SEVEN-G
Template P15 · 16-09-2026

Template P15 · Architecture record

Architecture record

Documents the solution architecture, the design decisions with their alternatives and the traceability between the phase 3 risks and requirements and the designed controls.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used In phase 4 (Solution design), before G4. It is kept alive in phases 5 and 6: every relevant architecture change adds a decision and updates the version.
Who completes it The AI Technical Owner, who is accountable for and carries out the work in phase 4. Information security, the AI Operations Owner and the AI Risk Owner are consulted.
Who verifies it Lite: AI Office. Enterprise: AI Auditor.
Who decides Lite: AI Technical Owner with risk clearance (01 §7.5). Enterprise: AI Committee.
Gate at which it is reviewed Design. It is checked again at G5 (what was built matches what was designed) and at R6 (changes). (G4)
Tool It has no tool of its own; it is linked as evidence in T03.
Lite versus Enterprise Lite may omit the fields and blocks marked (Enterprise). The overview, the components, the decisions and the traceability of controls are mandatory in both.

Completion rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN.
AI systems covered Codes from P05.
Regulatory classification and intensity From P11 and P04.
Autonomy level A0 · A1 · A2 · A3.
Document version
Date DD-MM-AAAA.
Author Name and role.

03Overview

Field Content Guidance
Solution description What it does, for whom and how it fits into the process, in plain language.
Context diagram Link to the diagram: users, external systems, suppliers and solution boundaries.
Component diagram Link to the diagram of components and main flows.
Scope of this version What the design includes and what is left for later versions.
P02 constraints applied Mandatory platforms, data location, maximum autonomy, red lines.

04Components

Component Function Type Supplier or team Version Hosting environment Data processed Criticality
Model · Orchestration · Data · Integration · Interface · Control · Monitoring Low · Medium · High
(illustrative example) Language model Draft responses based on the order information Model Supplier X (P14, N2) Version pinned by contract Supplier's cloud, EU region Enquiry text and order data High
(illustrative example) Order lookup service Return only the authenticated customer's orders Integration Internal team 1.0 Corporate cloud Order data High
(illustrative example) Output filter Block personal data not belonging to the customer Control Internal team 1.0 Corporate cloud Generated response High

05Models

Summary; details of versions, training data and evaluations go in P16.

Model Type Origin Use Selection criterion Evaluation performed Planned replacement
Predictive ML · Generative AI · Agent · Other In-house · Third-party · Open source Metrics and date

06Data flows and integrations

Flow Source Destination Data Frequency Protection in transit Transfer outside the EEA
Real time · Batch Yes · No

Details of sources, transformations and versions in P16.


07Architecture decisions

One row per relevant decision. Decisions are not deleted: if they are superseded, the previous one is marked as superseded.

No. Decision Context Alternatives considered Reason for the choice Consequences and risks Date Status
DA-01 Proposed · Approved · Superseded by DA-NN
(illustrative example) DA-01 The model does not access the order system directly; it only receives the data returned by an intermediate service. Risk of leakage of other customers' data (P12, R01). Direct access by the model through a tool; retrieval over an index containing all orders. Limits by design the available data to those of the authenticated customer. Higher latency; maintenance of the intermediate service. 20-01-2027 Approved

08Traceability of risks, obligations and controls

Each risk in P12 that requires treatment and each obligation in P11 must have at least one designed control.

Risk or obligation Origin Designed control Component Detail template How it will be tested in phase 5
P12 R.. · P11 P16 · P17 · P18 · P19 · P25
(illustrative example) Leakage of another customer's data P12 R01 Intermediate service with filtering by authenticated customer and output filter Order lookup service; output filter P18 300 injection attacks with no leaks
(illustrative example) Disclose that the person is interacting with an AI system P11 §10 Notice at the start of each conversation Interface P17 Functional review

09Non-functional requirements

Requirement Target How it is measured Responsible component
Availability
Response time
Capacity and volume
Cost per transaction
Activity logging and traceability What is logged, where and for how long it is retained
Accessibility (Enterprise)

10Oversight, security, operation and reversibility

Field Content Guidance
Human oversight points Where a person intervenes and what is never delegated. Details in P17.
Identity and permissions of the system or agent Accounts, least permissions, limits on action. Details in P18.
Stop mechanism How the system is stopped, who can do so and how quickly.
Rollback How to return to the previous version or to the process without AI. Details in P19.
Monitoring Technical, quality, cost and security metrics. Details in P25.
Environments Development, testing, pre-production and production; data separation.
Change management (Enterprise) How changes to the model, prompts or configuration are approved.

11Estimated operating cost (Enterprise)

Category Annual recurring cost (€) Assumptions Change from P10
Licences
Model consumption
Compute and infrastructure
Operations people
Suppliers and services
Control and compliance

If the recurring cost significantly exceeds that in P10, P08 is updated and this is reported at G4.


12Quality criteria

The formal G4 criteria are in document 21 (see criteria G4.xx).

# Check Status
1 The overview and the linked diagrams reflect the complete solution, including suppliers. Met · Not met · Not applicable · Pending
2 Each component has an owner, version, hosting and data processed.
3 Relevant decisions have alternatives and a reason.
4 Every risk in P12 that requires treatment and every obligation in P11 has a designed control and a means of testing.
5 There is a stop mechanism and a rollback path.
6 The permissions of the system or agent are limited to what is necessary and do not exceed the maximum autonomy in P02.
7 The P02 constraints (location, platforms, red lines) are respected.
8 P16, P17, P18, P19 and P25 exist and are consistent with this record.

13Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Prepares and is accountable AI Technical Owner
Consulted Information security · AI Operations Owner · AI Risk Owner
Issues clearance AI Risk Owner
Verifies AI Office (Lite) · AI Auditor (Enterprise)
Decides AI Technical Owner with risk clearance (Lite) · AI Committee (Enterprise)

Segregation of duties: under Lite, the AI Technical Owner decides G4 on their own design only because 01 §7.5 allows it with risk clearance and independent verification by the AI Office; both must be on record before the decision.


14Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 16-09-2026 First version. Register of components, architecture decisions and traceability of risks and obligations to controls, aligned with 01 §6.6.