Legal notice and disclaimer. SEVEN-G is a reference methodological framework provided "as is" and for information purposes only. It does not constitute legal, regulatory, financial or professional advice, nor does it guarantee compliance with any law or standard. References to general regulation (such as the EU AI Act, the GDPR, DORA or NIS2), to technical standards and to regulation specific to each sector or jurisdiction may be incomplete, may not apply to a particular case or may become out of date as a result of regulatory changes, interpretations or supervisory positions after their consultation date. Each organisation that uses SEVEN-G is solely responsible for identifying the regulation that applies to it, verifying that it is current and certifying its own regulatory compliance, with the appropriate qualified advice. This methodology is a generic, free aid shared with the community so that nobody has to start from scratch; each person or organisation can and should adapt it to its own use. It must not be inferred that its legally sensitive parts have been reviewed by legal counsel: those reviews, for each company or sector, are the ultimate responsibility of the company, consultant or organisation that uses it. Although every effort is made to keep it up to date, some regulation may have changed without being reflected here. To the fullest extent permitted by law, the author accepts no responsibility whatsoever for the effects of its application in any organisation or for its full applicability. The methodology does not grant certification of any kind. The author accepts no liability for any use made of this content or for any decisions taken on the basis of it. The data, figures, companies and cases in the examples are fictitious or illustrative.
01Purpose and scope
This document establishes the SEVEN-G indicator catalogue. Each indicator has a persistent code, a definition, a formula, a unit, a data source, a frequency, an owner, the level at which it is used, its application in the cycle and, where appropriate, an indicative threshold.
The catalogue:
Applies the measurement rules in document 40 and uses its official formulas (F1–F10).
Includes the funnel metrics in document 03 §3.5 and the eight transformation index signals in document 00 §5.3.
Feeds the use case register (T01), value tracking (T12), the cost calculator (T13), the transformation index (T14), the maturity diagnosis (T15) and the board dashboard (T17).
Marks a recommended minimum set for Lite intensity.
No company needs all the indicators. They are selected in C2 according to the AI thesis, the portfolio and the intensity, and the selection is recorded.
02Rules of use
Persistent code. The code IND-<FAMILIA>-NN is not reused. A retired indicator is marked as retired and keeps its code.
Every formula is explicit. If an indicator cannot be calculated with its formula, it is shown as "no data" (rule 8 in document 40). It is not replaced by an approximation without saying so.
Thresholds are set by the company. "To be set" means that the company approves it in C2 (document 13). The only thresholds shown as a value are those derived from rules of the framework itself (for example, zero systems in production without a gate) or the indicative time limits in 03 §3.6. None is a market benchmark.
Value indicators inherit the status. Every indicator calculated on amounts shows its validated proportion or is calculated in two versions: total and validated only.
Segmentation. All portfolio indicators can be segmented by the tags of the controlled taxonomy (03 §3.3): sphere, ambition, intensity, technology, exposure, regulatory classification, area and supplier.
Medians rather than means for times, with the 80th percentile.
Reading in pairs. Speed or automation indicators are read together with the quality and risk indicators that balance them (for example, containment with ungrounded responses and complaints).
New indicators. They are added using the record in section 5 and approved by the AI Office with management control clearance.
03Legend
Column
Values
Freq. (frequency)
M monthly · Q quarterly · H half-yearly · A annual · G at each gate or event
Resp. (owner)
SP sponsor · BO business owner of the benefit · PO AI Product Owner · TO technical owner · OO operations owner · RO risk owner · AUD AI Auditor · AIO AI Office · MC management control · AIC AI Committee · ISEC information security · DO data owner · PPL people function · BS board secretariat
Level
I use case · P portfolio · Co company · B board
Application
Phases F0–F7, gatesG0–G7, stages C1–C5, spheres E01–E09 and ambition Opt (Optimise), Aug (Augment), Tra (Transform). "All" if it applies generally.
Source
Tool from document 03 (T01–T22) and, where one exists, board dashboard (T17) field in backticks.
Lite
● part of the recommended minimum set for Lite (section 19).
To be defined by the company
The source document of the indicator does not set that item; the company approves it in C2 when it selects the indicator (section 21).
04Families
Code
Family
Indicators
VAL
Value
18
COS
Cost
14
EMB
Funnel
13
AGI
Agility
6
RIE
Risk and compliance
17
OPE
Operations and model quality
29
ADO
Adoption and people
15
DAT
Data and knowledge
20
CLI
Customer and product
9
TRA
Transformation
9
MAD
Maturity
4
CON
Board
5
PRO
Processes and decision-making
6
Total
165
05Indicator record
Each indicator in the catalogue, and any in-house indicator added by the company, is documented with this record. The selection of indicators approved by the company in C2, with its target, threshold, frequency, owner and source, is recorded in P35 §13.
Field
Content
Code
IND-<FAMILIA>-NN
Name and definition
What it measures, in one understandable sentence.
Formula
Numerator, denominator, exclusions and the applicable official formula from document 40.
Unit
€, %, days, no., points, index.
Source
Tool, field and source system.
Frequency
Frequency of calculation and review.
Owner
Who calculates it and who is accountable for the result.
Level
Use case, portfolio, company or board.
Application
Phase, stage, sphere and ambition.
Threshold
Value approved in C2 or "to be set"; traffic-light reading where appropriate.
Counterpart indicator
Indicator with which it must be read.
Status
Active, in testing or retired; date of registration.
06Value · VAL
Code
Indicator and definition
Formula
Unit
Source
Freq.
Resp.
Level
Application
Indicative threshold
Lite
IND-VAL-01
Annual net value. Value contributed by the use case or the portfolio after deducting its recurring cost.
Governance hours per use case. Hours declared to prepare and verify the evidence, meet and record a use case's gate decisions. It measures the cost of the method itself; it is not allocated to the cost of the case (42 §4).
Σ hours declared in the gate decisions (decisiones_gate[].horas_gobierno)
According to the G5 reference (document 52 §4.2.6)
IND-OPE-25
Unequal responses in counterfactual pairs. Bias in responses: pairs of cases identical except for a protected attribute with a materially different outcome.
Pairs with a material difference ÷ pairs evaluated
Employee-promoted use cases. Weight of employee proposals in the register and their progression through G1.
Registered use cases originating from employee proposals ÷ registered use cases; and employee-originated use cases that pass G1 ÷ employee-originated use cases registered
Capture coverage. Dependent critical domains with captured and validated content.
Dependent critical domains with captured and validated content ÷ dependent critical domains
%
Capture plan
H
To be defined by the company
Co
C4, C5 · E06
As per plan
IND-DAT-18
Queries without a relevant source. Queries for which no relevant document is retrieved.
Queries with no relevant document retrieved ÷ evaluated queries
%
Continuous evaluation
M
To be defined by the company
I
F6 · E06 · generative AI
Decreasing trend
IND-DAT-19
Useful resolution. Queries resolved according to the user and confirmed by sampling.
Queries marked as resolved by the user and confirmed by sampling ÷ total queries
%
Assistant telemetry
To be defined by the company
To be defined by the company
I
F6 · E06 · generative AI
To be defined by the company
IND-DAT-20
Time to autonomy. Days until a new joiner reaches autonomy in their role.
Median days until a new joiner reaches autonomy in their role, compared with the baseline
days
People function
To be defined by the company
To be defined by the company
I · Co
F6–F7 · E06
To be defined by the company
14Customer and product · CLI
Code
Indicator and definition
Formula
Unit
Source
Freq.
Resp.
Level
Application
Indicative threshold
Lite
IND-CLI-01
Incremental satisfaction. Difference in satisfaction in interactions with AI.
Satisfaction with AI − satisfaction of the control group or baseline
points
Surveys
Q
BO
I
F5–F7 · E01
≥ 0 (no deterioration)
IND-CLI-02
Resolution time. Change in the time taken to resolve the customer's request.
Median with AI − reference median
hours
Customer service system
M
PO
I
F6 · E01, E04
To be set
IND-CLI-03
AI-related complaints. Complaints attributed to responses or decisions of the system.
Attributed complaints ÷ interactions × 10,000
per 10,000
Complaints management
M
BO
I · B
F6 · direct exposure
To be set
IND-CLI-04
Incremental conversion. Difference in conversion against the control group.
Conversion rate with AI − control group rate
percentage points
A/B test · sales system
M
BO
I
F5–F7 · E01, E02 · Aug, Tra
G2 hypothesis
IND-CLI-05
Incremental retention. Difference in retention against the control group.
Retention rate with AI − control group rate
percentage points
Customer system
Q
BO
I
F5–F7 · E01
G2 hypothesis
IND-CLI-06
Use of AI features. Active users of the product who use AI features.
Active users who use AI features in the period ÷ active users of the product
%
Product telemetry
To be defined by the company
To be defined by the company
I
F6–F7 · E02
To be defined by the company
IND-CLI-07
Reduction in time to launch. Reduction in the median days from idea to launch compared with the baseline.
(Median days from idea to launch in the baseline − current median) ÷ baseline median
%
Product management
To be defined by the company
To be defined by the company
I · Co
F6–F7 · E02 · Aug, Tra
To be defined by the company
IND-CLI-08
Margin of the AI-enabled offering. Margin of the AI-enabled offering after its direct costs, including AI cost.
(Revenue from the AI-enabled offering − direct costs, including allocated AI cost) ÷ revenue from the AI-enabled offering
%
Management control
To be defined by the company
To be defined by the company
I · Co
F6–F7 · E02 · Aug, Tra
To be defined by the company
IND-CLI-09
Defects contained before launch. Defects detected in testing out of all defects.
Defects detected in testing ÷ (defects detected in testing + defects detected in production)
%
Quality management
To be defined by the company
To be defined by the company
I
F5–F7 · E02
To be defined by the company
15Transformation · TRA
The eight signals in document 00 §5.3. The 0–3 score for each signal, its initial thresholds "to be calibrated" and the determination of the profile are defined in document 12.
Code
Indicator and definition
Formula
Unit
Source
Freq.
Resp.
Level
Application
Indicative threshold
Lite
IND-TRA-01
Signal 1 · Investment mix. Weight of Augment and Transform in AI spending.
(Recurring cost + investment) of Aug and Tra ÷ total (recurring cost + investment)
Outcome indicators for spheres 04 (Operations) and 07 (Decision) taken from document 10. They are read together with IND-OPE-05, IND-TRA-04 and IND-ADO-04.
Code
Indicator and definition
Formula
Unit
Source
Freq.
Resp.
Level
Application
Indicative threshold
Lite
IND-PRO-01
Cycle time reduction. Reduction in the process cycle time compared with the baseline.
(Baseline cycle time − current cycle time) ÷ baseline cycle time
%
Process systems
To be defined by the company
To be defined by the company
I · P
F5–F7 · E04 · Opt, Aug
To be defined by the company
IND-PRO-02
Change in unit cost. Change in the cost per unit processed compared with the baseline.
(Total process cost ÷ units processed) − baseline unit cost
€ per unit
Management control
To be defined by the company
To be defined by the company
I · P
F5–F7 · E04 · Opt
To be defined by the company
IND-PRO-03
Error or rework rate. Units with errors or rework, compared with the baseline.
Units with errors or rework ÷ units processed, compared with the baseline
%
Quality management
To be defined by the company
To be defined by the company
I
F5–F7 · E04
To be defined by the company
IND-PRO-04
Decisions with assigned autonomy. Decision types involving AI that have an assigned and documented autonomy level.
Decision types in which AI is involved with an assigned and documented A0–A3 level ÷ decision types in which AI is involved
Decision latency. Time from when the information is available until the decision is executed.
Median time from when the information is available until the decision is executed, compared with the baseline
hours or days
Process logs
To be defined by the company
To be defined by the company
I
F5–F7 · E07
To be defined by the company
19Recommended minimum set for Lite
A company that applies SEVEN-G with Lite intensity should start with these 26 indicators. They cover the ten measurement rules, control of the funnel, the risks that give rise to critical nonconformities and the first two transformation signals.
Family
Indicators
Question they answer
Value
IND-VAL-01, 05, 08, 10, 14, 15
Does it deliver net value, how much is validated, is it realised, where should we invest and which use cases are not sustainable?
Cost
IND-COS-01, 05, 06, 11
How much does each use case and AI as a whole cost, and is consumption under control?
Funnel
IND-EMB-02, 08
Are there stuck use cases or unmet conditions?
Agility
IND-AGI-01, 02
How long do we take to approve and to move into production?
Risk and compliance
IND-RIE-01, 02, 07, 09, 10
Do we know what AI we have, is all of it approved, what incidents are there, is it reviewed and is there unauthorised use?
Operations
IND-OPE-01
Do the systems perform within what was approved?
Adoption and people
IND-ADO-03, 05
Is it used and is the workforce trained?
Transformation
IND-TRA-01, 02
Do we invest and obtain value beyond efficiency?
Maturity
IND-MAD-01
Where are we?
Board
IND-CON-02
Are the board's recommendations being implemented?
When a use case moves to Enterprise, at least risk indicators IND-RIE-03, 04 and 11 are added and, depending on the technology, those in sections 11.2 to 11.4.
20Selection for the board dashboard
The board dashboard (T17) does not show the entire catalogue. The selection is approved in C2 and should include:
Value: IND-VAL-01, 04, 05, 06, 07 and 15, with the validated proportion alongside each total (document 40 §11).
Cost: IND-COS-11 and, per use case, IND-COS-01.
Agility: IND-AGI-01, 02 and 04, segmented by risk and ambition.
Risk: IND-RIE-02, 03, 07, 09 and 10.
Agents: IND-OPE-11 to 14 when there are A2 or A3 agents.
Adoption: IND-ADO-01 and 05.
Transformation: IND-TRA-01 to 09 once a year.
Board: IND-CON-01 to 03.
21Mapping of provisional codes
Documents 10, 50, 51 and 52 use provisional indicator codes. This table maps them to the IND- code in the catalogue. "Complementary" indicates that the catalogue indicator measures the opposite (for example, overdue versus on time); "related" indicates that it covers it in part; "added" indicates that the indicator, which had no equivalent, has been added to the catalogue with the name, formula, source, frequency and threshold of its source document, and with "To be defined by the company" for the items that document does not set. When two provisional codes measure the same thing (IE03.06 and PER-14, IE05.05 and DAT-10, IE06.02 and CNC-06), they share a code. The provisional knowledge codes in document 51 use the CNC- prefix so that they are not confused with the IND-CON family (board).
First version. Catalogue of 156 indicators in 13 families with code, formula, unit, source, frequency, owner, level, application and indicative threshold; Lite minimum set of 26 indicators; indicative selection for the board dashboard. Consistency adjustments with 01 (segregation of duties in Lite, R6 outcomes, agent criterion) and with 34 and 37; mapping of provisional codes from documents 10, 50, 51 and 52 (section 21). The 47 provisional indicators that had no equivalent added to the catalogue (families EMB, RIE, OPE, ADO, DAT and CLI, and new family PRO · Processes and decision-making, section 18); provisional knowledge prefix in document 51 renamed from CON- to CNC-.
0.1
18-09-2026
Three new operations indicators (159 in total): IND-OPE-24 queries outside the validated scope (usage drift), IND-OPE-25 unequal responses in counterfactual pairs (bias in generative AI) and IND-OPE-26 cost-driven degraded mode; correspondence with OPE-18 to OPE-20 in document 52.
0.2
01-10-2026
Three indicators of the cost of governance itself (162 in total): IND-COS-12 governance hours per use case, IND-COS-13 cost of governance over investment with targets by intensity and IND-COS-14 referenced evidence. The time of each gate is already measured by IND-AGI-04.
0.3
19-10-2026
Three operations indicators (165 in total): IND-OPE-27 guardrail effectiveness, IND-OPE-28 end-to-end trace coverage and IND-OPE-29 recovery from model provider outage; correspondence with OPE-21 to OPE-23 in document 52 (D159).