Template P13 · Mitigation and contingency plan

Mitigation and contingency plan

Turns the response to each risk into actions with an owner, deadline, cost and effectiveness test, and defines what is done if the risk materialises.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used In phase 3, together with the risk matrix and register (P12), before G3. It is followed up in phases 4 and 5 (controls must be designed at G4 and operating at G5) and updated in phase 6.
Who completes it The AI Risk Owner coordinates. Each action is proposed and carried out by its owner (usually the AI Technical Owner or the AI Product Owner).
Who verifies it Lite: the AI Risk Owner at G3; if the AI Risk Owner has prepared the plan, the AI Office or the AI Auditor verifies it. Enterprise: AI Auditor.
Who decides It is approved with G3: AI Sponsor with risk clearance (Lite) · AI Committee (Enterprise). Funding for the actions forms part of the decision.
Gate at which it is reviewed Feasibility; follow-up at G4, G5 and R6. (G3)
Tool T06 · Risk matrix and register: records the response, controls and contingency plan of each risk; treatment actions with owner, deadline and status are tracked in this template. The Excel of the use case generated by T06 proposes, for each registered risk, mitigation actions (section 4) and a contingency plan (section 6) from the catalogue in document 33 §9, with the columns of this template to be completed: it is the starting point, not the approved plan.
Lite versus Enterprise Lite may omit the columns and blocks marked (Enterprise). Every Medium, High or Critical residual risk must have actions and, if High or Critical, a contingency plan, under both intensities.

Completion rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN.
Associated P12 version The plan corresponds to a specific version of the register.
Document version
Date DD-MM-AAAA.
Author Name and role.
Intensity Lite · Enterprise.

03Summary of risks requiring treatment

No. (P12) Risk Inherent level Response Target residual level Target date
Avoid · Mitigate · Transfer · Accept Low · Medium · High · Critical
(illustrative example) R01 Leakage of another customer's data through prompt injection 16 Critical Mitigate 8 Medium Before G5

04Mitigation actions

Action no. Risk Action Control type Reduces Owner Deadline Estimated cost (€) and category Evidence of effectiveness Status
A01 Preventive · Detective · Corrective Likelihood · Impact · Both Not started · In progress · Implemented · Effectiveness verified
(illustrative example) A01 R01 Isolate the context of each conversation and limit queries to the authenticated customer's orders. Preventive Likelihood AI Technical Owner 15-12-2026 8,000 · Build people Test of 300 injection attacks with no leaks In progress
(illustrative example) A02 R01 Output filter that blocks personal data not belonging to the customer. Preventive Impact AI Technical Owner 15-12-2026 4,000 · Licences Filter test report Not started
(illustrative example) A03 R01 Operational alert when the filter blocks a response. Detective Impact AI Operations Owner 31-01-2027 1,500 · Control and compliance Alert configured and tested (P25) Not started

Cost categories: licences · model consumption · compute and infrastructure · data · build people · operations people · suppliers and services · control and compliance · adoption and training.


05Risk transfer

Complete if any response is "Transfer".

Risk Mechanism Counterparty Coverage and limits Annual cost (€) Part of the risk that is not transferred
Insurance · Contractual clause · Supplier warranty Reputational, regulatory or people-related risk that remains with the company

06Contingency plans

One for each High or Critical residual risk and for each risk with impact 5 even if its level is lower.

Field Content Guidance
Risk No. from P12.
Scenario What happens when the risk materialises.
Trigger Indicator and threshold that activate the plan. It must be observable in monitoring (P25).
Immediate actions Containment in the first hours, including shutting down the system if appropriate.
Use of the rollback plan Whether P19 is activated and how the previous process is restored.
Owner responsible for activating the plan Person with authority to stop the system.
Maximum reaction time Hours from the trigger to containment.
Communication Who is informed: AI Committee, data protection, customers, supervisors.
Regulatory notifications If it may be a serious incident or a personal data breach, the incident response plan (P26) is followed with its time limits.
Recovery Conditions for resuming operation.

(illustrative example) Risk R01. Trigger: a single confirmed response containing another customer's data. Actions: deactivate the assistant on the web channel and route enquiries to agents; preserve logs; open an S1 or S2 incident depending on scope. Owner: AI Operations Owner. Maximum reaction time: 1 hour. Communication: AI Committee and data protection officer immediately.


07Risks accepted without actions

Risk Residual level Reason for acceptance Accepted by (P12 §6) Condition that would require it to be reviewed

08Plan monitoring (Enterprise)

Review date Actions implemented Actions with verified effectiveness Overdue actions Risks that change level Decision

Overdue actions on relevant controls are treated as an expired condition and may constitute a nonconformity (01 §12).


09Total cost of the plan

Category One-off investment (€) Annual recurring cost (€)
Control and compliance
Build people
Operations people
Licences
Suppliers and services
Other categories
Total

The total must be shown in P10 §6.1.


10Quality criteria

The formal criteria are in document 21 (see criteria G3.xx, G4.xx and G5.xx).

# Check Status
1 Every Medium, High or Critical residual risk in P12 has actions or documented acceptance. Met · Not met · Not applicable · Pending
2 Each action has an owner, date, cost and planned evidence of effectiveness.
3 High and Critical residual risks, and those with impact 5, have a contingency plan with an observable trigger.
4 The contingency plans link to P19 (rollback) and P26 (incidents).
5 Transfers indicate what is not transferred.
6 The cost of the plan is incorporated into P10.
7 No conditions are proposed on critical security, legal compliance or human oversight controls.

11Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Coordinates AI Risk Owner
Answers for the actions Owners of each action
Verifies AI Office or AI Auditor (Lite, if the AI Risk Owner prepares the risks) · AI Auditor (Enterprise)
Decides and funds AI Sponsor with risk clearance (Lite) · AI Committee (Enterprise)

Segregation of duties: whoever carries out an action does not verify its effectiveness.


12Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 16-09-2026 First version. Mitigation actions linked to P12, transfer, contingency and cost by category of the common specification §5.1 and §5.7.