Template P22 · Validation and pilot results

Validation and pilot results

Gathers the results of the tests and of the pilot under real conditions, and compares them with the thresholds and the value hypothesis set before investing.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used Phase 5 (Delivery and validation), after performing the tests and the pilot and before requesting G5.
Who completes it AI Product Owner (pilot and value) and AI Technical Owner (tests).
Who verifies it AI Risk Owner under Lite; AI Auditor under Enterprise. Value is validated by management control when it is declared as validated.
At which gate it is reviewed Go-live. (G5)
Lite versus Enterprise Lite may omit the fields marked (Enterprise).
Tool T11 Value hypothesis canvas and calculator.
Relationship P08 Value hypothesis canvas · P09 Baseline · P17 Human oversight · P18 Security design · P19 Rollback test · P20 Adoption · P21 Delivery report · P28 Value monitoring · document 40.

Rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
AI system(s) and version tested Identifier (T02) and version (P16).
Ambition level Optimise · Augment · Transform.
Intensity Lite · Enterprise.
Document version
Author Role and name.
Date DD-MM-AAAA.
Document status Draft · Submitted for verification · Verified · Approved · Superseded.

03Test results

Test type: Functional · Model performance · Bias and non-discrimination · Robustness · Security · Prompt injection · Load and latency · Usability · Human oversight · Rollback. Result: Passed · Passed with observations · Failed · Pending.

Test type Metric Acceptance threshold and date on which it was set Result obtained Status Evidence
Model performance (illustrative example) Proportion of correct classifications on an independent test set ≥ 90 % · set in P08 on 03-03-2026 92.4 % Passed Evaluation report v2
Bias and non-discrimination (illustrative example) Difference in error rate between age groups ≤ 3 points 4.1 points in the over-65 group Failed Bias report v1
Prompt injection P18 block 11
Rollback Time to safe state Target time from P19 P19 block 10

Every Failed test indicates its treatment and whether it blocks go-live:

Failed test Does it affect a critical security, compliance or human oversight control? (Yes · No) Treatment Owner Date

04Specific evaluation of generative AI and agents (Enterprise)

Aspect Evaluation method Sample Result Threshold Status
Responses grounded in the authorised sources
Fabricated or incorrect content
Inappropriate content or content contrary to the use policy
Leakage of confidential or personal information
Agent actions within limits and purpose

05Pilot design

Field Content Guidance
Period Start and end dates.
Population and scope Area, cases, users and affected persons included.
Attribution method The one approved in P08: control group · before and after · other, justified.
Control or reference group Composition and how it was assigned.
Sample size and justification (Enterprise) Why the size makes it possible to distinguish the effect from noise.
Autonomy level during the pilot A0 · A1 · A2 · A3 (P17).
Deviations from the pilot design Changes during the pilot and their effect on the validity of the results.

06Pilot results against the hypothesis

Metric Baseline (P09) Target Success threshold Pilot result Control group result Attributable difference Does it meet the threshold? (Yes · No · Partially)
Primary metric:
Secondary metric:
Adoption (P20) — —
Human override rate — —

07Observed value and projection

Type: Efficiencies · Return · Recurring cost. Status: Validated · Declared · Estimated.

Item Type Formula (units × unit value) Amount in the pilot period (€) Status Annual projection (€) Status of the projection
Materialised reduction in processing time (illustrative example) Efficiencies 2,300 cases × €3.10 of external cost avoided per case 7,130 (3-month pilot) Declared 28,520 (× 4 quarters, same volume) Estimated
Model consumption and licences (illustrative example) Recurring cost 3 months × €1,900 5,700 Validated 22,800 Estimated
Magnitude Projected annual amount (€) Status
Efficiencies
Return
Recurring cost
Annual net value = efficiencies + return − recurring cost Estimated
Released capacity (hours, not added)
Risk avoided and compliance (not added unless there is a formula)

08Stop criteria

Stop criterion set in phase 2 Threshold Result Has it been triggered? (Yes · No)

If any criterion has been triggered, the team must recommend Stop or justify to the body that authorised the use case why it proposes a different result.


09G5 criteria according to the ambition level

Level What G5 requires (01 §7.6) Evidence provided Status (Met · Not met · Not applicable · Pending)
Optimise Efficiency validated against the baseline; plan to materialise the released capacity.
Augment Actual adoption and performance improvement measured.
Transform Market or customer evidence: use, conversion, initial revenue or verified operational change.

10Team conclusion and recommendation

Field Content Guidance
Conclusion Does the hypothesis hold under real conditions?
Recommendation to the gate Proceed · Proceed with conditions · Iterate · Stop. Pivot is not possible at G5 (01 §7.3). It is a recommendation; the competent body decides in P29.
Proposed conditions Only on non-critical aspects, with a deadline and an owner.

11Quality criteria

Formal G5 criteria in document 21; checklist LV-G5 in document 22.

# Check Status (Met · Not met · Not applicable · Pending)
1 The thresholds and stop criteria are those set in phase 2, dated before the pilot.
2 The pilot has been carried out under real conditions with the approved attribution method.
3 The bias, robustness, security and prompt injection tests have been performed.
4 Every amount has a formula, type and status; the annual projection is shown as estimated.
5 Released capacity is reported separately and is not added.
6 Failed tests on critical controls have been resolved.
7 The recommendation is consistent with the results and with the stop criteria.

12Approval and verification

Function Role Name Date Signature or reference
Author (pilot and value) AI Product Owner
Author (tests) AI Technical Owner
Validation of amounts Management control
Verifier AI Risk Owner (Lite) · AI Auditor (Enterprise)
Gate decision-maker According to 01 §7.5 (recorded in P29)

Segregation of duties: the verifier and whoever validates the amounts are not part of the team that builds.


13Version control

Version Date Changes
0.1 16-09-2026 First version of the template.