Template P16 · Data and model lineage

Data and model lineage

Records where the data come from, how they are transformed and which models and versions are involved, so that any output of the system can be explained, reproduced and rolled back.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used Phase 4 (Solution design), before requesting G4. It is updated in phase 5 with the versions actually deployed and in phase 6 with every change to data, model, prompts or knowledge base.
Who completes it AI Technical Owner, with the owners of the source data.
Who verifies it AI Office under Lite; AI Auditor under Enterprise (01 §7.5). The AI Risk Owner reviews the legal basis and the restrictions on use.
At which gate it is reviewed G4. It is checked again at G5 (deployed versions) and at every R6 continuity review.
Lite versus Enterprise Lite may omit the fields marked (Enterprise). If the system is classified as high-risk, all fields are completed regardless of intensity.
Relationship P05 Inventory record · P11 Regulatory classification · P15 Architecture record · P19 Rollback plan · P27 Incident and change log · P30 Scale or retire decision · P64 Dataset record and knowledge source inventory · documents 51 and 53.

Completion rules:

This template does not constitute legal advice. The legal basis for processing must be validated by data protection.


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN from the use case register (T01).
Use case name Short, understandable name.
AI system(s) Identifier in the AI system inventory (T02, P05).
Intensity Lite · Enterprise (P04).
Regulatory classification Prohibited · High risk · Transparency obligations · Minimal risk · Out of scope · Pending classification (P11).
Document version 0.1, 0.2…; 1.0 upon approval. Each change in production increments the version.
Author Role and name.
Date DD-MM-AAAA.
Document status Draft · Submitted for verification · Verified · Approved · Superseded.

03Data sources

One row per source. Data type: Personal · Special categories · Confidential · Internal · Public · Synthetic. Legal basis (GDPR Art. 6): Consent · Contract · Legal obligation · Vital interests · Public interest · Legitimate interest · Not applicable (no personal data).

ID Source and source system Data owner Data type Legal basis Restrictions on use Update frequency Quality verified (Yes · No · Partial)
F-01 (illustrative example) Maintenance incident history, work order table of the asset management system Head of maintenance Internal Not applicable Internal use only; not shared with suppliers Daily Partial: 4 % of records without a fault code
Supplementary field Content Guidance
Third-party or acquired data Supplier, licence and conditions of use for AI.
Transfers outside the European Economic Area (Enterprise) Destination, safeguard applied and reference to the supplier assessment (P14).
Data protection impact assessment Carried out · Not required (with justification) · Pending. Link to P11.

04Datasets and transformations

Use: Training · Fine-tuning · Validation · Testing · Knowledge base (retrieval) · Inference · Monitoring.

Dataset ID Use Sources (ID) Main transformations Version or fingerprint Period covered Volume Bias and representativeness controls (Enterprise) Location and retention
CD-01 (illustrative example) Training F-01, F-02 Removal of duplicates; imputation of dates; pseudonymisation of the technician v3 · fingerprint recorded in the data repository 01-2023 to 12-2025 180,000 records Distribution by plant and asset type compared with the population Analytics repository; 5 years

05Models and components

Model type: In-house trained · In-house fine-tuned on a base model · Third-party via API · Third-party deployed on own infrastructure · General-purpose model · Rules (not AI). Status: In development · Validated · In production · Retired.

Model ID Type Supplier and exact version Datasets used Purpose Reference metrics Known limitations Status
M-01 (illustrative example) In-house trained Internal · v1.4 CD-01, CD-02 Estimate the probability of failure within 30 days Discrimination and calibration metrics recorded in P22 Poor performance on assets with less than 6 months of history Validated

Generative AI and agent components (if applicable):

Component Identifier and version Owner Location What a change requires
System prompts Regression testing and recording in P27.
Knowledge base Content review, cut-off date and access permissions.
Agent's connected tools Permissions review in P18.
Generation parameters (Enterprise) Regression testing.
Cost fallback model (document 52 §10.3), if planned Provider and exact version; evaluated before G5 with the reference set and the bias tests of the primary model. Adding it or changing its conditions is a change (document 52 §6.4).

06End-to-end journey

Describe, in order, how a source data item becomes an output of the system. One row per step; no text diagrams.

Step Input Process Output Record that evidences it
1 (illustrative example) F-01 Nightly extraction Dated raw copy Load process log
2 (illustrative example) Raw copy CD-01 transformations CD-01 v3 Dataset fingerprint
3 (illustrative example) Data for the day Inference with M-01 v1.4 Prioritised list of assets Inference log with model version

07Reproducibility and traceability of outputs

Field Content Guidance
Can each output be linked to the version of the model, data and prompts? Yes · Partially · No. If not, it is a finding for G4.
Automatic logs retained What is logged (input, output, version, date, user). In high-risk systems, align with the record-keeping obligations of the EU AI Act (document 34).
Log retention period Period set by the company, not shorter than that required by applicable regulation.
Ability to retrain or regenerate a previous version (Enterprise) What is kept to reconstruct a version (code, data, parameters).
Reference for detecting drift Dataset and period used as the reference for monitoring (P25). For generative AI and agents, usage reference: topics, intents and scope validated at G5 (document 52 §4.2.6).

08Treatment in the event of rollback or retirement

Field Content Guidance
Previous stable version available Identifier of the model and components to be reverted to (P19).
Data that must be retained Due to legal obligation, audit or legal defence.
Data that must be deleted or anonymised Includes copies held by suppliers.
Supplier obligations on termination (Enterprise) Return, certified deletion, no reuse for training. Detailed in P30.

09Quality criteria

The verifier checks, as a minimum, the following. The formal G4 criteria are in document 21 and checklist LV-G4 in document 22.

# Check Status (Met · Not met · Not applicable · Pending)
1 All sources have an owner, data type and legal basis where there are personal data.
2 Each dataset has a version or fingerprint and a period covered.
3 Each model and component has an exact version, including third-party ones.
4 The end-to-end journey makes it possible to link an output to its versions.
5 Known limitations are declared and carried over to P17 and P24.
6 There is an identified previous version for rollback.
7 The template existed and had been verified before G4 was requested.

10Approval and verification

Function Role Name Date Signature or reference
Author AI Technical Owner
Legal basis review Data protection or AI Risk Owner
Verifier AI Office (Lite) · AI Auditor (Enterprise)
Gate decision-maker According to 01 §7.5 (recorded in P29)

Segregation of duties: the verifier is not part of the team that builds and is not the same person as the author (01 §7.4 and §8.2).


11Version control

Version Date Changes
0.1 16-09-2026 First version of the template.
0.1 18-09-2026 Cost fallback model in the components and usage reference for drift in generative AI and agents (document 52 §4.2.6 and §10.3).

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.