SEVEN-G
Document 40 · 16-11-2026

Document 40 · Value measurement rules

Value measurement rules

How the value of AI is measured, validated and presented so that it withstands an audit

Fernando García VarelaVersion 0.5 (working draft)16-11-2026Draft for review
10measurement rules
3amount statuses
5attribution methods
1single economic criterion based on net benefit

01Purpose and scope

This document develops the ten SEVEN-G value measurement rules (document 00, section 6) and sets out the definitions, formulas and procedures that all use cases, the portfolio and reports to the board must apply.

It applies to every use case recorded in the use case register (T01), in all phases, and to every value figure presented to the AI Committee or the board. The indicators derived from these rules are in document 41; the calculation of costs, in document 42; and the benefits realisation process, in document 43.

The figures in the examples are fictitious and illustrative. They are not market benchmarks.


02Measurement principles

Principle What it means
Incrementality Only the effect that would not have occurred without the use case counts. What would have happened anyway (trend, seasonality, other use cases) is not value of the use case.
Annual basis Efficiencies, return and recurring cost are expressed in euros per year. The build investment and the initial adoption investment, which are incurred once, are presented separately.
Expected versus realised Expected value is the hypothesis (phases 2 and 3). Realised value is the value measured over a closed period (phases 5, 6 and 7). They are different magnitudes and are never added together.
Asymmetric prudence Costs are charged in full from day one, regardless of their status. Value is only considered validated when it is validated by whoever is responsible for doing so.
Segregation of duties Whoever benefits from the figure does not validate it. The area declares; management control or audit validate (principle 7 in 01 §3).
Traceability Every figure can be reconstructed from its formula, its sources and its period, and is linked to the evidence in T01.

03The ten measurement rules

The numbering is that of document 00, section 6, and is not modified.

3.1 Rule 1 · Every amount has a formula and is incremental

Every amount has a formula (units × unit value) and is incremental against a baseline or a control group.

Rationale An amount without a formula cannot be reviewed or updated, and a non-incremental amount attributes to AI what would have happened anyway.
How it is applied Each value line is broken down into a measurable physical magnitude (hours, cases, errors, customers, units sold) and a unit value with a source (fully loaded hourly cost, cost per error, margin per unit). The physical magnitude is the difference against the baseline measured in phase 2 or against the control group (formula F1, section 6).
Correct example (illustrative) Baseline: 9,000 instances of rework per year. Control group over the same period: 8,800 (downward trend unrelated to AI). With AI: 5,800. Incremental rework avoided: 8,800 − 5,800 = 3,000. Unit cost of an instance of rework according to cost accounting: €42. Efficiency = 3,000 × €42 = €126,000/year.
Incorrect example "AI saves 30% of the team's time, around €200,000 a year." There are no units, no baseline, no comparison and no source for the unit value.
How it is verified The formula exists in T01; the units come from an identified system; the baseline was measured before G2 (01 §6.4); the unit value has a source and a date; the attribution method applied is the one approved at G2.

3.2 Rule 2 · Every amount has a status and the board sees the validated proportion

Every amount has a status: validated, declared or estimated. Reports to the board always show the proportion of validated value.

Rationale An aggregate figure that mixes verified value with declared value conveys a certainty that it does not have. The board needs to know how much of what it sees has been verified.
How it is applied Each amount of realised value carries one of the three statuses in section 4. Every value total presented to the committee or the board shows the validated proportion alongside it (formula F6). An amount without a status is treated as estimated and generates an alert.
Correct example (illustrative) Gross realised value for the year: €540,000, of which €210,000 is validated, €250,000 declared and €80,000 estimated. Validated proportion: 210,000 ÷ 540,000 = 38.9%.
Incorrect example "Value delivered by AI in the year: €540,000", with no breakdown by status.
How it is verified No amount in T01 or T12 has an empty status; all totals in the board pack show the validated proportion; validated amounts have a validator, a date and evidence.

3.3 Rule 3 · Released capacity is not counted until it is materialised or reassigned

Released capacity is not counted as savings until it is materialised (lower actual cost) or explicitly reassigned. It is reported separately.

Rationale Releasing hours does not in itself reduce any cost. If people remain on the payroll doing the same work with more slack, the income statement does not change. Adding up released hours as savings is the main source of inflated figures in efficiency use cases.
How it is applied Net released hours are valued (formula F4) and reported on a separate line. They only become an efficiency when there is a verifiable actual cost reduction (outsourcing not renewed, overtime eliminated, budgeted vacancy not filled) or when they are explicitly reassigned to an identified activity, with an owner and a date. Capacity reassigned to an activity that avoids a planned and budgeted cost counts as an efficiency; capacity reassigned to a new activity is reported as reassigned capacity, and its value is only accounted for through the measured result of that activity (section 5.3).
Correct example (illustrative) 20,000 cases per year × 15 net minutes saved = 5,000 net released hours; at a fully loaded hourly cost of €32 = €160,000 of released capacity. Destination: 2,000 hours cover outsourcing that is not renewed (contract reduction: €76,000, materialised efficiency); 1,000 hours are reassigned to quality review (€32,000, reassigned capacity, reported separately); 2,000 hours have no destination (€64,000, unmaterialised released capacity, reported separately). Materialisation rate: 2,000 ÷ 5,000 = 40%.
Incorrect example "Savings of €160,000 a year from the released hours."
How it is verified Materialised efficiency is reflected in the accounts (lower expenditure in the cost centre) or there is evidence of the budgeted avoided cost; unmaterialised capacity is not included in net value; a materialisation plan exists before G5 in Optimise (01 §7.6).

3.4 Rule 4 · A potential without investment, hypothesis and timeframe is not a data point

A potential without its additional investment, its hypothesis and its timeframe is not a data point.

Rationale Potentials without cost or timeframe are promises. When compared with realised values, they distort prioritisation in favour of whoever promises the most.
How it is applied All potential value is recorded with four elements: potential annual net value, additional investment required to achieve it, explicit hypotheses (volume, usage rate, price, expected effect) and timeframe. If any of these is missing, the potential is not shown in reports or used for prioritisation.
Correct example (illustrative) "Potential annual net value of €180,000 by extending the use case to the three remaining regions. Additional investment: €120,000. Hypotheses: usage rate of 70% or more and 45,000 requests per year. Timeframe: 9 months from the new phase 0."
Incorrect example "Potential of €2M if scaled to the whole company."
How it is verified In T01 the potential has all four fields completed; the board pack does not show incomplete potentials; the potential is reviewed at G7 against what has been realised.

3.5 Rule 5 · Each euro is attributed to a single use case

Each euro is attributed to a single use case. When several use cases share an outcome, the allocation is declared.

Rationale When two use cases act on the same process or the same customer, each tends to claim the full effect. The portfolio total then exceeds the actual effect.
How it is applied In phase 2, each use case declares which other use cases it shares a metric, process or population with. The combined effect is measured once and allocated using a declared key (document 43, section 6). The key is approved by management control and recorded in both use cases.
Correct example (illustrative) Two use cases reduce the cost of the same process. Combined effect measured: €400,000. Effects declared separately: €280,000 and €220,000 (total €500,000). Proportional allocation: 400,000 × 280/500 = €224,000 and 400,000 × 220/500 = €176,000. Total: €400,000.
Incorrect example Each use case reports its figure separately and the portfolio shows €500,000.
How it is verified Use cases with a declared overlap have a recorded allocation key; the sum of the allocated amounts does not exceed the combined effect measured; the AI Office reviews overlaps by process and population when consolidating.

3.6 Rule 6 · Efficiencies, return and recurring cost are kept separate

Efficiencies, return and recurring cost are kept separate. Annual net value is the sum of efficiencies and return minus recurring cost.

Rationale Efficiencies and return carry different risks, are validated differently and have a different strategic reading (efficiency versus transformation, document 00 §5). Mixing them, or offsetting costs within efficiencies, makes the portfolio impossible to read.
How it is applied Each use case records three separate blocks and calculates annual net value using formula F2. Recurring cost is the full cost defined in document 42, including allocated shared costs. The build and adoption investment does not form part of annual net value; it is used in the economic criterion in section 8.
Correct example (illustrative) Materialised efficiencies: €76,000. Return: €95,000. Recurring cost: €60,000. Annual net value = 76,000 + 95,000 − 60,000 = €111,000.
Incorrect example "Benefit of €171,000 a year", without deducting the recurring cost; or "net efficiencies of €16,000", deducting the cost within the efficiencies.
How it is verified T01 has all three blocks with separate amounts; the net value is recalculated automatically and matches the value reported; the recurring cost reconciles with T13.

3.7 Rule 7 · Every magnitude is translated into money

Every magnitude is translated into money. Improvements in retention, quality or satisfaction are converted into their economic effect, or it is stated that they could not be quantified.

Rationale Non-monetary indicators cannot be compared with cost or used for prioritisation. But converting them using undeclared assumptions is worse than not converting them at all.
How it is applied Each non-monetary improvement is translated through an explicit chain: incremental physical magnitude × unit economic value with a source. If there is no demonstrable relationship, the amount is recorded as not quantified, with the physical metric and the reason. A non-quantified value is not zero and is not estimated without saying so (rule 8). In T01 it is recorded in no_cuantificado[] with its dimension (image and reputation, competitive positioning, customer experience, sales and distribution network, talent and capabilities, or strategic option, which is the option value of section 5.3), its level from 0 to 3 (no effect, low, medium, high), the physical metric with its baseline, target and current value, and the reason why it is not translated into money. Without a metric it does not count. The level is never translated into euros and never adds to net value.
Correct example (illustrative) 300 incremental customers retained against the control group × €450 average annual margin per customer = €135,000/year of return. Satisfaction improvement of 4 points: not quantified; there is no demonstrated relationship between that metric and purchasing behaviour in the company.
Incorrect example "Satisfaction rises by 4 points, which is equivalent to €1M of brand value", with no formula; or "retention improves by 2 points", with no economic translation and no indication that it has not been quantified.
How it is verified Each non-monetary metric in the hypothesis has an amount with a formula or a not-quantified flag with a reason; unit values have a source; each non-quantified value in T01 has a dimension, level, metric and reason.

Use case sustained by non-quantified value. A use case in production (phases 6 and 7) whose case rests on non-quantified value of medium or high level, with a metric, while its NPV (F7) is negative or is not demonstrated by a realisation plan (document 43 §4.1), is shown as "sustained by non-quantified value". It needs the date of its next R6 recorded in T01 (ciclo.proxima_revision), and the board dashboard warns if it is missing or overdue. This way the board sees which use cases are kept for reasons that are not economic and when they will be reviewed again. In phases 3 to 5 it is not flagged: the option value of Transform is governed by its stages, milestones and gates (section 8.3, point 5).

3.8 Rule 8 · "No data" is not zero

"No data" is not zero. Missing data is shown as missing and is never estimated without saying so.

Rationale A zero hides the absence of measurement and makes an unmeasured use case look like a use case with no value, or an unknown cost look like no cost.
How it is applied Fields with no data are recorded as null and shown as "no data". Totals indicate how many use cases provide no data. If missing data is replaced by an estimate, the estimate carries the estimated status, an author and a formula. A recurring cost with no data prevents the net value from being calculated: the net value is shown as "no data", not as the gross value.
Correct example (illustrative) "Return: no data (the area has not provided the attributed sales for the period). Annual net value: no data. 3 of the 11 use cases in production provide no return data."
Incorrect example "Return: €0"; or a return estimated by the AI Office presented without an estimate flag.
How it is verified T01 distinguishes null from zero; the dashboard shows "no data"; totals report the number of use cases with no data; no estimate lacks a status.

3.9 Rule 9 · Prioritisation uses additional net value per euro

Prioritisation uses additional net value per additional euro invested, not aggregate indicators that hide use cases with negative value.

Rationale The relevant decision is where the next euro yields the most. Aggregate indicators (portfolio ROI, total value) mix excellent use cases with use cases that destroy value, and do not say where to invest.
How it is applied Each proposal for additional investment (new use case, extension, scaling) calculates the additional net value per euro (formula F3). The portfolio is ranked by that indicator, subject to risk, capacity and ambition balance constraints (document 14). Use cases with negative annual net value are always shown individually.
Correct example (illustrative) Use case X: current net value €31,000, potential net value €151,000, additional investment €200,000 → (151,000 − 31,000) ÷ 200,000 = €0.60 of annual net value per euro. Use case Y: additional net value €90,000, additional investment €60,000 → €1.50. Y is prioritised.
Incorrect example "The portfolio has an ROI of 85%; it is proposed to increase investment in all use cases", without showing that one use case has an annual net value of −€40,000.
How it is verified Investment proposals to the committee include F3; use cases with negative net value appear individually in the board pack; C3 decisions record the prioritisation order.

3.10 Rule 10 · Each use case explains what it is and what it is used for

Each use case explains what it is and what it is used for, in language that non-specialists can understand.

Rationale Anyone who does not understand what a use case does cannot judge whether its value is plausible or its risk acceptable. It is the precondition for oversight.
How it is applied Each use case has a one- or two-sentence description that answers: what it does, who uses it, which process or decision it acts on and what role the person plays. It is recorded in the use case record (P31) and in T01. Without a description, the use case is not presented to the board.
Correct example (illustrative) "It proposes the accounting classification and cost centre for each invoice received. A member of the accounts payable team reviews the proposal before it is posted."
Incorrect example "Generative AI solution with retrieval-augmented generation and multi-agent orchestration on a foundation model."
How it is verified The description field in T01 is completed and reviewed by the AI Office; a person from outside the area understands the use case on reading it.

04Amount statuses

4.1 Definition, owners and evidence

Status Who may assign it Minimum evidence requirements Indicative expiry Permitted use
Validated Management control (or the equivalent finance function) or internal or external audit. Never the area that benefits from the figure or the use case team. Complete formula; measured baseline; attribution method approved and applied (section 7); data traceable to source systems or to the accounts; closed period; for efficiencies, reflection in the accounts or evidence of the avoided cost; validator's signature with date; evidence linked in T01. 12 months from the close of the validated period. It expires earlier if there is a material change: model, process, scope, population, price or volume outside the range of the hypothesis. All reports and gates. The only status that evidences "materialised savings" or "measured return" at G7 (01 §7.6).
Declared The area responsible for the benefit (business owner in document 43), with the sponsor's agreement. Formula; source of the units and of the unit value; period; attribution method used; author and date. 6 months without being submitted for validation. After that period it is shown as "declared, pending validation" with an alert. Reports and R6, always identified as such. At G5 and G7 it does not replace validation when the criterion requires validated value.
Estimated The AI Committee, the board or whoever advises them, or an assessment team (for example, the AI Office), when the area does not provide data or when a declared figure is being corroborated. Formula; explicit hypotheses; source of the parameters; author and date; reason for the estimate. 6 months or until the area declares the figure, whichever occurs first. Reports, always identified as such. It does not evidence compliance with any realised value gate criterion.

Supplementary rules:

  1. The status is assigned per amount and per period, not per use case. A use case may have validated efficiency and declared return.
  2. Expected value is not validated. The amounts in the hypothesis (phases 2 and 3) are estimated or declared; management control may review their calculation, but the validated status only applies to value realised over a closed period.
  3. Cost is not discounted by status. Recurring cost is charged in full even if it has not been validated; if it is unknown, the net value is "no data" (rule 8).
  4. Downgrading, not deletion. A validated amount that expires becomes declared until it is revalidated; a declared amount rejected by the validator is corrected or becomes estimated, with a reason. Every status change is an event in T01.
  5. Recurring value is revalidated every year. Validating one year does not validate the following years.
  6. The expiry periods are indicative and are set by the company in C2 (document 13). They may not be extended for a specific use case.
Status cycle of an amount
The status improves with evidence and is downgraded over time or with material changes
flowchart LR
  EST["Estimated · committee, board or assessor"] -->|"The area provides data with a formula"| DEC["Declared · responsible area"]
  DEC -->|"Management control or audit verifies"| VAL["Validated · closed period"]
  DEC -->|"Rejected by the validator"| EST
  VAL -->|"Expires or material change"| DEC
  DEC -->|"Not validated in time"| ALR["Declared, pending validation · alert"]
  ALR -->|"Subsequent validation"| VAL
  classDef ok fill:#d9ebe0,stroke:#0d7680,color:#1a1817
  classDef med fill:#f2dfce,stroke:#0f5499,color:#1a1817
  classDef ko fill:#f3d3da,stroke:#990f3d,color:#1a1817
  class VAL ok
  class DEC,EST med
  class ALR ko
Source: SEVEN-G

4.2 What the validator checks

Test Question Typical evidence
Occurrence Did the effect occur during the period? Extract from the source system with a date and a reproducible query.
Incrementality Is it compared with the approved baseline or control group? Attribution method report with data from both groups.
Valuation Is the unit value correct and current? Cost accounting, rates, contracts, margin per product.
Materialisation For efficiencies, is there a lower actual cost or a budgeted avoided cost? General ledger, amended contract, headcount budget.
Exclusivity Is the effect not already attributed to another use case? Overlap register and allocation key.
Cut-off and cost Does the amount correspond to the period, is it not repeated, and is the recurring cost complete? Reconciliation with previous periods in T12 and with T13.

05Types of value

5.1 Additive types

Type What it includes Examples of items Condition for adding
Efficiencies Lower actual cost or budgeted avoided cost. Lower people or outsourcing cost (materialised); tools or licences retired; losses avoided (fraud, shrinkage, bad debts); other operating costs avoided; errors and penalties avoided. Incremental, with a formula and, to be validated, reflected in the accounts or with evidence of the avoided cost.
Return More revenue or more margin. New sales; cross-selling; retention (margin from incremental customers retained); price and margin; recovered collections; new services. Incremental, valued at margin where the company can calculate it; if revenue is used, this is stated. Margin and revenue are never mixed in the same total.
Recurring cost Full annual cost of operating the use case. The nine categories in document 42, in their recurring portion, including allocated shared costs. Always deducted, in full, regardless of its status.

5.2 Non-additive types unless translated into money with a formula

Type What it is How it is reported When it becomes additive
Risk avoided Reduction in the likelihood or impact of an adverse event. Separately, with the risk metric (inherent and residual level, document 33) and, if calculated, the expected loss avoided as an estimate. When it translates into a lower observable and attributable cost (operational losses, penalties, premiums, provisions) measured using a method in section 7. It is then recorded as an efficiency.
Compliance Ability to meet a regulatory or contractual obligation. Separately, linked to the obligation (document 34). When it replaces an actual compliance cost (hours of manual control, external service) measured with a formula. It is then an efficiency.

5.3 Magnitudes that are reported separately and never counted in net value

Magnitude Why it is not added How it is reported
Unmaterialised released capacity It does not reduce any cost (rule 3). In euros (F4) and in hours, with its materialisation rate (F5).
Capacity reassigned to a new activity Its value, if any, appears in the result of the destination activity; adding it would be double counting. In hours and euros, with destination activity, owner and date.
Potential value It has not occurred (rule 4). With additional investment, hypothesis and timeframe; for prioritisation only (F3).
Option value Transform bets whose value depends on future decisions. Qualitative description documented at G3 (01 §7.6), learning milestones and investment cap per stage. In T01 it is recorded as non-quantified value with the "strategic option" dimension.
Non-quantified value There is no demonstrable economic relationship (rule 7). Physical metric and reason; in T01, in no_cuantificado[], with dimension and level 0–3 (no effect, low, medium, high), metric with baseline, target and current value, and reason. Without a metric it does not count; it is never translated into euros.

5.4 Economic exposure to customer agents

When customers act through personal AI agents (35 §9.4), a gap appears that used to be held by friction: the gap between who is entitled to a benefit (a concession, a refund, a discount) and who asks for it. Agents close it, because they always ask. Exposure is a magnitude of section 5.3: it is reported separately and follows its rules.

Why it matters. A use case that serves customer agents can show a support saving and, at the same time, pay more concessions. If exposure is not calculated and reported separately, net value looks better than it is.


06Official formulas

These formulas are the only valid ones in SEVEN-G. Documents 41, 42 and 43, the templates and the tools refer to them by their code.

Code Magnitude Formula Notes
F1 Amount of a value line Amount = incremental units × unit value Incremental units = result with AI − reference result (adjusted baseline or control group).
F2 Annual net value Annual net value = efficiencies + return − recurring cost Materialised efficiencies only. Unmaterialised released capacity excluded. Calculated for realised (current) value and for potential value.
F2v Validated net value Validated net value = validated efficiencies + validated return − recurring cost Cost is deducted in full. It may be negative even if F2 is positive.
F3 Additional net value per euro Additional net value per euro = (potential annual net value − current annual net value) ÷ additional investment required Unit: euros of annual net value per euro invested. If the additional investment is zero or does not exist, it is not calculated and prioritisation is based on absolute additional net value.
F4 Released capacity Net released hours = volume processed with AI × (reference unit time − unit time with AI) · Released capacity (€) = net released hours × fully loaded hourly cost The time with AI includes human review, exceptions and corrections. The fully loaded hourly cost is set by management control.
F5 Materialisation Materialisation rate = materialised hours ÷ net released hours · Reassignment rate = hours reassigned to a new activity ÷ net released hours Materialised hours: those that translate into lower actual cost or budgeted avoided cost. Calculated in hours so as not to mix internal and external rates.
F6 Validated proportion Validated proportion = validated value ÷ (validated + declared + estimated value) Based on gross realised value (materialised efficiencies + return) for the period. Amounts with no data are not included in the denominator and are reported separately.
F7 Net present value NPV = −I + Σ (annual net value in year t ÷ (1 + r)^t), for t = 1…H I, r and H as per section 8.
F8 Return on investment ROI(H) = (Σ annual net value in year t − I) ÷ I, for t = 1…H Always based on annual net value (F2), never on gross value.
F9 Payback period First year in which the cumulative Σ annual net value ≥ I, linearly interpolated within the year With a constant annual net value, it is equivalent to I ÷ annual net value.
F10 Value realisation Realisation = realised value for the period ÷ expected value for the period according to the realisation plan Document 43. Calculated in total and using validated value only.

Cost per unit of outcome (recurring cost for the period ÷ units of useful outcome) is defined in document 42.


07Attribution methods

7.1 Choosing the method

The attribution method is chosen in phase 2, approved at G2 and not changed without the approval of the body that decided G2 (01 §7.4, rule 6). It determines the maximum status that the value can reach.

Method What it consists of When to use it Requirements Maximum status
Randomised control group Units (customers, cases, branches) are randomly assigned to a group with AI and a group without AI over the same period. Whenever it is ethically, legally and operationally possible. Preferred method for return (conversion, retention, price). Sufficient size to detect the expected effect; recorded assignment; no contamination between groups; duration covering the business cycle. Validated
A/B test Variant of the above in digital channels or high-volume processes, with continuous splitting of traffic between versions. Digital interactions, recommendations, content, customer-facing assistants. Primary metric set in advance; minimum period set in advance; the test is not stopped on seeing a favourable result. Validated
Difference-in-differences The evolution of a treated group is compared with that of a comparable untreated group, before and after implementation. Phased roll-outs (regions, branches, business lines) where randomisation is not possible. Parallel trends verified in the prior period; absence of other changes affecting only one group. Validated
Adjusted before-and-after The subsequent period is compared with the baseline, correcting for volume, seasonality, mix and prices. Internal processes with no comparable group; Optimise use cases with a large and rapid effect. Baseline covering at least one full cycle; adjustments documented and approved by management control; record of other changes during the period. Validated if the adjustments are documented and there were no relevant concurrent changes; otherwise, declared
Expert estimate People with knowledge of the process estimate the effect using a structured procedure. Last resort: when there is no data and no possibility of comparison, or for the initial hypothesis in phase 2. At least two experts independent of the team; explicit hypotheses; a range, not a point estimate; a plan to replace it with a measurement method. Declared or estimated. Never validated

Selection criteria, in this order:

  1. If randomisation is possible, randomise.
  2. If the roll-out is staggered, design it to allow difference-in-differences.
  3. If there is no comparable group, use adjusted before-and-after, with a measured baseline.
  4. Expert estimates are only accepted with a plan and a date for replacing them. In Optimise they cannot evidence G5 or G7; in Augment and Transform they may support the G2 hypothesis, but not realised value.

In Transform use cases, attribution is applied by stage and focuses on the market or customer evidence required at G5 (01 §7.6): usage, conversion, initial revenue or verified operational change.

7.2 Cross-unit use cases and enabling platforms

Some use cases do not belong to a single business unit. They are cross-unit use cases, such as a tool used by several units (for example, a generative assistant built into the office suite), or enabling platforms: shared data, knowledge or decision capabilities used by other use cases. Their value is not measured in the same way as that of a business use case.

Type Example (illustrative) How it is recorded in T01 How it is measured
Enabling platform Shared data platform for several AI use cases One use case that lists the use cases that rely on it (alcance.habilita) Its value is allocated to the use cases that rely on it (document 10 §4.1, rule 3). For the platform itself, only its cost, its availability and the use cases it serves count.
Cross-unit Generative assistant in the office suite for several units A single use case with its roll-out by unit (alcance.reparto) and amounts by unit (valores[].area). No separate use case is opened for each unit. By business unit, using the measurement ladder in this section.

Measurement ladder by unit. Each rung only counts if the previous one is met.

Rung What is measured Source Maximum status Does it add to net value?
1. Cost Licences, training and governance. Each unit bears its own licences; shared costs (adoption office, ongoing training, permission review) carry no unit. Contracts and accounts Validated It is deducted in full from day one (asymmetric prudence, section 2)
2. Adoption Active over assigned licences and weekly active users, by unit Platform usage reports, not surveys Indicator, no amount No
3. Released capacity Hours released as declared by users, valued with formula F4 Surveys or each unit's estimate Declared or estimated. Never validated. No (rule 3)
4. Realised value Lower actual cost (hiring avoided, less overtime, outsourcing not renewed, licences retired) or capacity reassigned to an identified activity Accounts and management control Validated Yes

Rules:

  1. One use case, several units. The cross-unit use case has a corporate sponsor. Each unit has its own business owner of the benefit, who declares the unit's share (document 43 §6.4).
  2. A roll-out that can be measured. The roll-out is staggered by unit so that it can be measured with difference-in-differences (section 7.1, criterion 2). Another option is to assign licences at random among eligible people. If the tool is rolled out across the whole company at once, only an expert estimate is possible, and it never allows validation.
  3. Adoption threshold. G2 sets a minimum percentage of active over assigned licences. In each unit in use that falls below the threshold, the roll-out is reviewed or unused licences are withdrawn. A unit keeps paying for the tool because it uses it, not out of inertia.
  4. No double counting with each unit's own use cases. If a unit also has its own use case on the same process, document 43 §6 applies: the generic saving of the cross-unit tool is not claimed again.
  5. Net value with and without cross-unit use cases. In reports to the board, the portfolio's net value is shown with and without cross-unit use cases and platforms (section 11.1). A large and certain cost therefore neither hides nor inflates the result of the business use cases.
  6. Indirect value is not converted into euros. Usage culture, maturity or better permissions and data are recorded in the maturity model (document 11) and in sphere 05 Data. The main risk of these tools is showing a person information they could access through inherited or excessive permissions. It goes in the risk matrix (P12) and is reviewed before each roll-out wave.

Illustrative example (fictitious data, the same as in the T01 demo register):

Unit Roll-out Active / assigned licences Hours released per month (declared) Annual cost Realised value
Finance In use 792 / 900 (88 %) 7,200 €324,000 €540,000, validated (accounting close outsourcing not renewed)
Commercial In use 624 / 1,200 (52 %) 5,100 €432,000 €180,000, declared (previous tool retired)
Customer service Pilot 356 / 400 (89 %) 1,900 €144,000 —
Shared (no unit) — — — €260,000 —
Total 14,200 €1,160,000 €720,000

Reading for the board: the use case's annual net value is 720,000 − 1,160,000 = −€440,000. The 14,200 hours declared per month are not savings until they are realised. Commercial is below the 60 % adoption threshold and declares released hours with no destination. Extending the tool to new units is therefore conditional on reviewing Commercial's licences and on the unit declaring how its hours are realised.

Why it matters. A cross-unit tool has a large, certain cost that is visible from day one, and a value spread across many people and units. If it is measured like any other use case, one of two things happens: declared hours are added up and the portfolio is inflated, or nothing is measured and the tool keeps being paid for out of inertia. The ladder by unit shows where the tool is used, where it produces value and where licences should be withdrawn. The committee and the board can then decide on extending it with data rather than surveys.

7.3 AI use cases for IT and cyber defence

Use cases that use AI to protect and operate the company's own technology —detection and response, application and API security, agent test bench, operations and resilience, and detection of shadow AI (document 35 §9.3)— are treated like the enabling platforms of section 7.2:

  1. They are measured by operational outcome (presentation rule 11): detection, response and recovery times against the baseline, coverage and effectiveness, with the indicators of document 41 (for example, IND-RIE-08 and IND-OPE-27).
  2. NPV is not their viability criterion. The rule in section 8.3 applies to business cases; for these use cases, G3 checks that the expected operational outcome has a baseline, a target and a deadline, and that the full cost fits within the approved envelope. If they also produce observable economic value (licences or services withdrawn, for example), it is recorded under rules 1 to 9, without viability depending on it.
  3. They are funded from the enablement envelope (document 13 §12) and do not compete with business cases for the Optimise or Augment envelopes.
  4. They are presented separately from the portfolio net value, like enabling platforms (presentation rule 10): net value is given with and without them.
  5. Avoided risk is not turned into savings (error 12 in section 10).

Why it matters. Requiring a positive NPV from cyber defence forces the invention of avoided losses without a formula, or no investment in what protects the whole portfolio. Measuring it by what it improves in detection, response and recovery, and funding it as enablement, allows decisions to be made with data without inflating the net value of the business cases.


08Horizon, discounting and single economic criterion

8.1 The problem it solves

The material prior to SEVEN-G combined several return thresholds (target ROI percentages over different timeframes and a maximum payback period) with two different ROI formulas: one divided gross value by investment and the other divided net benefit by cost. With that mix, the same use case could be approved or rejected depending on the threshold and formula chosen. SEVEN-G replaces this with a single economic criterion based on net benefit.

8.2 Definitions

Element Definition
I · Initial investment Build cost plus initial adoption cost (document 42), incurred once. It does not include recurring cost, which is already deducted in annual net value.
Annual net value in year t Annual net value (F2) expected or realised in year t, with the adoption curve (ramp-up) set out in the realisation plan. If a retirement cost is foreseen, it is deducted in the year in which it is incurred.
H · Horizon Number of years of evaluation. It is set by the company in C2 (01 §5.1). It may not exceed the expected useful life of the solution.
r · Discount rate Annual rate set by the finance function in C2. If the company does not set one, r = 0.

The board dashboard (T17) calculates the NPV (F7) of each use case with the curve of its realisation plan (document 43 §4.1) and with the H and r of C2 (r = 0 if the company does not set a rate). Year 0 is the year of the first funding tranche and the investment of each tranche is deducted in the year in which it is paid: the NPV is the sum of the annual flows (value according to the curve, less recurring cost, less the year's investment) divided by (1 + r)^t, for t = 0…H. It is the same F7 with the investment spread over time; if all the investment is paid in year 0 and value starts in year 1, the result is identical. The dashboard adds up the flows from t = 0 to t = H: if the curve already captures value in year 0, its NPV may differ from the one calculated with T11 in phases 2 and 3. Without a realisation plan, the dashboard does not calculate the use case's NPV.

8.3 Rule

  1. There is a single economic feasibility criterion: NPV (F7) ≥ 0 with the H and r approved in C2. With r = 0, this is equivalent to recovering the initial investment within the horizon.
  2. ROI (F8) and payback period (F9) are for information only. They are always calculated using the same I, H and annual net value, and have no thresholds of their own.
  3. A return is never calculated on gross value. Every return is based on annual net value.
  4. F3 is used to prioritise between use cases (rule 9), not NPV or ROI.
  5. By ambition level (01 §7.6):
    • Optimise: NPV ≥ 0 at G3 with expected values; at G7 it is recalculated with validated realised values.
    • Augment: the same criterion, plus the feasibility of adoption and of the role change.
    • Transform: NPV ≥ 0 for the whole is not required at G3. The investment cap for the stage, stop criteria per stage and documented option value are required. NPV is calculated for information when there are return hypotheses.
  6. Market thresholds are not used. No ROI percentage from outside the company replaces the C2 criterion.

8.4 Illustrative example

Build: €150,000. Initial adoption: €30,000. I = €180,000. Horizon approved in C2: H = 3 years. Discount rate: r = 8%. Expected annual net value with ramp-up: year 1, €40,000; year 2, €110,000; year 3, €120,000.

Year Annual net value Discount factor Present value Undiscounted cumulative
0 −€180,000 1.000000 −€180,000.00 −€180,000
1 €40,000 1.080000 €37,037.04 −€140,000
2 €110,000 1.166400 €94,307.27 −€30,000
3 €120,000 1.259712 €95,259.87 €90,000

09Agility of the decision-making system

9.1 What is measured

Agility measures how long the governance system takes to decide and to move into production, not the speed of the technical teams. It is calculated from the events in T01 (03 §3.3).

Segment From To Purpose
Idea → approval Registration of the use case G3 decision with a Proceed or Proceed with conditions outcome Agility in launching a bet.
Approval → production Favourable G3 decision Favourable G5 decision Agility in delivering it.
Idea → production Registration Favourable G5 decision Total time to production (03 §3.5).
Decision time Request for a gate Decision Agility of the decision-making body itself.

All segments exclude time on hold for a recorded external reason, which is reported separately. They are shown as the median and 80th percentile, never as the mean alone.

9.2 Segmentation by risk and ambition

Times are always segmented by residual risk level (Low, Medium, High, document 33), by ambition level and by intensity. Agile governance takes little time over simple matters and devotes time to what carries risk; taking the same time over everything is a sign of a process that does not discriminate.

Initial benchmarks, calculated as the sum of the reference time limits per phase in document 03 §3.6 (indicative, not including decision times):

Segment Lite Enterprise
Idea → approval (phases 0 to 3) 70 days 125 days
Approval → production (phases 4 and 5) 80 days 135 days
Idea → production 150 days 260 days
Decision on a gate 5 working days 10 working days

The company approves its benchmarks in C2 and may set a fast track for Lite use cases with Low residual risk (for example, grouping G0–G2 and G4–G5, 01 §7.5). The benchmarks are recalibrated in C5 using the company's own data.

9.3 Reading rules

  1. Agility is read together with quality. A shortening of time limits accompanied by more incidents in the first months of production, more expired conditions or more nonconformities is not an improvement.
  2. Transform bets are compared with the rest. If they take much longer to reach production, or do not reach it, this is signal 7 of the transformation index (00 §5.3).
  3. Decision time is the responsibility of the body, not the team. It is reported to the AI Committee and the board.

10Common errors that inflate value

# Error How it is detected Correction
1 Adding up released hours as savings. "People" efficiencies with no reflection in the accounts and no budgeted avoided cost. Reclassify as released capacity (F4) and require a materialisation plan.
2 Gross value without deducting recurring cost. "Benefit" totals that do not reconcile with F2. Apply F2 with the full cost in document 42.
3 Attributing the trend to AI. Unadjusted before-and-after in a period with changes in volume, price or seasonality. Method in section 7 with adjustment or a control group.
4 Double counting between use cases. Several use cases claiming the effect on the same process or population. Combined measurement and allocation key (rule 5).
5 Valuing return at gross revenue instead of margin. Return equal to attributed sales. Value at margin or state this expressly without mixing them.
6 Time with AI that omits human review. Unit saving equal to the time of the original task. Measure the actual time including review, exceptions and corrections.
7 Extrapolating the pilot to the whole company. Potential calculated by multiplying the pilot result with no adoption or investment hypothesis. Apply rule 4 with usage rate and extension cost.
8 Charging only direct costs. Costs of shared licences, platform or common teams not allocated. Cost allocation as per document 42.
9 Using the gross amount declared by a supplier. "Recovered" or "detected" figures taken from the supplier's report. Measure the increase against what was already being detected or recovered.
Sphere map and ambition levels (10) Changing the metric or threshold after seeing the results. Differences between the hypothesis approved at G2 and the one measured at G5. Revert to the approved hypothesis; any change requires approval (01 §7.4).
Maturity model (11) Presenting expected value as realised. Amounts from the hypothesis canvas in production reports. Separate expected from realised; expected value is never validated.
Transformation index (12) Counting risk avoided as savings. Expected losses avoided added to net value. Report it separately unless translated into observable cost (section 5.2).
AI thesis, ambition and risk appetite (13) Turning the hours declared by the users of a cross-unit tool into savings. Efficiencies equal to survey hours × hourly cost, with no accounting reflection and no breakdown by unit. Ladder in section 7.2: cost and adoption by unit; only realised value adds up.
Portfolio management (14) Net value inflated by not deducting the concessions that an agent resolves. A use case that serves customer agents shows the support saving and omits the increase in concessions paid. Deduct the additional concessions from net value and compare with the human baseline (section 5.4).

Presenting to the committee or the board as validated an amount that is not validated constitutes a major nonconformity (document 37). Relaxing stop criteria or changing the attribution method without approval is dealt with in accordance with 01 §7.4 and §12.


11Presentation to the board

11.1 Rules

  1. The validated proportion is always visible next to each value total, in the full dashboard, in the mobile version and in any document in the board pack (document 60).
  2. Efficiencies, return and recurring cost are shown separately, with annual net value (F2) and validated net value (F2v).
  3. Unmaterialised released capacity and reassigned capacity are shown on separate lines, outside net value.
  4. Use cases with negative annual net value are identified individually.
  5. "No data" is shown as such, with the number of use cases affected.
  6. Potentials only appear when complete (rule 4) and separately from realised value.
  7. A comparison is made with the previous period and relevant variations are explained, including changes in status.
  8. Each use case presented in detail includes its understandable description (rule 10). A maximum of three use cases are presented in detail per session, and answers follow the formats of the common specification: "Yes", "Yes, with one condition: …", "Not yet, because … is missing" or "No, because …".
  9. The composition of value by ambition level (efficiencies versus return) is shown to feed signals 1 and 2 of the transformation index.
  10. Cross-unit use cases, enabling platforms and AI use cases for IT and cyber defence are shown separately, with their breakdown by business unit where they have one (cost, adoption, released capacity and realised value) or with their operational outcome, and the portfolio's net value is given with and without them (sections 7.2 and 7.3).
  11. Three perspectives, side by side and never merged. Each use case is presented in three columns read together: economic value (in euros, with its status: validated, declared or estimated; rules 1 to 9), operational outcome (physical indicators from document 41 —cycle time, quality, errors, satisfaction, adoption— with their baseline, target and current value, plus the non-quantified value of section 5.3) and risk exposure (main residual risk, open High and Critical risks, open incidents and nonconformities; documents 33 and 37). None is translated into another and they are not combined into a single score: a good operational outcome does not offset an unproven economic value, nor does a high net value offset an untreated risk. In T01, each use case's operational indicators are recorded in resultado_operativo[], with the indicator code from document 41 when there is one; if there is none, the column says "no indicator", not zero (rule 8).

Why it matters. Forcing everything into euros pushes people to invent conversions without a formula (the rule 7 mistake) or to ignore what cannot be converted. With three columns, the board sees at once what the use case yields, what changes in operations and what risk it takes on, and decides knowing which part is money and which part is not.

11.2 Value summary template

Illustrative data.

Item Annual amount Validated Validated proportion
Materialised efficiencies €620,000 €380,000 61.3%
Return €410,000 €90,000 22.0%
Gross realised value €1,030,000 €470,000 45.6%
Recurring cost €520,000 — Deducted in full
Annual net value (F2) €510,000
Validated net value (F2v) −€50,000
Unmaterialised released capacity (not added) €290,000
Use cases with negative annual net value 2 of 11
Use cases with no return data 3 of 11

Reading for the board: the portfolio generates a positive annual net value according to what has been declared, but on the basis of the value validated to date it does not cover its recurring cost. The priority is to validate the declared return and materialise the released capacity before approving new extensions.


12Responsibilities in measurement

Activity Responsible Verifies or validates
Value hypothesis, baseline and attribution method AI Product Owner, with the business owner of the benefit AI Office (Lite) or AI Auditor (Enterprise) at G2
Declaration of realised value Business owner of the benefit Management control
Validation of value Management control or audit AI Auditor by sampling
Full cost and allocation Management control with the AI Office (document 42) Internal audit
Portfolio consolidation and elimination of double counting AI Office Management control
Presentation to the board AI Office and sponsor AI Committee

13Associated tools and templates

Name Use in this document
Use case register (T01) Amounts, statuses, status change events, dates for agility; scope of cross-unit use cases and platforms, with roll-out, adoption and amounts by unit (section 7.2); non-quantified value with dimension and level (rule 7).
Value hypothesis canvas and calculator (T11) Formulas F1–F4 and F7–F9 in phases 2 and 3; attribution method; scenarios (P10 §6.2) and C2 criterion as information. Imports the use case from T01 and exports its expected values.
Value realisation tracking (T12) Statuses per period, expiries, F5, F6 and F10.
Cost calculator per use case (T13) Full recurring cost and initial investment.
Board AI dashboard (T17) Presentation with the validated proportion visible; card for cross-unit use cases and platforms with the portfolio's net value with and without them; NPV (F7) of each use case with its realisation plan (section 8.2) and "Non-quantified value" card.
Value hypothesis canvas (P08) Hypothesis, attribution method and stop criteria.
Baseline (P09) Reference measurement.
Validation and pilot results (P22) Value measured against the hypothesis at G5.
Value realisation tracking (P28) Value per period and status.
Use case record (P31) Understandable description (rule 10).

Document Relationship
00 · What SEVEN-G is and how it helps companies Source of the ten rules (§6) and of the transformation signals (§5.3).
01 · Foundational methodology Criteria by ambition (§7.6), measurement in the cycle (§11) and decision rules (§7.4).
03 · Tools and use case register Events, funnel metrics and reference time limits.
13 · AI thesis and risk appetite Horizon, discount rate, expiry periods and agility benchmarks approved in C2.
14 · Portfolio management Prioritisation using additional net value per euro.
37 · Nonconformities and incidents Treatment of breaches of these rules.
41 · Indicator catalogue Indicators derived from the official formulas.
42 · AI costs Full recurring cost, initial investment and cost per unit of outcome.
43 · Benefits realisation Realisation plan, tracking, double counting, materialisation and audit of value.
60 · Board pack Application of the presentation rules.

15Version control

Version Date Changes
0.1 16-09-2026 First version. Develops the ten measurement rules and sets out the amount statuses with owners, evidence and expiry, the official formulas F1–F10, the attribution methods with their maximum status, the single economic criterion based on net benefit (NPV with the C2 horizon and rate; ROI and payback period for information only), the measurement of agility by risk and ambition, the value inflation errors and the rules for presentation to the board.
0.1 18-09-2026 Adds section 7.2: cross-unit use cases and enabling platforms, with the measurement ladder by unit (cost, adoption, released capacity and realised value), the adoption threshold and the portfolio's net value with and without them; error 13 and presentation rule 10.
0.2 28-09-2026 Non-quantified value is recorded in T01 with dimension, level 0–3, metric and reason, never in euros, and a use case sustained by non-quantified value needs its next R6 dated (rule 7 and section 5.3); the board dashboard calculates the NPV (F7) of each use case with the curve of its realisation plan (section 8.2); section 13 (D135).
0.3 01-10-2026 Presentation rule 11: three perspectives side by side and never merged —economic value, operational outcome and risk exposure—; operational indicators are recorded in T01 in resultado_operativo[] (D150).
0.4 19-10-2026 Section 7.3: AI use cases for IT and cyber defence are measured by operational outcome, NPV is not their viability criterion, they are funded from the enablement envelope and presented separately from the net value; presentation rule 10 extended (D159).
0.5 16-11-2026 Section 5.4 (economic exposure to customer agents: a separate scenario that never adds to net value) and common error 14 (D185).