SEVEN-G
Template P26 · 16-09-2026

Template P26 · Incident response plan

Incident response plan

Prepares the response to incidents affecting an AI system: what is considered an incident, how its severity is classified, who acts, how it is contained and which reports must be checked.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used It is prepared in phase 5 (prerequisite for the P23 sign-off) and approved at the start of phase 6. It is reviewed after each S1 or S2 incident and at each R6.
Who completes it AI Operations Owner, with information security, data protection and the AI Risk Owner.
Who verifies it AI Office at Lite intensity; AI Auditor at Enterprise intensity.
At which gate it is reviewed G5 (existence and adequacy) and R6 (currency and results of drills).
Lite versus Enterprise Lite may omit the fields marked (Enterprise). The check of regulatory reports (block 8) is never omitted.
Tool T08 Nonconformity and incident register.
Relationship P17 Human oversight · P18 Security and kill switch · P19 Rollback · P24 Operations manual · P25 Alerts · P27 Incident and change log · documents 35, 37 (Nonconformities and incidents) and 52.

Rules:

This template does not constitute legal advice. Reporting obligations and their time limits must be verified with legal counsel at the time of the incident (reference consultation date for the framework: September 2026).


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
AI system(s) Identifier in the inventory (T02).
Regulatory classification Prohibited · High risk · Transparency obligations · Minimal risk · Out of scope · Pending classification.
Role of the company in relation to the system Provider · Deployer · Both · To be determined. It determines the reporting obligations (document 34).
Subject to DORA? Yes · No · To be determined.
Subject to NIS2 (according to national transposition)? Yes · No · To be determined.
Does it process personal data? Yes · No.
Intensity Lite · Enterprise.
Document version
Author Role and name.
Date DD-MM-YYYY.
Document status Draft · Submitted for verification · Verified · Approved · Superseded.

03What is considered an incident for this system

Type of incident: Performance degradation · Erroneous output with impact · Discriminatory or biased output · Information leakage · Unauthorised action by an agent · Prompt injection or manipulation · Unavailability · Regulatory breach · Misuse of the system · Supplier incident.

Type Does it apply to this system? (Yes · No) Specific example for this system Planned detection (P25 alert or other route)
Unauthorised action by an agent (illustrative example) Yes The agent issues a refund above the limit AL-02

04Severity

Common framework scale: S1 Critical · S2 High · S3 Medium · S4 Low. The full criteria are set out in document 37 and prevail over this guidance.

Severity Guidance Example for this system
S1 Critical Includes any possible serious incident under the EU AI Act and major incidents under DORA or NIS2 where applicable.
S2 High Relevant impact on people, customers, operations or compliance, contained or limited.
S3 Medium Limited impact, with no relevant effect on people or on reporting obligations.
S4 Low No appreciable impact; an anomaly that should be recorded.

05Roles during the incident

Role Holder Deputy Activated in Responsibility
Incident coordinator S1–S4 Leads the response and decides on containment. Normally the AI Operations Owner.
Technical lead S1–S3 Diagnosis, technical containment and rollback.
Information security Security and agent incidents Attack analysis and preservation of evidence.
Data protection If personal data are involved Assess personal data breach and the rights of affected individuals.
AI Risk Owner S1–S2 Assess regulatory obligations and the effect on the risk register.
Communication (Enterprise) S1–S2 Coordinated internal and external messages.
AI Sponsor S1–S2 Business decisions and escalation to governing bodies.
Incident recording S1–S4 Timeline, decisions and evidence in P27.

06Response phases

Internal target times are set by the company; they do not replace the regulatory time limits in document 37.

Phase What is done Owner Internal target time S1 Internal target time S2 Record
Detection Receive alert or notification; open incident On-call P27
Classification Type and initial severity Coordinator P27
Containment Apply the actions in block 7 Coordinator and technical lead P27
Reporting check Review block 8 Risk and data protection P27
Resolution Correct the immediate cause Technical lead P27
Recovery Return to normal operation with authorisation Coordinator P27
Closure and lessons Root cause, corrective actions, lessons Coordinator and risk P27 · P12

07Prepared containment actions

Action When it is applied Who can execute it Procedure
Kill switch Unauthorised action, injection with effect, leakage in progress P18 block 9
Reduce the autonomy level Degradation with risk of impact P19
Roll back to previous version Failure attributable to a recent change P19
Disable an agent tool or permission Abuse of a specific tool P18 block 5
Revoke credentials Identity compromise P18 block 4
Withdraw or correct published content Erroneous or inappropriate content visible to third parties
Preserve logs and evidence Always in S1 and S2

08Regulatory and contractual reports to be verified

Check boxes. For each incident, it is verified whether they apply; time limits are taken from document 37 and confirmed with legal counsel. This table does not assert time limits.

☐ Report to be verified Reference Does it apply? (Yes · No · To be determined) Who decides Who reports Time limit confirmed in document 37 and verification date Evidence
☐ Serious incident involving a high-risk AI system EU AI Act (obligations of the provider and of the deployer; document 34)
☐ Information to the provider of the AI system EU AI Act and contract (if the company is the deployer)
☐ Personal data breach to the supervisory authority GDPR, Article 33
☐ Communication to data subjects GDPR, Article 34
☐ Major ICT-related incident DORA
☐ Significant incident NIS2 and national transposition
☐ Sector-specific reports Company's sector regulation
☐ Contractual obligations towards customers or suppliers Contracts
☐ Communication to affected individuals not required by law but appropriate (Enterprise) Company policy

The report models, the reasoned decision not to report and the communications are in P51.


09Internal escalation

Severity Who is informed Internal time limit Reference
S1 AI Committee and board committee, in addition to the roles in block 5 Document 37
S2 AI Committee and sponsor Document 37
S3 AI Product Owner and AI Office Document 37
S4 Record in P27 Document 37

If the incident reveals a breach of the framework (control disabled, unapproved change, gate skipped), a nonconformity with code NC-AAAA-NNN is also opened (P50, document 37).


10Drills

Date Scenario Participants (roles) Time to containment Result (Passed · Passed with observations · Not passed) Improvement actions
(illustrative example) A document with hidden instructions causes an unauthorised external transmission On-call, security, data protection, coordinator 35 minutes Passed with observations Data protection had no reachable deputy; one is designated

At Enterprise intensity, at least one drill should be carried out before G5 and repeated at the frequency set by the company.


11Quality criteria

Formal G5 and R6 criteria in document 21; incident process in document 37.

# Check Status (Met · Not met · Not applicable · Pending)
1 The applicable incident types have a specific example and a detection route.
2 Severity uses the S1–S4 scale and refers to the criteria in document 37.
3 All roles have a holder and a deputy.
4 Containment actions are prepared and linked to P18 and P19.
5 Regulatory reports are identified as boxes to be verified, without unconfirmed time limits.
6 Internal escalation reaches the AI Committee and the board committee in S1.
7 At least one drill has been carried out (Enterprise).

12Approval and verification

Function Role Name Date Signature or reference
Author AI Operations Owner
Review Information security
Review Data protection
Clearance AI Risk Owner
Verifier AI Office (Lite) · AI Auditor (Enterprise)

Segregation of duties: the verifier is not part of the team that builds or operates the system.


13Version control

Version Date Changes
0.1 16-09-2026 First version of the template.

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.