Template P28 · Value realisation tracking

Value realisation tracking

Measures, period by period, the value that the use case in production actually delivers, with the formula and status of each amount, and compares it with the approved hypothesis.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used From go-live (phase 6) until the G7 decision. It is updated at the set frequency (monthly or quarterly) and always before each R6 and before G7.
Who completes it AI Product Owner.
Who validates the amounts Management control or audit for the validated status; the responsible area for declared; the committee, the board or the assessment team for estimated (01 §11).
Who verifies it AI Office at Lite intensity; AI Auditor at Enterprise intensity.
At which gate it is reviewed R6 and G7. It feeds the board dashboard (T17) and the portfolio (document 14).
Lite versus Enterprise Lite may omit the fields marked (Enterprise).
Tool T12 Value realisation tracking.
Relationship P08 Value hypothesis canvas · P09 Baseline · P20 Adoption and capacity plan · P22 Pilot results · P30 Scale or retire decision · P31 Use case record · P62 Benefits realisation plan (curve, owners, enablers; reference for the expected value per period) · documents 40, 42 and 43.

Applicable measurement rules (00 §6):


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
Use case name
Ambition level Optimise · Augment · Transform (confirmed in phase 2).
Intensity Lite · Enterprise.
Go-live date
Tracking frequency Monthly · Quarterly.
Reported period For example, Q3-2026.
Document version
Author Role and name.
Date DD-MM-YYYY.
Document status Draft · Submitted for verification · Verified · Approved · Superseded.

03Reference to the approved hypothesis

It is copied from P08 and P09 and is not modified during tracking. If the hypothesis changes, this is a Pivot or a new decision of the competent body.

Field Content Guidance
Main metric and baseline Value and measurement date (P09).
Target and success threshold
Attribution method Control group · Before and after · Other, justified.
Expected annual value: efficiencies (€)
Expected annual value: return (€)
Expected annual recurring cost (€)
Expected annual net value (€) Efficiencies + return − recurring cost.
Approved investment (€)
Timeframe set in C2
Stop criteria Those approved in phase 2.

04Value by period

One row per item and period. Type: Efficiencies · Return · Recurring cost. Status: Validated · Declared · Estimated.

Period Item Type Formula Units Unit value (€) Amount (€) Status Who validates, declares or estimates Evidence
Q3-2026 (illustrative example) Reduction in outsourcing of document review Efficiencies Documents not outsourced × cost per document 6,000 2.50 15,000 Validated Management control (external supplier invoices) Q3 cost report
Q3-2026 (illustrative example) Attributable retained customers Return Additional customers retained against control group × annual margin per customer ÷ 4 40 180 7,200 Declared Sales management Q3 retention analysis
Q3-2026 (illustrative example) Model consumption, licences and operation Recurring cost Invoices for the period + operating hours × cost per hour — — 9,400 Validated Management control Q3 cost report

05Summary for the period and cumulative

Amounts in euros. The net value in the example is 15,000 + 7,200 − 9,400 = €12,800 for the quarter (illustrative example).

Magnitude Validated Declared Estimated Total for the period Year to date Expected for the same period Variance
Efficiencies
Return
Recurring cost
Net value = efficiencies + return − recurring cost
Indicator Value Guidance
Proportion of validated value (Validated efficiencies + validated return) ÷ (total efficiencies + return).
Annualised net value State the annualisation method and mark it as estimated.
Cumulative investment made (€)
Additional net value per additional euro invested (Enterprise) Only if an extension is proposed: expected additional annual net value ÷ additional investment required. Without investment, hypothesis and timeframe it is not a data point (rule 4).

06Released capacity (separate, not counted)

Destination: Realised as lower cost · Explicitly reassigned · Destination pending.

Period Group or activity Hours released Formula Status of the hours (Validated · Declared · Estimated) Destination Destination activity or reduced budget line Realised amount (€) Evidence
Q3-2026 (illustrative example) Internal case handlers 900 3,600 cases × 15 min saved ÷ 60 Declared Explicitly reassigned Review of high-value contracts, previously not reviewed — (reassignment, not savings) Minutes of the area's management

Only the amount realised as lower actual cost may be carried over to block 4 as an efficiency, and only once. Reassigned capacity is reported here and valued by what the new activity produces, if measured.


07Non-additive value

Type Description Translated into money? (Yes · No) Formula and amount, if translated Status
Risk avoided
Compliance

If it is not translated into money with a formula, it is not counted in block 5 and is marked "not quantified".


08Attribution and allocation (Enterprise)

Shared outcome Other use cases that contribute Declared allocation (%) Allocation criterion Approved by

09Missing data

Magnitude Reason why there is no data Since when Action to obtain it Owner

10Stop criteria and reading by ambition

Stop criterion (phase 2) Threshold Value in the period Triggered? (Yes · No)
Level What will be required at G7 (01 §7.6) Situation in the period
Optimise Realised savings, not merely released capacity.
Augment Sustained performance and reassigned capacity.
Transform Measured return and verified change in the operating model or the offering.

11Conclusion for the period

Field Content Guidance
Assessment In line with the hypothesis · Below, within the approved tolerance · Relevant deviation.
Is it proposed to bring G7 forward? Yes · No. A relevant deviation at R6 brings G7 forward (01 §6.8).
Explanation Causes of the deviation and actions.

12Quality criteria

Formal R6 and G7 criteria in document 21; rules in document 40.

# Check Status (Met · Not met · Not applicable · Pending)
1 Every amount has a formula, type, status and evidence.
2 Validated amounts have been validated by management control or audit.
3 Net value is calculated as efficiencies + return − recurring cost.
4 Released capacity is shown separately and only what has been realised is counted, once.
5 Missing data are shown as missing, not as zero.
6 The reference hypothesis has not been modified without a decision of the competent body.
7 The proportion of validated value is reported.

13Approval and verification

Function Role Name Date Signature or reference
Author AI Product Owner
Validation of amounts Management control
Verifier AI Office (Lite) · AI Auditor (Enterprise)
Review R6 or G7 decision-maker (recorded in P29)

Segregation of duties: whoever declares an amount does not validate it; the verifier is not part of the team that builds.


14Version control

Version Date Changes
0.1 16-09-2026 First version of the template.