
Title One line the AI Committee can understand.
Detection date DD-MM-AAAA. The time limits in section 7 run from this date.
Detection source Gate verification · R6 · Internal audit · External audit · Register alert · Control test · Incident · Unauthorised use of AI · Report from an employee, customer, supplier or supervisor.
Detected by Role and name.
Recorded by AI Office; date of recording.
Scope Use case (IA-AAAA-NNN), system (SIA-AAAA-NNN), supplier, area or corporate process.
Intensity of the affected use case Lite · Enterprise · Not applicable (corporate process).
Action owner Named person, other than the auditor who will close it.

03Requirement not met and description

Field Content Guidance
Requirement not met Document, section and verbatim text of the requirement.
Criterion or control affected Gate criterion (Gn.nn of document 21), SEG or AG control of document 35, contractual clause or other.
Description of the finding What has been observed, with objective evidence. Facts, not opinions.
Evidence Reference to the documents, logs or screenshots preserved.
Does it invalidate a gate? Yes · No. If Yes, the use case returns to the status prior to that gate until it is corrected (37 §3.4).
Linked incident INC-AAAA-NNN (P27), if any. The type of the nonconformity is determined by the requirement not met, not by the severity of the incident (37 §6).
Other links (Enterprise) Risks (IA-AAAA-NNN · Rnn), gate decisions (P29), board recommendations (REC-AAAA-NNN).

04Type

Type Criterion (any one suffices) Tick
Critical Exposes the company or people to immediate serious harm or to a serious legal infringement, or nullifies the framework's control over a system in production. ☐
Major Affects the validity of a decision, the segregation of duties or a relevant control, without immediate serious harm. ☐
Minor One-off breach with no impact on decisions or on relevant controls. ☐
Field Content Guidance
Justification of the type Using the examples in 37 §3.3.
Rule applied None · Recurrence (third minor nonconformity in twelve months becomes major; a major one recurring within twelve months becomes critical if it affects production) · Accumulation (same cause as another NC; single analysis) · Unauthorised use of AI (at least major if personal or confidential data are involved).
Related nonconformities Codes of those sharing the cause or of previous ones in the event of recurrence.
Type proposed by Whoever detects it.
Type confirmed by AI Auditor; date.
Disagreement resolved by AI Committee; date and reference of the minutes, if there was a disagreement.

05Containment

Mandatory for critical and major nonconformities. Options from lowest to highest intensity: restriction of use or scope · additional temporary human validation · lowering of the autonomy level (A0–A3) · suspension of a capability with the kill switch · suspension of the system with a fallback process (P19) · withdrawal from production.

Date and time Containment action Decision-maker Effect observed Evidence
(illustrative example) 03-11-2026 16:00 Suspension of the agent's refund capability with the kill switch AI Sponsor No automatic refunds since 16:05; manual process active Kill switch and fallback process logs

06Root cause and action plan

6.1 Root cause

Field Content Guidance
Method Five whys · Ishikawa · Both (P52).
Immediate cause What directly produced the event.
Root cause Cause in the management system that can be acted upon. "Human error" is not a final root cause.
Does it meet the four validity conditions? Explains all the facts · had it been eliminated the failure would not have occurred or would have been detected · is actionable · does not merely point at a person. Yes · No.
Does the same failure exist in other systems or use cases? Systems reviewed and result.
Reference of the worksheet P52, version and date.

6.2 Actions

Type: Correction · Corrective action · Preventive action. Status: Pending · In progress · Executed · Verified effective · Not effective.

No. Type Action Owner Time limit Effectiveness criterion Expected evidence Status
A01
A02
(illustrative example) A01 Corrective action Add the relevant-change criterion to P24 and T03 AI Operations Owner 15-12-2026 No relevant change without a gate in the following three months Sample of changes from P27 In progress
Field Content Guidance
Plan approved by AI Committee (critical) · AI Risk Owner (major) · AI Office (minor).
Approval date
Agreements with other areas Head of the area with whom each action that depends on it has been agreed.

07Time limits

Reference time limits from 37 §3.10, running from detection unless otherwise indicated. The company may adjust them in C2 without exceeding those set by the applicable regulation; record here those approved.

Step Critical Major Minor Deadline for this NC Actual date On time?
Recording Same day 2 working days 5 working days
Containment Immediate, within 48 hours at most Within 10 days at most Not required
Root cause and action plan Within 10 days at most Within 30 days at most Before the next gate or review
Execution of actions As per plan; as a guide, 60 days As per plan; as a guide, 90 days Before the next gate or review
Effectiveness verification Within the time limit in the plan Within the time limit in the plan At the next gate or review
Re-audit Mandatory Mandatory By sampling
Reports to AI Committee and board committee AI Committee AI Office

Any status other than Closed with a time limit exceeded generates the Overdue flag. An overdue minor nonconformity is escalated to the AI Committee; an overdue major one, to the board committee.


08Effectiveness verification, closure and re-audit

Field Content Guidance
Period of operation observed Next gate or R6, sample of operations or test of the control.
Result against the effectiveness criterion Effective · Not effective. If not effective, the NC returns to Under analysis.
Evidence of the verification
Closure checks Containment carried out · root cause documented (major and critical) · actions executed · effectiveness verified with evidence · register updated.
Closure date
Closed by AI Auditor. Never whoever gave rise to the NC or the action owner.
Re-audit date (Enterprise) As a guide, between three and six months after closure for critical and major nonconformities (37 §3.9).
Result of the re-audit The correction is still operating · Reopened.

09Status and history

Statuses: Open · Contained · Under analysis · Plan approved · In progress · Awaiting verification · Closed · Reopened. Flag: Overdue.

Date Previous status New status Author Reason
Open

10Company register

Aggregated view kept by the AI Office. One row per nonconformity; sorted by type and age.

Code Title Scope Type Source Detection Action owner Status Next deadline Overdue Linked incident Closure
NC-2026-014 (illustrative example) Relevant change in production without a gate IA-2026-003 Major Register alert 03-11-2026 AI Operations Owner In progress 15-12-2026 No —

Indicators for the period (37 §8):

Indicator Value Previous period Remarks
Open nonconformities by type and age
Overdue nonconformities by type
First-time effectiveness (% closed without returning to analysis)
Reopenings in twelve months
Average time to closure by type (days)
Nonconformities in incident management Late report, evidence not preserved, post-incident analysis omitted.

11Quality criteria

Formal criteria in document 21 (R6.06, R6.15 and G7.04) and process in document 37.

# Check Status
1 The requirement not met is a "must", is quoted verbatim and there is objective evidence. Met · Not met · Not applicable · Pending
2 The type is justified with the criteria in 37 §3.3 and confirmed by the AI Auditor; the recurrence and accumulation rules have been applied.
3 Critical and major nonconformities have containment recorded with date, decision-maker and effect.
4 Critical and major nonconformities have a valid root cause (P52) and it has been checked whether the failure exists in other systems.
5 Each action has an owner, a time limit, an effectiveness criterion set at approval and expected evidence.
6 The plan is approved by the body that corresponds to the type.
7 The time limits are met or the NC is flagged as Overdue and escalated.
8 The AI Auditor closes it, with effectiveness verified; critical and major nonconformities have a scheduled re-audit.

12Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Records and keeps AI Office
Detects and proposes the type Any role
Executes the action Action owner
Confirms the type, verifies effectiveness and closes AI Auditor
Approves the plan AI Committee · AI Risk Owner · AI Office, according to type

Segregation of duties: whoever gave rise to the nonconformity does not verify its correction, and the action owner does not close it; only the AI Auditor closes it (37 §2, principle 5).


13Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 19-09-2026 First version. Record and company register of NC-AAAA-NNN nonconformities with the full process of 37 §3 and the time limits of 37 §3.10.