SEVEN-G
Template P23 · 16-09-2026

Template P23 · Go-live sign-off

Go-live sign-off

Records the multi-level sign-off with veto power that authorises an AI system to go live: who signs, with what position, when and why.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used Phase 5, once the evidence for the phase is complete and before the G5 decision. Also in the event of a relevant change that entails a new go-live (P27).
Who completes it The AI Office prepares the record; each signatory completes their own row.
Who verifies it AI Auditor (Enterprise); AI Office (Lite) (01 §7.5).
At which gate it is reviewed G5 · Go-live. At Enterprise, the AI Committee decides after the multi-level sign-off (01 §7.5).
Lite versus Enterprise Enterprise: multi-level sign-off is mandatory, with the four signatories in block 5 (01 §6.7). Lite: risk clearance from the AI Risk Owner is sufficient; only the corresponding row and blocks 3, 4 and 7 are used. The fields that Lite may omit are marked (Enterprise).
Tool T03 Gate manager.
Relationship P12 Risk register · P17 Human oversight · P18 Security design · P19 Rollback test · P21 Delivery report · P22 Validation and pilot results · P29 Gate decision record.

Sign-off rules:

  1. Position of the sign-off: Favourable · Favourable with conditions · Veto. Every sign-off carries a date and a reason, including a favourable one.
  2. A veto blocks the go-live. It cannot be overridden by the sponsor or by the AI Committee; it is lifted only when the person who issued it (or whoever formally replaces them in their function) records a new sign-off once the reason has been resolved. Persistent disagreement over a veto should be escalated to the higher body, which may decide not to go live, but may not substitute the sign-off.
  3. Favourable with conditions is only possible on non-critical aspects. If the condition affects a critical control for security, legal compliance or human oversight, the position must be Veto (01 §7.3).
  4. Each signatory reviews the evidence within their remit; signing without having reviewed it is a nonconformity.
  5. Second-line signatories are not part of the team building the use case (01 §8.1 and §8.3).
  6. A Critical residual risk without the express approval of the board or its board committee blocks G5 (document 33).

This template does not constitute legal advice.


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
Use case name
AI system(s) Identifier in the inventory (T02).
Intensity Lite · Enterprise.
Ambition level Optimise · Augment · Transform.
Regulatory classification Prohibited · High risk · Transparency obligations · Minimal risk · Out of scope · Pending classification. A Prohibited or Pending classification system cannot be signed off.
Autonomy level A0 · A1 · A2 · A3 (P17).
Type of go-live Initial · Relevant change · Scope extension.
Document version
Date the record was opened DD-MM-YYYY.
Record status Open for sign-off · Sign-offs complete · Blocked by veto · Closed.

03Prerequisites

If any mandatory prerequisite is Not met or Pending, the sign-off round is not opened.

# Prerequisite Evidence Status (Met · Not met · Not applicable · Pending)
1 G4 approved and its conditions fulfilled P29 for G4 · P21 block 5
2 Delivery report verified P21
3 Validation and pilot results verified P22
4 Rollback test passed P19 block 10
5 Security and prompt injection tests executed and critical findings resolved P18 block 11
6 Risk register updated; no Critical residual risk without board approval P12
7 Regulatory classification and applicable impact assessments completed P11
8 Human oversight operational and supervisors trained P17 · P20
9 Operations manual, monitoring and incident response plan available P24 · P25 · P26
Sphere map and ambition levels (10) AI system inventory updated P05 · T02
Maturity model (11) Supplier contracts and guarantees in force (Enterprise) P14

04Scope of what is authorised

Field Content Guidance
Authorised version Model, instructions and configuration (P16). Any other version requires a new sign-off.
Population and perimeter Areas, channels, countries, customers or cases included.
Authorised autonomy level May not exceed that in P17.
Phased deployment Yes · No. If Yes, stages and criterion for moving from one to the next.
Planned go-live date
Enhanced monitoring period (Enterprise) Duration and what is monitored more frequently.

05Multi-level sign-offs

Position: Favourable · Favourable with conditions · Veto.

Signatory What they attest Name and position Date Position Reason Evidence reviewed
AI Technical Owner The solution delivered corresponds to the approved design, the technical tests are valid and rollback works.
Risk and compliance Risks are assessed and treated within the risk appetite; the applicable regulatory obligations are covered.
Information security Security controls, including those for agents, are implemented and tested.
Data protection The processing has a legal basis, the relevant impact assessments have been carried out and the rights of individuals are respected.
AI Operations Owner (recommended) Operations are ready to take on the system.
AI Sponsor Takes responsibility for the value and the investment and accepts the conditions. Does not replace or override any previous sign-off.

Example of a completed row (illustrative example):

Signatory What they attest Name and position Date Position Reason Evidence reviewed
Data protection Legal basis, assessments and rights Data Protection Officer 12-05-2026 Favourable with conditions Processing compliant; the privacy notice for the web channel still needs to be updated, a non-critical aspect because the channel is not activated until the second stage of the deployment P11 v1.2, P16 v1.0

06Conditions of the sign-offs

# Signatory imposing it Condition Does it affect a critical control? (must be No) Owner Deadline How it will be verified Status (Open · Fulfilled · Expired)
1
2

The conditions are carried over to P29 so that the body deciding G5 adopts them. An expired condition that has not been fulfilled turns the outcome into Iterate (01 §7.4, rule 4).


07Outcome of the sign-off round

Field Content Guidance
Outcome All favourable · Favourable with conditions · Blocked by veto.
Vetoes recorded Signatory, reason and what must be resolved to lift it.
Closing date of the round
Referral to the deciding body AI Committee (Enterprise) · Sponsor with risk clearance (Lite). Reference to P29.
Effective go-live date Completed after the G5 decision.

08History of changes of position

Every change to a sign-off is recorded; the previous sign-off is not overwritten.

Date Signatory Previous position New position Reason for the change Evidence

09Quality criteria

Formal G5 criteria in document 21; checklist LV-G5 in document 22.

# Check Status (Met · Not met · Not applicable · Pending)
1 The mandatory prerequisites are Met before the first sign-off.
2 At Enterprise, the four mandatory sign-offs are recorded, each with a date, position and reason.
3 No condition affects critical controls for security, compliance or human oversight.
4 Second-line signatories do not belong to the team that builds.
5 There is no veto in force at the time of the G5 decision.
6 The authorised scope matches the version and autonomy level tested.
7 The sign-offs pre-date the G5 decision date and the go-live.

10Approval and verification

Function Role Name Date Signature or reference
Preparation of the record AI Office
Verifier AI Office (Lite) · AI Auditor (Enterprise)
G5 decision-maker Sponsor with risk clearance (Lite) · AI Committee (Enterprise)
☐ Statement: "The organisation confirms that the regulatory classification and compliance have been verified with qualified advice and accepts responsibility for them; SEVEN-G is only a methodological reference." G5 decision-maker

Segregation of duties: the verifier is not part of the team that builds. At Enterprise, the AI Auditor does not sign in block 5. At Lite, 01 §7.5 assigns verification to the AI Office and risk clearance to the AI Risk Owner, who cannot both verify and grant clearance.


11Version control

Version Date Changes
0.1 16-09-2026 First version of the template. Consistency adjustments with 01 (segregation of duties at Lite, R6 outcomes, agents criterion) and with 34 and 37.