Template P20 · Adoption and capacity plan

Adoption and capacity plan

Plans how people will adopt the AI system, what training they need and what will be done with the released capacity, and allows it to be monitored with indicators.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used It is prepared in phase 4 (G4 evidence), executed in phase 5, monitored in phase 6 and evaluated in phase 7.
Who completes it AI Product Owner, with the user area and the people function.
Who verifies it AI Office under Lite; AI Auditor under Enterprise.
At which gate it is reviewed G4 (plan), G5 (adoption in the pilot), R6 (monitoring) and G7 (capacity materialised or reallocated).
Lite versus Enterprise Lite may omit the fields marked (Enterprise). Augment and Transform use cases must have an adoption and people plan (01 §3, principle 10).
Tool T20 Adoption and capacity plan.
Relationship P17 Human oversight · P22 Pilot results · P28 Value realisation monitoring · P31 Use case record · documents 23 (Adoption and change) and 50 (People and organisation).

Rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
Use case name
Ambition level Optimise · Augment · Transform.
Intensity Lite · Enterprise.
User area or areas
Document version
Author Role and name.
Date DD-MM-AAAA.
Document status Draft · Submitted for verification · Verified · Approved · Superseded.

03Affected people and change in their work

Change in work: No change · Automated tasks · New tasks · Change of role · Change of organisational position.

Group No. of people Change in work Description of the change Expected impact (Low · Medium · High) Contact person
Claims handlers (illustrative example) 40 Automated tasks and new tasks They no longer classify and draft the first response; they review proposals and handle complex cases Medium Head of claims
Field Content Guidance
Information to employee representatives Yes · No · Not applicable. Date, form and reference to P46. Mandatory in the same way in Lite and Enterprise where applicable (23 §13.2). Where the system affects working conditions, check with employment law advisers the applicable information and consultation obligations (within the scope of the EU AI Act and national employment legislation).
Organisational risks identified Reference to the ORG category risks in P12.

04Adoption targets

Indicator Definition Baseline Target Time frame Source
Effective use People who use the system at least once a week ÷ expected people
Process coverage Cases handled with the system ÷ total cases
Human override rate Proposals rejected or corrected ÷ reviewed P25
User satisfaction (Enterprise) Pulse survey with a declared scale (P44)

05Training and AI literacy

Group Content Format Hours per person Planned date Evidence of completion
Designated overseers (P17) Capabilities and limitations of the system; risk of over-reliance; how to correct, override and interrupt In person with practical cases Attendance record and test
Users Use, limits and what must not be entered into the system
Managers and supervisors Indicators, aggregate oversight and escalation

06Communication

Message Audience Channel Date Owner
What the system is, what it is for and what does not change (illustrative example) User area Team meeting and internal note Two weeks before the pilot AI Product Owner

07Released capacity and its destination

Planned destination (50 §6.4): PER-D1 Materialise as lower actual cost · PER-D2 Reassign to a defined activity · PER-D3 Absorb growth · PER-D4 Reinvest in quality, service or compliance · PER-D5 No decision. Status of the estimate: Validated · Declared · Estimated.

Group or activity Hours released per period Formula Status Planned destination Destination activity or cost item that is reduced Decision owner Planned date
Claims handlers (illustrative example) 1,100 h/month 5,500 cases/month × 12 min saved per case ÷ 60 Estimated Explicit reallocation Proactive service to customers with repeat claims Area management Month 3 after go-live

Notes:


08Monitoring

Period Indicator Actual Target Deviation Action and owner
Field Content Guidance
Monitoring frequency Monthly during the first six months; thereafter, at each R6.
Who receives the monitoring AI Sponsor and, under Enterprise, the AI Committee.
Adoption threshold that triggers a review For example, effective use below target for two periods; links to the stop reason No adoption.

09Quality criteria

Formal G4, G5 and G7 criteria in document 21.

# Check Status (Met · Not met · Not applicable · Pending)
1 All affected groups are identified with their change in work.
2 Adoption targets are measurable, with a baseline, time frame and source.
3 The overseers designated in P17 have planned and recorded training.
4 Released capacity has a formula, status and planned destination, and is not presented as savings.
5 There is monitoring with a threshold that triggers a review.
6 In Augment and Transform, the plan includes the effect on roles and responsibilities.

10Approval and verification

Function Role Name Date Signature or reference
Author AI Product Owner
Commitment on the destination of capacity Management of the user area
Verifier AI Office (Lite) · AI Auditor (Enterprise)
Gate decision-maker According to 01 §7.5 (recorded in P29)

Segregation of duties: the verifier is not part of the team that builds.


11Version control

Version Date Changes
0.1 16-09-2026 First version of the template.