SEVEN-G
Template P19 · 16-09-2026

Template P19 · Rollback plan and test

Rollback plan and test

Defines when and how the AI system is stopped or rolled back, who does it and how quickly, and records that the plan has been tested.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used The plan (blocks 3 to 9) is prepared in phase 4 and reviewed at G4. The test (block 10) is performed in phase 5 and is mandatory evidence for G5. It is updated after each relevant change (P27).
Who completes it AI Technical Owner (plan) and AI Operations Owner (performance of the test).
Who verifies it AI Office or AI Risk Owner under Lite; AI Auditor under Enterprise.
At which gate it is reviewed G4 (plan) and G5 (test). Its currency is checked at R6.
Lite versus Enterprise Lite may omit the fields marked (Enterprise), but not the test: the reversibility principle requires a tested plan before go-live (01 §3, principle 4).
Relationship P16 Lineage (previous versions) · P17 Human oversight (degraded mode) · P18 Kill switch · P24 Operations manual · P25 Alerts · P26 Incident response · P27 Change log · document 52.

Rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
AI system(s) Identifier in the inventory (T02).
System version covered by the plan Version of model, prompts and configuration (P16).
Autonomy level A0 · A1 · A2 · A3 (P17).
Intensity Lite · Enterprise.
Document version
Author Role and name.
Date DD-MM-AAAA.
Document status Draft · Submitted for verification · Verified · Approved · Superseded.

03Rollback scope

Field Content Guidance
Components that can be rolled back Model, system prompts, knowledge base, agent tools, integration, configuration.
Safe target state Previous version (identifier) · Degraded mode · Process without AI.
Dependencies Systems affected by the rollback.
Effect on outputs already produced What happens to decisions, content or actions already executed (block 8).

04Triggers

Type: Performance · Security · Compliance · Incident · Cost · Value · Decision by a body. Activation: Automatic · Manual.

ID Trigger Type Measurable threshold Detection source (P25 alert) Who decides to roll back Activation
D-01 (illustrative example) Degradation in the quality of proposals Performance Human override rate above 25 % for two consecutive days Human oversight alert AI Operations Owner Manual
D-02 (illustrative example) Agent action outside limits Security A single executed action that exceeded a limit in P18 Action log Automatic; informs security Automatic
D-03 (illustrative example) Incident classified as S1 Incident S1 classification according to document 37 P26 Incident coordinator Manual
D-04 (illustrative example) Consumption budget exhausted Cost Month-to-date consumption ≥ 100% of the budget P25 cost alert AI Operations Owner Manual

05Rollback options

Tick those that are prepared and indicate which one applies to each trigger.

Option Prepared (Yes · No) Triggers it responds to Observations
Return to the previous version of the model
Return to the previous version of prompts, knowledge base or configuration
Reduce the autonomy level (degraded mode, for example from A2 to A1)
Move to a level of the cost-driven degradation cascade: validated fallback model or reduced scope (document 52 §10.3) Only with the fallback model recorded in P16 and evaluated before G5; not in uses that decide about people unless specifically validated. It never deactivates critical controls.
Deactivate the AI function and return to the process without AI
Full stop using the kill switch Always prepared at A2 and A3.

06Execution steps

One table per prepared option. The steps must be followable without knowledge of the internal design.

# Step Owner (role) Estimated time How completion is checked
1 (illustrative example) Record the decision to roll back and the trigger AI Operations Owner 5 min Event in P27
2 (illustrative example) Activate degraded mode A1 in the configuration On-call technician 10 min New proposals remain pending validation
3 (illustrative example) Notify the overseers of the mode change AI Product Owner 15 min Read confirmation
4 (illustrative example) Verify that no queued actions are executing On-call technician 10 min Empty queue in the action log

07Owners, communication and target time

Field Content Guidance
Who authorises the rollback Role and deputy. For automatic triggers, who confirms after the fact.
Who executes Role and hours of cover.
Who is informed AI Sponsor, users, support, risk; customers where appropriate.
Target rollback time From the decision to reaching the safe state.
Maximum tolerable time (Enterprise) Time beyond which the impact is considered unacceptable for the business.
Who authorises returning to the rolled-back version A role different from the one that executed the rollback when there was an incident.

08Process continuity and outputs already produced

Field Content Guidance
Alternative process How the service continues to be provided without the system or in degraded mode.
Capacity available for the alternative process People and hours required; if the released capacity has been reallocated (P20), how it is recovered.
Review of outputs produced during the failure Criterion for identifying and reviewing affected decisions or actions.
Communication to affected persons (Enterprise) When and how, coordinated with P26.

09Plan review

Field Content Guidance
Review after relevant changes The plan is reviewed with each relevant change recorded in P27.
Frequency of retesting (Enterprise) As set by the company; it should be repeated after changes of model, autonomy or supplier.

10Rollback test record

One block per test performed.

Field Content Guidance
Test date DD-MM-AAAA. It must be before G5 is requested.
Environment Controlled production · Equivalent pre-production. Justify the equivalence if it is not production.
Scenario and simulated trigger For example, D-01.
Rollback option tested From block 5.
Participants Roles; whoever would be on call in a real case should take part.
Measured time From the decision to the safe state.
Target time From block 7.
Result Passed · Passed with observations · Failed.
Issues during the test Steps that failed or were not documented.
Resulting actions What is corrected, owner and date.
Evidence Linked logs, screenshots or minutes.
Verified by Role external to the team that builds.

Example (illustrative example): test in equivalent pre-production, trigger D-01, rollback to mode A1; target time 30 minutes, measured time 42 minutes; result Passed with observations because notifying the overseers depended on one person without a deputy; action: appoint a deputy and repeat step 3 before G5.


11Quality criteria

Formal G4 and G5 criteria in document 21; checklists LV-G4 and LV-G5 in document 22.

# Check Status (Met · Not met · Not applicable · Pending)
1 Each trigger has a measurable threshold and an associated alert in P25.
2 There is at least one prepared rollback option with an identified safe state.
3 The steps have an owner, time and check.
4 There is a target rollback time and owners with deputies.
5 The alternative process has sufficient capacity.
6 The test has been performed before G5, in a valid environment, and its result is Passed or its observations have been resolved.
7 For systems with variable consumption, activation of the cost-driven degradation cascade has been tested together with the rollback.

12Approval and verification

Function Role Name Date Signature or reference
Author of the plan AI Technical Owner
Owner of the test AI Operations Owner
Verifier AI Office or AI Risk Owner (Lite) · AI Auditor (Enterprise)
Gate decision-maker According to 01 §7.5 (recorded in P29)

Segregation of duties: whoever verifies the test has not taken part in performing it or in designing the plan.


13Version control

Version Date Changes
0.1 16-09-2026 First version of the template.
0.1 18-09-2026 Example cost trigger, option to move to the cost-driven degradation cascade and test criterion (document 52 §10.3).