SEVEN-G
Template P62 · 19-09-2026

Template P62 · Benefits realisation plan

Benefits realisation plan

Sets out who makes each benefit arrive, when and through which changes, and prepares the 6- and 12-month reviews that check whether it does.

Fernando García VarelaVersion 0.1 (working draft)19-09-2026Draft for review

Why it matters. An approved value hypothesis does not produce value on its own: the benefit appears in a process or budget managed by a business area, and it only arrives if someone with authority carries out the changes that make it possible. Without a plan, expected value is compared with a steady state that nobody has committed to, released capacity is left without a destination and variances are discovered at G7, when there is no room left. The plan turns the hypothesis into commitments with an owner, a date and a curve, and gives R6 and G7 the reference against which to measure.

01Instructions for use

Aspect Guidance
When it is used It is drafted in phase 3, completed in phase 4 and adjusted in phase 5 with the pilot results (43 §4.2). It is the reference for tracking by period (P28) and for the 6- and 12-month reviews (43 §8).
Who completes it The business owner of the benefit, with the AI Product Owner. In cross-unit use cases, each unit completes its block in section 11.
Who verifies it Management control reviews the calculation at G3. The AI Office verifies at G4 (Lite and Enterprise); the AI Auditor verifies at G5 in Enterprise (43 §2.1 and §4.2).
Who decides or approves The business owner signs (G3) and, from G4, the AI Sponsor also signs. The gate is decided by the body in 01 §7.5.
Stage, gate or moment Evidence for G3 (draft) and G4 (complete); in force at G5; reference at R6 and G7.
Tool T12 · Value realisation tracking, with the benefit owner and the review events in T01.
Reference document Document 43 (§3, §4, §6.4, §7, §8, §9); document 40 (§4, §6, §7.2); P28 for tracking by period.
Lite versus Enterprise Lite may omit the fields and blocks marked (Enterprise). Owners, realisation curve, enabling changes, materialisation, indicators and reviews are mandatory in both.

Completion rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
Use case name
Ambition level Optimise · Augment · Transform (P07).
Intensity Lite · Enterprise (P04).
Type of use case Business case · Cross-unit · Enabling platform (40 §7.2). An enabling platform has no benefit lines of its own: its value is attributed to the use cases that use it.
Plan status Draft (G3) · Complete (G4) · In force (G5) · Reviewed (R6, 6 or 12 months) · Superseded.
Document version
Author Role and name.
Date DD-MM-AAAA.

03Reference to the approved hypothesis

Copied from P08 and P09. It is not modified in this plan.

Field Content Guidance
Date and body of approval at G2 and revision at G3 Reference from P29.
Main metric, baseline and measurement date P09.
Approved attribution method and maximum status it allows 40 §7.1.
Expected annual steady-state value: efficiencies and return (€) Separately.
Expected annual recurring cost (€) T13 (document 42).
Stop criteria Those approved at G2.

04Benefit owners

Role Name, position and area What they sign or do in this plan Guidance
Business owner of the benefit Signs the plan; carries out the enabling changes and the materialisation; declares realised value each period. With authority over the budget or process where the benefit arises (43 §3.3). May not validate their own value or be the AI Technical Owner.
Validator Validates realised value; sets unit values and hourly costs. A person from management control, independent of the area and of the build.
AI Sponsor Answers for the value before the governing bodies and resolves conflicts between areas.
AI Product Owner Keeps T12 up to date and prepares the reviews.
Field Content Guidance
Benefit shared between several areas Yes · No. If Yes, one owner per area and the allocation declared.
Change of owner Date and signature of the new owner within one tracking period at most (43 §3.3).
Incorporation of validated efficiencies into the area's budget Financial year and agreement with management control.

05Benefit lines

One row per line. Type: Efficiency · Return. Status of the expected value: Estimated · Declared.

No. Description Type Formula (F1) Unit value and who sets it Annual steady-state value (€) Status Area and owner
B01 (illustrative example) Reduction in outsourcing of document review Efficiency Documents not outsourced × cost per document €2.50 · management control 300,000 Declared Operations · Chief Operating Officer
B01
B02

06Realisation curve

Expected value per period for each line. Periods are monthly in Enterprise and quarterly in Lite (43 §5.1).

Line P1 P2 P3 P4 P5 P6 P7 P8 Steady-state date
B01 (illustrative example, quarters) €18,750 (25%) €37,500 (50%) €56,250 (75%) €75,000 (100%) €75,000 €75,000 €75,000 €75,000 P4
Field Content Guidance
Adoption assumption that explains the ramp-up Link to the adoption plan (P20).
Applicable realisation tolerances Those set at C2 for IND-VAL-14 (indicative in 43 §9.1: ≥ 90% within tolerance; 70–90% moderate variance; < 70% significant variance).

07Enabling changes

Changes to processes, roles, policies, systems or contracts without which the benefit will not arrive.

No. Change Type Line affected Owner Committed date Evidence that it has been made Status
H01 (illustrative example) Do not renew the external document review contract on expiry Contract B01 Chief Operating Officer 31-03-2027 Notice of non-renewal Pending
H01 Process · Role · Policy · System · Contract Pending · In progress · Done · Overdue

08Materialisation plan for released capacity

Mandatory before G5 in Optimise and before G7 in Augment (43 §7.3). Each hour has a single destination.

Group or activity Net hours released per year (F4) Lever (43 §7.2) Hours Date Expected evidence Record
(illustrative example) Case handlers 5,000 Reduction in outsourcing 2,000 31-03-2027 Contract not renewed Materialised efficiency
(illustrative example) Case handlers Reassignment to quality review 1,000 30-06-2027 Activity and hours in T20 Reassigned capacity
(illustrative example) Case handlers No destination 2,000 — — Does not add; reported

Levers: reduction in outsourcing · elimination of overtime or temporary reinforcements · budgeted vacancies not filled · absorption of budgeted growth · reassignment to a new activity. Materialisation that affects people is planned with the people function and the adoption plan (document 23 and document 50). This template does not constitute legal advice.


09Leading and outcome indicators

Indicator Type Code (document 41) Formula Target per period Source Owner
(illustrative example) Documents processed with the system ÷ documents received Leading (use) ADO family 40% in P1; 85% in P4 System log AI Product Owner
(illustrative example) Documents outsourced in the period Outcome Formula of B01 According to the curve Supplier invoices Validator
Leading (use · quality · volume) · Outcome

10Overlaps, risks, dependencies and stop criteria

Field Content Guidance
Use cases or programmes sharing a process, population or metric Including programmes without AI (43 §6.1).
Allocation method and proposed key Joint measurement · Sequential incremental · Prior agreed allocation (43 §6.2); approved by management control (IND-VAL-18).
Risks to realisation (Enterprise) What could prevent the benefit from arriving, with its number in P12 (T06).
Dependencies (Enterprise) Other use cases, suppliers or projects.
Stop criteria Those from G2, not relaxed. Threshold and period in which they are assessed.

11Cross-unit use cases: realisation by unit

Only if the type of use case is Cross-unit (40 §7.2 and 43 §6.4). A single plan, with one block per unit. Each rung of the ladder only counts if the previous one is met; only materialised value adds to the net value.

Field Content Guidance
Corporate sponsor
Adoption threshold approved at G2 Active ÷ assigned licences, from the platform usage reports (ADO family in document 41). Below it, the unit reviews the roll-out or withdraws licences.
Staggered roll-out to allow measurement Order of units and dates, to apply difference-in-differences; or random allocation of licences.
Shared cost without a unit (€/year) Adoption office, ongoing training, permission review.
Unit Business owner Roll-out 1 · Annual cost (€) 2 · Adoption: active / assigned 3 · Declared released capacity (hours/month) 4 · Materialisation lever 4 · Materialised value (€/year) and status
(illustrative example) Finance Chief Financial Officer In use 324,000 792 / 900 (88%) 7,200 Reduction in outsourcing 540,000 · Validated
(illustrative example) Sales Sales Director In use 432,000 624 / 1,200 (52%) 5,100 No lever — (below the threshold)
Pilot · In use · Retired

Declared released capacity is never validated and never adds (rung 3). What a unit's own use case already claims on the same process is not counted again.


12Review calendar

Review Date Coincides with R6 (Yes · No) Who prepares it Who approves it
6-month review AI Office with the AI Product Owner AI Sponsor (Lite) · AI Committee (Enterprise)
12-month review AI Office with the AI Product Owner AI Sponsor (Lite) · AI Committee (Enterprise)
Intermediate R6 (Enterprise) Yes AI Product Owner and AI Operations Owner AI Committee

Each review is the first period close after 6 or 12 months from G5 and replaces the R6 of that period if it includes its checks (43 §8.1).


136- and 12-month review report

Completed at each review and recorded in T01 as an event, linked in T12 (43 §8.3).

Question (43 §8.2) At 6 months At 12 months Data and source
Is it used as expected? Usage rate and active users against the plan Stable use and consolidated adoption
Does it work with the approved quality? OPE indicators against G5 thresholds Stability, drift and incidents over the year
Is the value arriving? Cumulative realisation (F10) and trend Annual realised value; validated proportion (F6); annual net value (F2) and validated net value (F2v)
Is capacity being materialised? Progress of the plan in section 8 Materialisation and reassignment rates (F5)
Does it cost what was expected? Actual recurring cost against the G3 estimate Actual annual cost; cost per unit of output against the baseline
Are there new overlaps? Portfolio review Review of the portfolio and of programmes without AI
Is the ambition the declared one? — Five classification questions with the actual evidence (00 §5.2)
Field Content Guidance
Realisation situation Within tolerance · Moderate variance · Significant variance · Stop criterion reached (43 §9.1).
Causes of the variance Adoption · Process not redesigned · Quality · Volume · Materialisation not carried out · Cost · Attribution · Wrong hypothesis (43 §9.2).
Decision Continue the plan · Corrective actions · Bring G7 forward (only at 12 months or with a significant variance).
Lessons for the portfolio register
# Action Owner Date Status
1 Open · Met · Expired

The target is not lowered to close a variance (43 §9.3). An action imposed at a gate or at R6 that expires without being met is treated as an expired condition.


14Quality criteria

Formal criteria in document 21 (G2.06, G3.05, G4.11, G5.10, G5.21, R6.02, R6.14, G7.01 and G7.05); rules in documents 40 and 43.

# Check Status
1 The business owner has authority over the process or budget and is identified in T01 before G3. Met · Not met · Not applicable · Pending
2 Each line separates efficiency and return, has formula F1 and is consistent with the approved hypothesis.
3 The curve reflects the adoption ramp-up and has a steady-state date.
4 Each enabling change has an owner and a date.
5 The materialisation plan assigns a single destination to each hour and does not add capacity without a destination.
6 There are leading and outcome indicators with a source.
7 Overlaps are identified and the allocation key proposed.
8 In cross-unit use cases, each unit has an owner, an adoption threshold and the full ladder.
9 The 6- and 12-month reviews are dated and, once held, their report is recorded with actions.

15Approval and verification

Function SEVEN-G role Name and position Date Signature or reference
Signs the plan (G3, G4, G5) Business owner of the benefit
Signs the plan (G4, G5) AI Sponsor
Reviews the calculation Management control
Verifies AI Office (G4; Lite) · AI Auditor (G5; Enterprise)
Approves the review report AI Sponsor (Lite) · AI Committee (Enterprise)

Segregation of duties: whoever signs the plan and declares the value does not validate it; the validator and the verifier are not part of the team that builds.


16Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 19-09-2026 First version. Covers the content of the plan in 43 §4.1, realisation by unit for cross-unit use cases (40 §7.2 and 43 §6.4) and the 6- and 12-month review report (43 §8).