Template P40 · Exception request and register

Exception request and register

Processes each temporary exception to the policy or the framework with its justification, risk, compensating measures, approving body, conditions and expiry, and maintains the company's exception register.

Fernando García VarelaVersion 0.1 (working draft)19-09-2026Draft for review

Why it matters. An exception is a conscious decision not to comply with a requirement for a period of time, with the risk in view and an owner. Without a request and a register, exceptions become tolerated breaches that nobody approves or monitors, and the board committee cannot receive those in force each quarter, as 30 §7.4 requires. An expired exception that has not been closed is a major nonconformity (31 §3.8).

01Instructions for use

Aspect Guidance
When it is used Before ceasing to comply with any requirement of the corporate policy, the acceptable use policy or the framework that admits an exception. Never after the event.
Who completes it Whoever proposes according to the type (section 5): AI Product Owner, requesting area, AI Sponsor or AI Committee. The AI Office assigns the code and keeps the register.
Who verifies it The AI Office checks admissibility and completeness; the second line assesses the risk and issues clearance where required.
Who decides or approves The body in the delegation matrix of 30 §7.4, according to the type. Whoever proposes does not approve (30, I-9).
Stage, gate or moment At any time; those in force are reviewed at each monthly meeting of the AI Committee and reported quarterly to the board committee (C4).
Tool T01 · Use case register (exceptions linked to use cases and decisions, 30 §13).
Reference document 30 §7.4 and §8.3; 31 §3.7, §3.8 and §4; 37 §3.

Completion rules:


02Identification

Field Content Guidance
Code EXC-AAAA-NNN.
Date of request DD-MM-AAAA.
Requester and area
Type of exception Minor methodological · Use policy · Lifecycle requirement · Corporate threshold (30 §7.4).
Scope Use case (IA-AAAA-NNN), system (SIA-AAAA-NNN), tool, area or company.
Linked previous exception If it is an extension.

03Admissibility check

If any answer is Yes, the request is inadmissible and is filed with the reason.

# Does the exception affect…? Yes · No
1 A practice prohibited by Article 5 of Regulation (EU) 2024/1689 or any other red line of the corporate policy.
2 A legal or regulatory obligation.
3 Segregation of duties at any gate (whoever builds verifies or decides).
4 The Enterprise multi-level go-live sign-off.
5 The existence of a stop mechanism (kill switch or alternative process).
Field Content
Result Admissible · Inadmissible
Checked by (AI Office) and date

04Request

Minimum fields of 31 §3.8.

Field Content Guidance
Requirement affected Document, section and text; gate criterion from document 21 or SEG-NN or AG-NN control if applicable.
Justification Why it cannot be complied with now and what would be lost without the exception.
Risk What may happen while it lasts (section 6).
Compensating measures Temporary controls that reduce the risk.
Term requested Within the maximum for the type (section 5).
Owner Person accountable for the measures and for closure.
Closure plan What will be done to comply with the requirement on expiry.
(illustrative example) Requirement affected Acceptable use policy 31 §4.2: only tools in the authorised catalogue. Four-week pilot of an uncatalogued summarisation tool, with fictitious data only.

05Approving body

Matrix of 30 §7.4. The company may tighten it in C2, not lower it.

Type Illustrative example Proposes Approves Maximum term
Minor methodological Using an equivalent in-house template. AI Product Owner AI Office Until the next gate
Use policy Uncatalogued tool in a pilot with fictitious data. Requesting area AI Office with security clearance 90 days
Lifecycle requirement Postponing a non-critical piece of evidence outside a "Proceed with conditions". Sponsor AI Committee 6 months
Corporate threshold Exceeding the investment limit per stage or the return horizon set in C2. AI Committee Board or board committee As resolved

In the AI Committee, exceptions require the presence and clearance of the second line (30 §3.3 and §8.3). If the second line withholds its clearance, the committee cannot approve the exception and may escalate the disagreement to the board committee (E-13).


06Risk assessment

Scales of the common specification §5.1 and document 33.

Field Content Guidance
Risk during the exception Cause, event and consequence.
Likelihood and impact without measures 1–5 × 1–5; impact: the highest of the five axes.
Level without measures Low 1–4 · Medium 5–9 · High 10–15 · Critical 16–25.
Effectiveness of the compensating measures Existing and tested; planned measures do not reduce the level.
Level with measures
Second-line clearance Mandatory for exceptions decided by the AI Committee and for use policy exceptions (security).
Consistency with risk acceptance If the level with measures is High, only the AI Committee accepts it; if it is Critical, the exception is not approved unless the board or its board committee expressly decides so within the appetite (30 §7.2).

07Resolution

Field Content Guidance
Outcome Approved · Approved with conditions · Refused.
Body and reference Minutes (P39) or AI Office register.
Conditions Each with an owner and a deadline.
Start date of validity
Expiry date Never later than the maximum for the type. For corporate thresholds, as resolved.
Reason for refusal Mandatory if refused.
Communication to the requester Date.

08Monitoring and closure

Proposed statuses: Requested · Inadmissible · Under assessment · Refused · In force · Closed · Expired. An exception in force whose expiry date passes without closure becomes Expired and a major nonconformity is recorded (31 §3.8; document 37).

Field Content Guidance
Reviews Date and result of each monthly review by the AI Committee.
Closure date When the requirement is met or the excepted activity ceases.
Evidence of closure Link.
Nonconformity opened on expiry NC-AAAA-NNN, if applicable.

09Company exception register

Code Type Scope Requirement affected Risk level with measures Approved by Reference Start Expiry Owner Status
EXC-AAAA-NNN Low · Medium · High
(illustrative example) EXC-2026-003 Use policy Marketing area 31 §4.2 Low AI Office with security clearance Office register 2026-11 02-11-2026 30-11-2026 Person G In force

Quarterly summary for the board committee (incorporated into P42):

Period In force Approved Refused Closed Expired With High risk
AAAA-Qn

10Quality criteria

# Check Status
1 The request predates the excepted activity. Met · Not met · Not applicable · Pending
2 The admissibility check has been carried out and no answer is Yes.
3 The six minimum fields of 31 §3.8 are present.
4 Approval is by the body in 30 §7.4 and not by whoever proposes (I-9).
5 Second-line clearance is recorded where required.
6 The expiry does not exceed the maximum term for the type.
7 Exceptions in force have been reported to the board committee in the quarter.
8 No expired exception remains without a recorded nonconformity.

11Approval and verification

Function SEVEN-G role Name and position Date Signature or reference
Proposes According to the type (section 5)
Checks admissibility and records AI Office
Assesses the risk and gives clearance Second line (security, risk or compliance)
Approves Body in 30 §7.4

Segregation of duties: whoever proposes does not approve; if the AI Office proposes an exception, it is approved by the AI Committee.


12Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 19-09-2026 First version. Applies 30 §7.4 and 31 §3.8; proposes the code EXC-AAAA-NNN, the statuses and the rule that an extension is a new request.