SEVEN-G
Document 51 · 16-09-2026

Document 51 · Data and knowledge

Data and knowledge for AI

Data governance applied to AI, preparation by phase, lineage, personal data, knowledge sources and intellectual property

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review
2enabling spheres: data and knowledge
8phases with data requirements
19indicators with a formula
12common mistakes identified

01Purpose and scope

This document develops the enabling spheres 05 · Data and 06 · Knowledge of the impact map. It sets out what an organisation applying SEVEN-G must do to ensure that the data and knowledge used by AI are known, of sufficient quality, legally usable, traceable and protected.

It covers:

It does not replace the company's data governance policy or its data protection policy: it applies them to AI and indicates where AI demands more. The security of data against attacks is dealt with in document 35; contracts with suppliers, in document 36.

This document does not constitute legal advice.


02Spheres 05 and 06

2.1 Reference questions

Sphere Question for the board
05 · Data Do we know what data we have, who is accountable for its quality and whether we can legally use it for AI?
06 · Knowledge How much critical knowledge depends on a few people and is not available to the organisation?

Both spheres are enablers: they rarely generate value on their own, but without them use cases in spheres 01 to 04 fail or cannot be defended before an auditor or a regulator.

2.2 Ambition levels

The examples are illustrative.

Level 05 · Data 06 · Knowledge
Optimise Assisted cleansing, normalisation and deduplication; cataloguing with automatically generated and reviewed metadata; continuous quality monitoring. Semantic search over internal documentation; FAQ bases maintained with the help of AI; meeting summaries that preserve decisions.
Augment Synthetic data where real data are scarce or sensitive; enrichment with governed external sources; natural language data querying with access controls. Capture of experts' tacit knowledge; knowledge assistants by domain (legal, technical, regulatory, product); detection of patterns of success and failure in the organisation.
Transform Data become a product or service; federated data architecture with automated governance; up-to-date representation of the entire operation. Organisational knowledge is used as an active and differentiating capability; the company retains and reuses what it has done, decided and learned.

In sphere 05, the Transform level requires particular attention to the legal basis, third-party rights and regulatory classification, because it changes the purpose for which the data were collected.

2.3 What is assessed

In sphere 05, the following are assessed: ownership (DAT-01), catalogue (DAT-02), legitimacy (DAT-03), quality (DAT-04, DAT-05, DAT-09), traceability (DAT-06), readiness (DAT-07, DAT-10) and retention (DAT-08). In sphere 06: sources (CNC-01, CNC-02, CNC-05), quality in use (CNC-03, CNC-04, CNC-08) and dependence on a few people (CNC-06, CNC-07). The indicators are defined in section 12.

These dimensions feed D3 Data and knowledge in the maturity model (document 11).


03Principles

# Principle What it implies
1 No data without an owner Every dataset or knowledge source used by an AI system has an identified business owner.
2 Quality is defined for the use Data that are sufficient for a report may be insufficient to train a model. Thresholds are set per use case.
3 Using data for AI is a purpose The legal basis and purpose compatibility are analysed before the data are used, not afterwards.
4 The minimum necessary Only the data and attributes needed are used, for the time needed.
5 Everything is traceable It is possible to reconstruct which data, which model version and which sources produced an output.
6 AI does not extend permissions An AI system does not give access to information that the person using it could not see by other means.
7 Knowledge expires Every knowledge source has a review date and an owner responsible for its validity.
8 Third-party rights are respected Data and content are not used without sufficient title for the specific use.

04Data governance applied to AI

4.1 Roles

Role Responsibility in AI
Data owner (business) Authorises use for a specific use case (at G3), defines acceptable quality and is accountable for the purpose.
Data custodian (technology) Applies access, quality, retention and backup controls; supports the AI Technical Owner.
AI Technical Owner Is accountable for the use case's data and models, their preparation and their lineage.
Data protection officer Advises and monitors in processing of personal data; consulted on the impact assessment (phases 3–4); data protection takes part in the multi-level go-live sign-off at G5.
Content or knowledge owner Quality, validity and permissions of generative AI sources (document 50, section 4.2).
AI Risk Owner Assesses RT-DAT risks and issues risk clearance.

4.2 Dataset record for AI

Every dataset used to train, fine-tune, validate, test or feed an AI system in production must be catalogued with at least the following fields. If the company already has a data catalogue, the record is implemented as an extension of that catalogue.

Field Content
Identifier, name, owner and custodian Principle 1.
Description and origin What it contains, which systems it comes from, how it was generated; whether it is synthetic (section 8).
Period and volume Dates covered and number of records.
Personal data Yes or no; categories, special categories, minors; review by the data protection officer.
Legal basis and authorised purposes By purpose, with a compatibility analysis if the purpose is new (section 9).
Use and confidentiality restrictions Contractual, licensing, sectoral, territorial (section 11); classification.
Quality Dimensions measured, result and date (section 4.3).
Representativeness and known biases Populations covered and under-represented; mandatory for high risk (section 6).
Retention Period and rule for deletion or anonymisation (section 4.5).
Systems using it Use cases and model versions; link to P16 and T02.
Version Version and freeze date if used for training.

4.3 Quality

Dimension Question Example rule
Accuracy Does it reflect reality? Sample verified against the primary source.
Completeness Are values or records missing? Proportion of nulls per critical attribute.
Consistency Is it consistent across systems and over time? Reconciliation of totals between source and target.
Timeliness Is it up to date for the use? Maximum age of the latest record.
Validity Does it comply with format and domain? Values within permitted lists and ranges.
Uniqueness Are there duplicates? Duplicate records by business key.
Representativeness Does it cover the population and the situations in which the system will be used? Distribution by segment compared with the population of use.
Label quality Are the labels used for learning correct? Inter-annotator agreement on a sample.

Thresholds are set in phase 3 for each critical dataset and become monitoring controls in phase 6 (document 52, section 5).

4.5 Retention

Element Rule
Training, validation and test data Retained frozen and versioned while the model is in use and for the period needed to reconstruct or audit, within the limits of the legal basis. If they cannot be retained, a description sufficient for traceability is retained.
Input data and outputs in production According to the log retention period (document 52, section 11) and minimisation.
Prompts and conversations with generative AI Defined and communicated period; not retained indefinitely by default.
Indexes and vector representations Follow the period of the source they come from; if the source is deleted, its representation is deleted.
When a system is retired The treatment of data and models decided at G7 is applied (document 52, section 12).

05Data preparation by phase

5.1 Requirements by phase

Phase What is done with the data Evidence Stop question
0 · Context Declare known data constraints: protected data, international transfers, secrets, licences. P02 Is there a constraint that prevents the use case?
1 · Discovery Identify what data or knowledge would be needed and whether they exist. P06 Does the opportunity depend on data that do not exist?
2 · Hypothesis Confirm that the baseline can be measured with real data. P09 Can the baseline be measured?
3 · Feasibility Availability and quality assessment with real data; legal basis; third-party rights; representativeness. P10, P11 Are there sufficient data, of sufficient quality and legally usable?
4 · Design Lineage, dataset records, quality controls, minimisation, retention, knowledge source permissions. P15, P16, P18 Does the design treat the data with sufficient controls?
5 · Delivery Freeze and version datasets; quality, bias and data leakage testing; validate knowledge sources. P21, P22 Do the results hold with production data?
6 · Operation Monitor quality, drift and validity; manage data incidents. P25, P27 Has quality degraded or has the legal basis changed?
7 · Evolution or retirement Review whether the data allow scaling; treat data and models on retirement. P30 Do the data support the extended scope?

5.2 Phase 3: the assessment that prevents the most stops

SEVEN-G starts from the premise that lack of data availability or quality is the main cause of failure of AI use cases that do not reach production or do not sustain their value. The framework does not base this premise on market figures, but on its logic: a data problem discovered in phase 5 costs the entire build. That is why the assessment is placed in phase 3, before investment in design and build, and indicator DAT-07 makes it possible to test the premise against each company's own data.

Rule. The phase 3 data assessment must be carried out with real data or with a representative sample extracted from the source systems, not with descriptions of what the data should contain. An assessment based only on interviews or data dictionaries does not pass G3.

Block Checks
Existence and access The data exist; authorised access to a sample has been obtained; the cost and timeframe of full access are known.
Volume and history There are sufficient records and period for the type of system; there are sufficient cases of the relevant situations, including minority ones.
Measured quality Results by dimension (section 4.3) on the sample, against proposed thresholds.
Labels or ground truth There is a way of knowing whether the system is right: historical labels, expert review or observable outcome, and with what delay.
Representativeness The sample covers the population and the contexts of use; known biases documented.
Legitimacy Legal basis and purpose; compatibility analysis; special categories; transfers; licences and third-party rights.
Availability in production The data used for building will be available in production with the same definition, frequency and latency.
Knowledge (generative AI) Sources identified, with known owner, validity and permissions; proportion of outdated content.
Preparation cost Estimated effort for cleansing, integration, labelling and curation, included in the full cost (document 42).

Result. Each block is rated as sufficient, sufficient with actions (action, cost, timeframe and owner) or insufficient. An insufficient legitimacy block prevents proceeding. If other blocks are insufficient, the expected outcome of G3 is Iterate, Pivot or Stop with the coded reason Insufficient data (document 03, section 3.3).


06High-risk systems: Article 10 of the EU AI Act

This section summarises, without legal detail, what Article 10 of the EU AI Act requires of the training, validation and test datasets of high-risk systems, and where it is reflected in SEVEN-G. The obligation-by-obligation analysis, the application dates (Annex III from 2 December 2027 and Annex I from 2 August 2028, following Regulation (EU) 2026/1744) and the other amendments are dealt with in document 34 (§3.1 and §3.2).

Requirement in summary Where it is reflected in SEVEN-G
Data governance and management practices appropriate to the intended purpose: design choices, origin and original purpose of the data, preparation (annotation, labelling, cleaning, updating, enrichment, aggregation), assumptions about what the data measure and represent. Dataset record (4.2); P16.
Prior assessment of the availability, quantity and suitability of the datasets needed. Phase 3 assessment (5.2); P10.
Examination of possible biases likely to affect health, safety or fundamental rights or lead to discrimination, and measures to detect, prevent and mitigate them. P22 (bias testing); document 50, section 8.4; P12.
Identification of data gaps or shortcomings and how they can be addressed. Phase 3 assessment; recorded actions.
Datasets that are relevant, sufficiently representative and, to the best extent possible, free of errors and complete in view of the intended purpose. Quality (4.3) with thresholds per use case.
Consideration of the characteristics of the geographical, behavioural, contextual or functional setting of use. Representativeness and availability in production blocks (5.2).
Exceptional processing of special categories of personal data to detect and correct biases, subject to strict conditions and safeguards. Section 9.4; decision documented with the data protection officer.

When the company acts as the deployer of a supplier's high-risk system, it must ensure that the input data under its control are relevant and sufficiently representative in view of the intended purpose (Art. 26(4)), and require the necessary information from the supplier (document 36).

This document does not constitute legal advice.


07Data and model lineage (P16)

7.1 What it is and what it is for

Lineage makes it possible to answer, for any output of an AI system: which data, which transformations, which model version, which configuration and which knowledge sources produced it. It is the basis for investigating incidents, handling individuals' rights, auditing, reproducing results, managing changes and retiring systems.

7.2 Minimum content

Element Content Lite Enterprise
Sources Source systems, datasets (with record) and knowledge sources. Yes Yes
Transformations Preparation steps, rules, versioned code. Summary Detail with version
Training, validation and test sets Frozen version, date, split criterion. If there is in-house training Yes
Model Type, version, configuration parameters, training date, validation results. Yes Yes
Third-party model Supplier, exact version identifier, adoption date, data use terms. Yes Yes
System prompts and templates (generative AI and agents) Prompt version, available tools, filters. Yes Yes
Retrieval indexes Indexed sources, indexing date, chunking and retrieval parameters. If there is retrieval Yes
Consumers Processes, systems and decisions that use the outputs. Yes Yes
Link to logs Which identifiers make it possible to link a specific output to the above versions. Recommended Yes

7.3 Rules

  1. P16 is prepared in phase 4 and must be current for G5.
  2. Any change in sources, transformations, model, prompts or indexes updates P16 and is recorded in P27 (document 52, section 6).
  3. Lineage is generated automatically wherever the platform allows; manual documentation is limited to what cannot be captured.
  4. A system in production without current lineage is a nonconformity (minor if it does not affect decisions; major if the system is Enterprise).

08Synthetic data

8.1 When they make sense

Use Illustrative example Value
Supplementing scarce cases Infrequent situations that the model must recognise. Improved robustness.
Testing and development Test environments without real personal data. Lower exposure.
Stress and security testing Adversarial cases to evaluate an assistant or an agent. Better evaluation.
Sharing with third parties Suppliers that develop without access to real data. Lower contractual and privacy risk.

8.2 Risks and controls

Risk Control
False sense of anonymity: synthetic data generated from personal data may allow re-identification of, or inference of information about, real people. Re-identification risk assessment before treating them as non-personal; until this is demonstrated, they are treated as personal data.
Loss of fidelity: they do not reproduce relevant real relationships. Utility validation: comparison of distributions and of the performance of models trained with real versus synthetic data.
Amplification of biases in the source dataset. Bias testing on the synthetic dataset and on the resulting model.
Circular validation: validating a model with data generated by the same process that trained it. Final validation must be carried out with real data or with an independent real sample.
Contamination: unidentified mixing of real and synthetic data. Mandatory marking of synthetic origin in the record and in the lineage.

8.3 Rules

  1. Every synthetic dataset has its own record (4.2) indicating the source dataset, the generation method and its version.
  2. No G5 validation result is based solely on synthetic data.
  3. Synthetic data in use have a recorded utility and privacy validation (DAT-11).

09Personal data in training, prompts and outputs

9.1 In training and fine-tuning

Issue What SEVEN-G requires
Purpose and legal basis Documented in the record and verified by the data protection officer before G3.
Anonymisation versus pseudonymisation Only effectively anonymised data fall outside the GDPR. Pseudonymisation reduces risk, but the data remain personal. Anonymisation is justified with a re-identification risk analysis.
Memorisation Models trained with personal data may reproduce them in their outputs. Data extraction is tested in phase 5 when the model is trained or fine-tuned with personal data. The European Data Protection Board has analysed in its Opinion 28/2024 when an AI model can be considered anonymous; consulting it is recommended.
Data subjects' rights It is documented how access, rectification, erasure and objection are handled when the data have been used for training, and what this implies for the model (retraining, output filters or other measures).
Transparency Information to data subjects (GDPR, Arts. 13 and 14) covers use for AI when it is a new purpose.

9.2 In prompts and context

The prompts that employees write in generative AI tools, the documents they attach and the context that is retrieved automatically are data that leave the direct control of the person and, often, of the company.

Risk Control
Employees entering personal or confidential data into unauthorised tools. Acceptable use policy with a classification of the information permitted per tool (document 31); data leakage prevention controls; usage monitoring (T21).
Supplier retaining prompts or using them to train its models. Contractual terms verified in P14: no use for training, retention period, location, sub-processors (document 36).
Automatic retrieval of personal data not needed for the response. Minimisation in the retrieval design; personal data filters on input and output.
System prompts containing sensitive information. System prompts do not contain secrets or personal data; they are reviewed in P18.
Conversation logs retained without a time limit. Defined period (4.5) and restricted access.

9.3 In outputs

AI systems may infer personal data that nobody has provided (for example, traits, preferences or sensitive situations). An inference about an identified person is personal data. If the inference relates to a special category, its rules apply. The design (P17) must identify which inferences the system produces and whether they are necessary and lawful.

9.4 Data for detecting bias

Detecting bias may require data on protected characteristics that the company does not normally process. For high-risk systems, the EU AI Act exceptionally allows the processing of special categories for that purpose and with strict safeguards (Art. 10(5)), and Regulation (EU) 2026/1744 extends that possibility beyond high risk subject to a strict necessity criterion (document 34 §3.2). In all cases, the decision is taken with the data protection officer and the legal analysis, documented in P11, and measures such as separation, pseudonymisation, restricted access and deletion at the end of the analysis are applied.


10Knowledge

10.1 Knowledge sources for generative AI

When a generative AI system responds on the basis of the company's documents and content through retrieval (RAG, retrieval-augmented generation), the quality of the responses depends more on the sources than on the model. SEVEN-G treats each source as a governed asset.

Source inventory. Each system maintains the list of sources it uses, with:

Field Content
Source Repository, space, knowledge base or system.
Content owner Person or function accountable for quality and validity.
Scope Which parts are indexed and which are expressly excluded.
Content type Internal rules, procedure, product, technical, legal, commercial, historical.
Authority Official, supporting or informative source; what prevails in the event of contradiction.
Classification and permissions Confidentiality and source permissions model.
Validity Mandatory review date by content type.
Index update frequency Continuous, daily, weekly.
Rights Whether it includes licensed third-party content (section 11).

10.2 Admission criteria

A source should not be connected to a generative AI system if:

10.3 Curation and validity

Activity What is done Frequency
Initial clean-up Remove duplicates, superseded versions and drafts; mark the current document. Before G5
Minimum metadata Owner, publication date, review date, status (current, superseded, historical), authority. When each document is added
Validity review The content owner confirms, updates or withdraws documents that reach their review date. By type; indicatively, 6 months for procedures and 12 for stable content
Removal from the index Superseded or expired documents are removed from the index or marked as historical and excluded from retrieval by default. At each update
Gap detection Analysis of queries with no relevant document retrieved (CNC-08) to create or improve content. Monthly
Contradiction detection Review of documents that give incompatible answers on the same topic. Quarterly

Rule. A system that cites an expired document in a response on terms, prices, rules or procedures affecting customers or employees generates an incident that is classified using the S1–S4 scale (document 52, section 7).

10.4 Access permissions

Content retrieval is a route of access to information and must respect the same permissions as the source.

Risk Control
Overexposure: the assistant shows a person content that they could not open in the source. Filtering by user permissions at retrieval time, not only at indexing; specific testing in phase 5.
Excessive inherited permissions in the source, which AI makes visible. Review of source permissions before connecting it; AI makes it easy to find what was previously "hidden by obscurity".
Common index for groups with different permissions. Separate indexes or verified filtering by group.
Agents with their own permissions that retrieve information for users with fewer permissions. Agents act with the permissions of the user they serve, unless there is a justified design in P18 (document 35).
Permission changes in the source not carried over to the index. Permission synchronisation with a defined and monitored maximum time limit.

10.5 Assessment of the quality of knowledge in use

Aspect What is measured Indicator
Retrieval relevance Whether the documents retrieved are appropriate for the query. Evaluated on the evaluation set (document 52, section 4.2).
Faithfulness to sources Whether the statements in the response are supported by the retrieved documents. CNC-04
Use of expired content Whether documents that are no longer valid are cited. CNC-03
Gaps Queries without a relevant document. CNC-08
Source citation Whether the response allows the user to check the source. Design requirement in P17.

10.6 Critical knowledge dependent on a few people

Step Activity Result
1 · Identify critical domains Processes, products, systems or relationships whose knowledge is essential to operate or decide. List of critical domains (C1).
2 · Measure dependence For each domain: how many people master it, whether it is documented and usable, and departure risk (retirement, turnover, mobility). Dependence map (CNC-06).
3 · Prioritise Domains with two people or fewer, without usable documentation and with departure risk within the thesis horizon. Capture plan.
4 · Capture Structured interviews (which may be AI-assisted), recording of explanations, case reviews, documentation of decisions and exceptions. Content with owner and validity.
5 · Validate The expert and a second reviewer confirm that the content is correct and complete for its use. Validated content.
6 · Make available Incorporation as a governed source (section 10.1). CNC-07

Considerations regarding people. The capture of tacit knowledge is carried out with informed voluntary participation, recognition of the expert and clarity about the subsequent use of the content. It must not be presented or used as a step prior to dispensing with the person without the effect having been assessed in accordance with document 50. If recordings or transcripts contain personal data, the corresponding legal basis, information and retention apply.


11Intellectual property and third-party rights

Consultation carried out in September 2026. This is an area of evolving legislation and case law; it must be verified with specialist advice.

11.1 Input data and content

Situation Issue Control
Acquired or licensed data The licence may not permit use for training or feeding AI systems, or use by suppliers. Licence review before G3; restrictions in the record (4.2).
Content obtained from public sources on the internet The fact that content is accessible does not mean its use is free. In the European Union, text and data mining is subject to exceptions with conditions, and rightholders may reserve that use for purposes other than scientific research (Directive (EU) 2019/790, Arts. 3 and 4). Prior legal analysis; respect for rights reservations expressed in an appropriate manner; source record.
Customer or partner content Its use may be limited by contract and by confidentiality. Contractual verification; excluded by default.
The company's own trade secrets Entering them into third-party services may compromise the reasonable protection measures required for them to remain secret (Directive (EU) 2016/943; in Spain, Ley 1/2019 de Secretos Empresariales (Law 1/2019 on Trade Secrets)). Classification, authorised tools and contractual terms.
Open-source software and models Licences may impose conditions of use, attribution or purpose restrictions. Licence record in P15; review before G4.

11.2 Third-party general-purpose models

The EU AI Act requires providers of general-purpose AI models to put in place a policy to comply with copyright law, including rights reservations, and to publish a sufficiently detailed summary of the content used for training (Art. 53(1)(c) and (d)). A company that uses those models should request and retain that information in the supplier assessment (P14) and assess the contractual safeguards against third-party claims (document 36).

11.3 Generated outputs

Issue What SEVEN-G requires
Ownership Copyright protection of content generated with AI is uncertain and depends on the jurisdiction and the degree of human contribution. Content that the company needs to protect is generated with documented human contribution or protected by other means (contract, secrecy).
Reproduction of third-party works Outputs may reproduce protected content. In external uses (marketing, product, publications), human review and, where appropriate, detection tools are applied.
Supplier terms It is verified what rights the supplier grants over the outputs and what use the supplier may make of them.
Transparency Any applicable obligations to mark or disclose generated or manipulated content are met (document 34).

This document does not constitute legal advice.


12Indicators

The codes are provisional; their definitive IND- code is shown in the mapping table in document 41 (§21). Knowledge indicators use the CNC- prefix so that they are not confused with the IND-CON family (board) in document 41. Thresholds are indicative and to be calibrated. "No data" is not zero.

12.1 Sphere 05 · Data

Code Indicator Formula Frequency Source Indicative reference
DAT-01 Ownership coverage Datasets used by systems in production with an assigned owner ÷ datasets used by systems in production Quarterly Catalogue, T02 100%
DAT-02 Catalogue coverage Datasets used by AI with a complete record ÷ datasets used by AI Quarterly Catalogue 100% in Enterprise
DAT-03 Legal basis coverage Datasets with personal data used by AI with verified legal basis and purpose ÷ datasets with personal data used by AI Quarterly Catalogue, record of processing activities 100%
DAT-04 Quality by dimension Records that pass the dimension's rules ÷ records assessed (by dataset and dimension) According to load frequency Quality monitoring Threshold set per use case in phase 3
DAT-05 Critical datasets within threshold Critical datasets that meet all their thresholds ÷ critical datasets Monthly Quality monitoring ≥ 95%
DAT-06 Lineage coverage Systems in production with current P16 ÷ systems in production Quarterly T02, P16 100%
DAT-07 G3 decisions due to data G3 decisions with an Iterate, Pivot or Stop outcome and the reason Insufficient data ÷ G3 decisions Half-yearly T01, T03 For interpretation, not a target: very low may indicate a lax assessment; very high, poor opportunity selection
DAT-08 Retention compliance Datasets with a defined and applied retention period ÷ datasets used by AI Half-yearly Catalogue 100%
DAT-09 Incidents caused by data AI incidents whose root cause lies in data ÷ closed AI incidents Quarterly T08 Decreasing trend
DAT-10 Data access time Median days between a data access request for a use case and its authorised availability Quarterly Access requests Decreasing trend
DAT-11 Validated synthetic data Synthetic datasets in use with recorded utility and privacy validation ÷ synthetic datasets in use Half-yearly Catalogue 100%

12.2 Sphere 06 · Knowledge

Code Indicator Formula Frequency Source Indicative reference
CNC-01 Sources with an owner Knowledge sources connected to AI with a content owner ÷ connected sources Quarterly Source inventory 100%
CNC-02 Content validity Indexed documents within their review date ÷ indexed documents Monthly Source metadata ≥ 95%
CNC-03 Use of expired content Sampled responses citing documents that are no longer valid ÷ sampled responses with a citation Monthly Continuous evaluation Close to 0%
CNC-04 Faithfulness to sources Evaluated responses whose statements are supported by the retrieved sources ÷ evaluated responses Continuous or monthly Continuous evaluation Threshold per use case; shared with OPE-09
CNC-05 Improper exposure Findings of access to content without permission detected in testing or in production, per period Quarterly Permission testing, T08 0
CNC-06 Critical knowledge dependence Critical domains mastered by two people or fewer and without usable documentation ÷ critical domains Annual (C1, C5) Dependence map Decreasing trend
CNC-07 Capture coverage Dependent critical domains with captured and validated content ÷ dependent critical domains Half-yearly Capture plan As per plan
CNC-08 Queries without a relevant source Queries with no relevant document retrieved ÷ evaluated queries Monthly Continuous evaluation Decreasing trend

13Common mistakes

# Mistake Consequence How it is avoided
1 Assessing data in phase 3 using descriptions rather than real data. It is discovered in phase 5 that the data are not fit for purpose. Section 5.2.
2 Assuming that a system's data can be used for any purpose. Processing without a legal basis. Legitimacy as a blocking block at G3.
3 Building with data that will not be the same in production. Actual performance far below the validated performance. Availability in production block.
4 Having no way of knowing whether the system is right. Impossible to validate and monitor. Labels block.
5 Connecting an entire repository to an assistant. Drafts, old versions, overexposure. Sections 10.2 and 10.3.
6 Filtering permissions at indexing rather than at retrieval. Employees see what they should not. Section 10.4.
7 Treating pseudonymised or synthetic data as anonymous. Breach of the GDPR. Sections 8.2 and 9.1.
8 Not versioning training datasets. Impossible to reproduce or investigate. Sections 4.2 and 7.
9 Not updating the lineage. False lineage when an incident occurs. Section 7.3.
Sphere map and ambition levels (10) Using third-party content because it is on the internet. Intellectual property claims. Section 11.1.
Maturity model (11) Omitting the cost of preparation, labelling and curation. Inflated expected net value at G3. Section 5.2; document 42.
Transformation index (12) Capturing experts' knowledge without their informed participation. Poor content and loss of trust. Section 10.6; document 50.

14Typical data and knowledge risks

Codes and names from the typical risk catalogue in document 33; two of these risks appear there in other categories (LEG, ORG).

Code (document 33) Risk Main controls
RT-DAT-01 Insufficient quality: insufficient data or data of inadequate quality for the purpose. Phase 3 assessment with real data; thresholds and monitoring.
RT-DAT-03 Lack of legal basis or incompatible purpose in the use of personal data. Record, verification by the data protection officer, impact assessment.
RT-DAT-02 Non-representative data and bias that produce discriminatory outcomes. Representativeness, bias testing, section 9.4.
RT-DAT-04 Unknown lineage: loss of traceability of data and models. P16 current and updated with every change.
RT-DAT-05 Data exposure in the AI lifecycle: leakage of personal or confidential data through prompts, retrieval or memorisation. Sections 9.2 and 10.4; extraction testing.
RT-DAT-06 Obsolete or contradictory knowledge in responses. Curation and validity; CNC-02 and CNC-03.
RT-LEG-06 Infringement of intellectual property or other third-party rights through the data or content used. Section 11; supplier assessment.
RT-ORG-02 Dependence on key people: loss of critical knowledge when people leave. Section 10.6; CNC-06 and CNC-07.

15Associated tools and templates

This document does not create a new tool. The dataset record and the knowledge source inventory are implemented in the data catalogue that the company already uses or, if none exists, in template P64 and as system attributes in T02.

Name Use in this document
Inventory, gates, risks, regulatory classifier (T02 · T03 · T06 · T07) Link between systems, data and lineage; G3 assessment; RT-DAT risks; high-risk obligations.
Incidents, suppliers, corporate use (T08 · T09 · T21) Incidents caused by data; supplier terms; data in unauthorised tools.
Context and constraints statement (P02) Phase 0 data constraints.
Feasibility assessment (P10) Data availability and quality assessment (section 5.2).
Regulatory classification and impact assessments (P11) Legal basis, data protection impact assessment, data for detecting bias.
AI supplier assessment (P14) Use of prompts and data by the supplier; copyright policy of general-purpose models.
Architecture record (P15) Licences for components and models.
Data and model lineage (P16) Main template of this document; uses the records and the source inventory in P64.
Security design (P18) Retrieval and agent permissions.
Validation and pilot results (P22) Quality, bias, data leakage and permission testing.
Monitoring and alert configuration (P25) Data quality and validity thresholds.
Dataset record and knowledge source inventory (P64) Record of each dataset and inventory of knowledge sources, if the company has no data catalogue.

Document Relationship
00, 01 and 03 · Foundations and register Spheres 05 and 06; data activities by phase; Insufficient data reason.
10, 11 and 20 · Spheres, maturity and phase manuals Spheres 05 and 06; dimension D3; requirements of section 5 in each phase.
31 · Corporate policy and acceptable use Information that may be entered into each tool.
33 · AI risk methodology Consolidation of RT-DAT risks.
34 · Regulatory mapping Article 10 of the EU AI Act, GDPR and intellectual property in detail.
35 · AI and agent security Protection of data against attacks; agent permissions.
36 · AI third parties and suppliers Clauses on data use, confidentiality and intellectual property.
41 · Indicator catalogue Consolidation of the DAT and CNC indicators (mapping table in 41 §21).
42 · AI costs Cost of preparation, labelling and curation (data category).
50 · People and organisation Capture of expert knowledge and employee data.
52 · AI operations manual Quality and drift monitoring, logs, changes and retirement.

17Version control

Version Date Changes
0.1 16-09-2026 First version. Develops spheres 05 and 06 with indicators; data governance applied to AI (roles, dataset record, quality, legal basis, minimisation and retention); data requirements by phase with the phase 3 assessment using real data; the summary of Article 10 of the EU AI Act; the content of P16; synthetic data; personal data in training, prompts and outputs; knowledge sources for generative AI, curation, validity, permissions and critical knowledge dependent on a few people; intellectual property; nineteen indicators with a formula, twelve common mistakes and eight typical risks. Consistency adjustments with 01 (segregation of duties in Lite, R6 outcomes, agents criterion) and with 34 and 37; risks aligned with the codes in document 33. Knowledge indicators renamed from CON- to CNC- to avoid the clash with the IND-CON family (board) in document 41.

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.