SEVEN-G
Template P03 · 16-09-2026

Template P03 · Role assignment record

Role assignment record

Designates the people who take on each role in the use case and demonstrates that segregation of duties and incompatibilities are respected.

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review

01Instructions for use

Aspect Guidance
When it is used In phase 0, before G0. It is updated whenever a person changes, when the intensity changes and before each gate involving roles not yet assigned.
Who completes it The AI Product Owner, with the AI Office.
Who verifies it Lite: AI Office. Enterprise: AI Auditor. If the AI Office has prepared the record, the AI Auditor verifies it.
Who decides It is approved with G0: sponsor (Lite) · AI Committee (Enterprise). The AI Auditor is designated by the third line, not by the sponsor.
Gate at which it is reviewed G0 · Authorisation. At every gate it is checked that the recorded verifier and decision-maker are those in this document.
Tool T01 · Use case register (Owners block of the record).
Lite versus Enterprise Lite may omit the fields marked (Enterprise). In Lite the AI Auditor intervenes on a sample basis, but who would do so must be identified.

Completion rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN.
Use case name
Applicable intensity Lite · Enterprise (P04). If it changes, this record is reviewed.
Ambition level Optimise · Augment · Transform. In Transform the board intervenes at G2 and G7.
Document version
Date DD-MM-AAAA.
Author Name and role.

03Use case roles

Role Function Person Position and unit Planned time commitment Acceptance date Substitute (Enterprise)
AI Sponsor Decides
AI Product Owner Builds
AI Technical Owner Builds
AI Operations Owner Builds
AI Risk Owner Controls
AI Auditor Controls
(illustrative example) AI Product Owner Builds Person A Head of customer experience 30% 02-10-2026 Person B

Guidance on time commitment: percentage of the working day or days per month during the current phase. If a role will be assigned later, state the phase in which it will be designated.


04Incompatibility check

Mark whether the same person takes on both roles. Any "Yes" in an incompatible combination prevents passing G0.

Combination Rule (01 §8.2) Same person? Result
Sponsor and product owner Compatible only in Lite Yes · No Compatible · Incompatible
Sponsor and technical owner Compatible only in Lite
Sponsor and operations owner Compatible only in Lite
Sponsor and risk owner Incompatible
Sponsor and auditor Incompatible
Product, technical or operations with each other Compatible
Product, technical or operations and risk owner Incompatible
Product, technical or operations and auditor Incompatible
Risk owner and auditor Incompatible in Enterprise

Independence checks:

Check Answer Guidance
The AI Auditor does not report hierarchically to the sponsor. Yes · No State the auditor's reporting line.
The AI Auditor does not take part in design, construction or operation. Yes · No
The risk owner is not part of the team that builds. Yes · No
If the risk owner prepares phase 3 evidence (P11, P12, P13), G3 verification in Lite is carried out by another person. Yes · No · Not applicable Prevents the risk owner from verifying their own work (01 §7.4, rule 1).

05Verification and decision by gate

Reference: 01 §7.5. State the specific person or body that will act at each gate.

Gate Verifies (Lite · Enterprise) Decides (Lite · Enterprise) Specific designation
Authorisation (G0) AI Office · AI Auditor Sponsor · AI Committee
Opportunity (G1) AI Office · AI Auditor Sponsor · Sponsor, informing the committee
Hypothesis (G2) AI Office · AI Auditor Sponsor · AI Committee
Feasibility (G3) Risk owner · AI Auditor Sponsor with risk clearance · AI Committee
Design (G4) AI Office · AI Auditor Technical owner with risk clearance · AI Committee
Go-live (G5) Risk owner · AI Auditor Sponsor with risk clearance · AI Committee after multi-level sign-off
Continuity (R6) AI Office · AI Auditor Sponsor · AI Committee
Scale or retire (G7) AI Office · AI Auditor Sponsor · AI Committee

For Transform use cases, in addition, the board or its board committee approves at G2 and at G7 when the decision is to scale.

Go-live signatories (Enterprise)

Sign-off with veto power Person and position
Technical owner
Risk and compliance
Information security
Data protection

06Consulted and informed participants

Function Person and position When they intervene Type
Data protection officer Phases 0, 3, 4 and 5 Consulted
Information security Phases 3, 4 and 5 Consulted
Legal counsel and compliance Phases 0 and 3 Consulted
People and organisation Phases 3, 4 and 7 Consulted
Management control Phases 2, 5, 6 and 7 (value validation) Consulted
Workers' representatives (Enterprise) Where appropriate Informed
Suppliers Phases 3 to 6 Informed

07Responsibility matrix by phase (Enterprise)

The starting point is 01 §8.4. Any change from the reference matrix must be justified and may not break segregation of duties.

Phase Sponsor Product Technical Operations Risk Auditor Change and justification
0 · Context A R C I C V
1 · Discovery A R C I C V
2 · Value hypothesis A R C I C V
3 · Feasibility and risk A R R C R V
4 · Design I C A/R C C V
5 · Delivery and validation I A R C C V
6 · Operation I C C A/R C V
7 · Evolution or retirement A R C C C V

A is accountable for the outcome · R does the work · C is consulted · I is informed · V verifies.


08Conflict of interest declaration

Person Role Conflict of interest? Description Measure adopted
Yes · No
(illustrative example) Person C Risk owner Yes Took part in selecting the supplier in another use case. Abstains from the P14 clearance; their substitute issues it.

09Assignment change log

Date Role Previous person New person Reason Approved by

Each change generates an event in the use case register (03 §3.3).


10Quality criteria

The formal G0 criteria are in document 21 (see criteria G0.xx).

# Check Status
1 The six roles are assigned or have a planned designation phase. Met · Not met · Not applicable · Pending
2 There are no incompatible combinations for the applicable intensity.
3 The AI Auditor is independent of the team and of the sponsor.
4 Each person has accepted their role with a date.
5 The verifier and decision-maker for each gate are identified.
6 In Enterprise, the go-live signatories are identified.
7 Conflicts of interest have been declared.

11Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Prepares AI Product Owner
Verifies AI Office (Lite) · AI Auditor (Enterprise)
Decides AI Sponsor (Lite) · AI Committee (Enterprise), with G0

Segregation of duties: nobody verifies a record in which they appear with a role incompatible with verification.


12Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 16-09-2026 First version. Converts into record format the roles, incompatibilities, allocation of verification and decision, and responsibilities by phase in 01 §7.5 and §8.