SEVEN-G
Template P12 · 16-09-2026

Template P12 · Risk matrix and register

Risk matrix and register

Identifies, assesses and monitors the use case's risks using common scales, inherent and residual levels, a response and acceptance by the competent body.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used It is created in phase 3 and is a living register: it is updated in phase 5 (updated risk register before G5), in phase 6 and at every R6, and whenever a risk materialises, the classification changes or a new risk emerges.
Who completes it The AI Risk Owner coordinates and assesses; the AI Product Owner and the AI Technical Owner identify risks and propose controls; each risk has an owner.
Who verifies it Lite: the AI Risk Owner at G3 and G5; if the AI Risk Owner has prepared the register, the AI Office or the AI Auditor verifies it. Enterprise: AI Auditor.
Who decides Acceptance of residual risk is decided by the body in section 6 according to the level. The gate is decided by the body in 01 §7.5.
Gate at which it is reviewed Feasibility, G5 · Go-live and R6 · Continuity review. (G3)
Tool T06 · Risk matrix and register: "Risks" view and "Risks" record tab of the T01 register, with the same fields, scales, heat map and acceptance rules as this template, CSV export and Excel of the use case (matrix, register, mitigation and contingency plans proposed for P13 and typical risks to consider).
Lite versus Enterprise Lite may omit the columns and blocks marked (Enterprise). The scales, the inherent and residual levels, the response and the acceptance are mandatory in both.

Completion rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN.
AI systems covered Codes from P05.
Regulatory classification Taxonomy of 03 §3.3 (P11).
Intensity and ambition level
Document version
Date of last review DD-MM-AAAA.
Next review Date of the next R6 or the next gate.
Applicable economic impact thresholds Reference to those approved in C2 (document 13).

03Scales

3.1 Likelihood

Value Name Indicative reference
1 Rare Less than once in 5 years or < 5 % over the use case's horizon
2 Unlikely Once every 2–5 years or 5–20 %
3 Possible Once every 1–2 years or 20–50 %
4 Likely Several times a year or 50–80 %
5 Almost certain Monthly or more often, or > 80 %

3.2 Impact

Value Name
1 Negligible
2 Minor
3 Moderate
4 Major
5 Critical

Assessment axes (the highest is taken):

Axis What is assessed Guidance
Economic Losses, cost overruns, unrealised value. Thresholds in euros set by the company in C2, in proportion to its size.
People and rights Harm to customers, employees or other people; discrimination; physical safety.
Regulatory Non-compliance, sanctions, requests from the supervisor.
Operational Interruption or degradation of processes and services.
Reputational Loss of trust among customers, the market or society.

3.3 Risk level

Level = Likelihood × Impact: Low 1–4 · Medium 5–9 · High 10–15 · Critical 16–25.

Likelihood \ Impact 1 Negligible 2 Minor 3 Moderate 4 Major 5 Critical
5 Almost certain 5 Medium 10 High 15 High 20 Critical 25 Critical
4 Likely 4 Low 8 Medium 12 High 16 Critical 20 Critical
3 Possible 3 Low 6 Medium 9 Medium 12 High 15 High
2 Unlikely 2 Low 4 Low 6 Medium 8 Medium 10 High
1 Rare 1 Low 2 Low 3 Low 4 Low 5 Medium

In a spreadsheet: =IF(P*I>=16,"Critical",IF(P*I>=10,"High",IF(P*I>=5,"Medium","Low"))).


04Risk register

4.1 Identification

No. Risk (cause, event and consequence) Category Reference typical risk System or phase Risk owner Date added
R01 EST · TEC · DAT · ECO · LEG · ORG · REP · GEN · SEG · TER Code from the catalogue of document 33, if one exists
R02
(illustrative example) R01 Through a prompt injection in a customer's message, the assistant reveals order data belonging to another customer, causing harm to the affected person and a possible breach of the GDPR. GEN GEN catalogue of document 33 Enquiries assistant · phases 5–6 AI Technical Owner 20-11-2026

Categories: EST strategic · TEC technical · DAT data · ECO economic · LEG legal and compliance · ORG organisational · REP reputational · GEN generative AI and agents · SEG security and offensive AI · TER third parties.

4.2 Inherent and residual assessment

No. Inh. L Inh. I Dominant axis Inherent level Existing and effective controls Res. L Res. I Residual level Trend (Enterprise)
R01 1–5 1–5 Low · Medium · High · Critical Rising · Stable · Falling
(illustrative example) R01 4 4 People and rights 16 Critical Session isolation per customer; output filter for personal data; injection testing with 0 leaks 2 4 8 Medium Falling

4.3 Response and monitoring

No. Response Planned controls (P13) Accepted by Acceptance date Status Next review
R01 Avoid · Mitigate · Transfer · Accept Identified · Under treatment · Accepted · Materialised · Closed
(illustrative example) R01 Mitigate Output monitoring with alerting (P25) AI Sponsor, with clearance from the AI Risk Owner 15-01-2027 Accepted R6 in the second quarter of 2027

Responses: Avoid (the cause or the activity is eliminated) · Mitigate (controls that reduce likelihood or impact) · Transfer (insurance or contract; reputational and regulatory risk is not fully transferred) · Accept (the residual is assumed with approval). The list of statuses is proposed by this template, to be confirmed in document 33.


05Use case heat map

In each cell, enter the risk numbers according to their residual assessment.

Likelihood \ Impact 1 Negligible 2 Minor 3 Moderate 4 Major 5 Critical
5 Almost certain
4 Likely
3 Possible
2 Unlikely R01 (illustrative example)
1 Rare
Summary Inherent Residual
Critical
High
Medium
Low

06Acceptance of residual risk

Residual level Who may accept it Requirement
Low (1–4) AI Product Owner With a record.
Medium (5–9) AI Sponsor With clearance from the AI Risk Owner.
High (10–15) AI Committee With clearance from the AI Risk Owner and a mitigation plan (P13). Also applies under Lite intensity.
Critical (16–25) Not accepted Exceptionally, only the board or its board committee, within the risk appetite approved in C2. Without that approval it blocks G3 and G5.
No. Residual level Accepting body Date Reference of the minutes or record Validity of the acceptance
Until the next R6 or until the change that invalidates it

07Portfolio risks (Enterprise)

Field Content Guidance
Risks shared with other use cases Same supplier, same model, same data or same critical function.
Concentration If the sum of exposures exceeds the risk appetite, the AI Committee is informed.
Risks to be escalated High or Critical risks and concentrated risks.

08Review history

Date Moment Main changes New risks Closed risks Reviewed by
G5 · R6 · Event (phase 3)

09Quality criteria

The formal criteria are in document 21 (see criteria G3.xx, G5.xx and R6.xx) and the methodology in document 33.

# Check Status
1 The register has been checked against the catalogue of typical risks, including GEN, SEG and TER where applicable. Met · Not met · Not applicable · Pending
2 Each risk describes cause, event and consequence, and has an owner.
3 The scales used are the common ones and impact takes the highest of the five axes.
4 Inherent and residual levels are calculated; the residual only considers existing and effective controls.
5 Each risk has a response; those marked Mitigate have controls in P13.
6 Acceptance is signed by the body corresponding to the residual level.
7 There are no Critical residual risks without approval from the board or its board committee.
8 The register is up to date at the time of the gate or the review.

10Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Coordinates and assesses AI Risk Owner
Identifies and proposes controls AI Product Owner and AI Technical Owner
Verifies AI Office or AI Auditor (Lite, if the AI Risk Owner prepares the risks) · AI Auditor (Enterprise)
Accepts the residual According to section 6
Decides the gate Body in 01 §7.5

Segregation of duties: whoever accepts a risk has not assessed it; the AI Risk Owner issues clearance but does not accept risks of Medium level or above.


11Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 16-09-2026 First version. Applies the scales, levels, responses, acceptance and categories of the common specification §5.1.