SEVEN-G
Document 30 · 16-09-2026

Document 30 · Governance model

Governance model

Bodies, roles, delegation of decisions and escalation of artificial intelligence in the company

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review
5bodies with a model mandate
6roles with a role description
3lines applied to AI
14escalation situations with a time limit

01Purpose and scope

This document develops component B of SEVEN-G with regard to who decides, who builds and who controls artificial intelligence. It turns section 8 of document 01 into elements that a company can approve and put into practice: body mandates, role descriptions, responsibility matrices, a decision delegation matrix and escalation rules.

It applies to the bodies involved in the corporate cycle (C1–C5) and in the lifecycle (phases 0–7), to the six roles in 01 §8.1 and to the four types of AI use in 01 §1.2. The gate criteria are in document 21, the risk methodology in 33, the nonconformity and incident process in 37 and audit in 38.

1.1 Governance design principles

# Principle Consequence in the model
1 Do not create parallel governance (01 §8.3) The bodies may be existing committees with an expanded mandate (section 10).
2 Segregation of duties (principle 7) Those who build do not verify or decide on their own work. The incompatibilities in 01 §8.2 are mandatory.
3 Proportionality Lite or Enterprise intensity determines which body decides.
4 Recorded decision Every decision with an effect on the portfolio, risk or compliance is recorded in T01 with the decision-maker, date and reason.
5 Known time limits Each escalation has a recipient and a time limit.

1.2 Terminology note

In SEVEN-G, AI Office designates the company's internal unit that provides methodological support, maintains the inventory and consolidates measurement. It must not be confused with the European Commission's European AI Office, provided for in Regulation (EU) 2024/1689. If there is a risk of confusion, the company may call it the "Corporate AI Office" or "AI Centre of Excellence".


02Architecture of bodies

AI governance bodies
Who sets direction, who decides, who builds and who controls
flowchart TB
  CA["Board of directors"]
  CD["Board committee: audit, risk or technology"]
  AD["Senior management"]
  CIA["AI Committee"]
  OIA["AI Office"]
  EQ["Use case teams: sponsor, product, technical and operations"]
  L2["Second line: risk, compliance, security and data protection"]
  L3["Third line: internal audit and AI auditors"]
  CA -->|"Thesis, ambition and risk appetite"| AD
  CA --> CD
  AD --> CIA
  CIA -->|"Enterprise gates, portfolio and retirements"| EQ
  CIA --> OIA
  OIA -->|"Methodology, inventory and Lite verification"| EQ
  L2 -->|"Risk owners, clearance and sign-off"| EQ
  L3 -->|"Independent verification"| EQ
  CIA -->|"Escalates what exceeds its delegation"| CD
  L2 -->|"Reports on risk and compliance"| CD
  L3 -->|"Reports independently"| CD
  classDef dir fill:#f2dfce,stroke:#0f5499,color:#1a1817
  classDef ctl fill:#d9ebe0,stroke:#0d7680,color:#1a1817
  classDef aud fill:#f3d3da,stroke:#990f3d,color:#1a1817
  class CA,CD,AD,CIA,OIA,EQ dir
  class L2 ctl
  class L3 aud
Source: SEVEN-G
Body Main function in SEVEN-G Frequency (01 §5.2) Stages
Board of directors Sets direction and limits; approves Transform; oversees. Annual (C2, C5) and quarterly (C4) C2, C4, C5
Board committee Oversees risks, compliance, incidents, major and critical nonconformities, and audits. Quarterly C4, C5
AI Committee Manages the portfolio; decides Enterprise gates, retirements and High risks. Monthly C1, C3, C4
AI Office Methodology, inventory, verification in Lite, measurement and reporting to the bodies. Continuous C1, C4, C5
Second line Assesses risks, issues clearances and signs off Enterprise go-live. Continuous All
Third line Verifies independently and audits compliance with the framework. Annual plan and Enterprise gates C4, C5

03Model mandates of the bodies

The mandates are models to be adapted. The company approves them in C2 and incorporates them into the rules of procedure of the body that takes on the function. Quorum and time limits are for reference. The article-by-article text that can be approved, with the model appointment of the head of AI, is in P38; agendas and minutes, in P39.

3.1 Board of directors

Element Model content
Mandate Exercise ultimate responsibility for the strategy, risk appetite and oversight of AI.
Functions Approve the AI thesis, the ambition per sphere and the risk appetite with its thresholds (C2). Approve the corporate AI policy (document 31). Approve Transform use cases at G2 and their scaling at G7. Decide, on an exceptional basis, on the acceptance of Critical residual risks within the appetite. Oversee the board dashboard (C4). Review maturity, the transformation index and the thesis (C5).
Composition Full board. It may be supported by a director with AI experience or by an external non-voting adviser.
Quorum That set by its articles of association and rules of procedure.
Frequency One annual session with a dedicated item and a quarterly oversight item, which it may delegate to the committee.
Model agenda (annual) 1. Maturity, transformation index and validated versus declared value. 2. AI thesis and ambition per sphere. 3. Risk appetite and thresholds (Enterprise intensity, investment, return horizon, regularisation). 4. Transform use cases (a maximum of three in detail). 5. Previous recommendations. 6. Resolutions.
Model agenda (quarterly) 1. Changes in the dashboard. 2. S1 and S2 incidents, and critical nonconformities. 3. Relevant gate decisions and retirements. 4. Risks outside appetite. 5. Open and overdue recommendations.
Record Minutes and registration of each resolution in the recommendations and decisions register (T18).

3.2 Board committee

The company designates the committee that oversees AI: audit, risk or technology. If none exists, the functions are exercised by the board.

Element Model content
Mandate Oversee the effectiveness of control over AI.
Functions Approve the annual AI audit plan and receive its results (document 38). Receive information on S1 incidents and on major and critical nonconformities. Resolve disagreements between the AI Committee and the second line (section 8.3). Decide, by delegation of the board, on the exceptional acceptance of Critical risks. Monitor the independence of the AI auditors. Receive the exceptions in force.
Composition That of the committee. The head of the AI Office, the chief risk or compliance officer and the head of internal audit attend without a vote.
Frequency Quarterly, with an extraordinary session in the event of an S1 incident or a critical nonconformity if its chair so decides.
Model agenda 1. High and Critical risks, and concentrations. 2. Regulatory compliance and regulatory changes. 3. Incidents and major and critical nonconformities. 4. Audits and follow-up of findings. 5. Escalated matters. 6. Exceptions for the quarter.

3.3 AI Committee

Element Model content
Mandate Manage the AI portfolio within the approved thesis, ambition and appetite, and decide what the board delegates to it.
Functions Approve the C1 diagnosis and the C3 portfolio. Decide Enterprise gates (01 §7.5). Accept High residual risks. Review risk concentration (principle 5). Decide retirements. Review stalled use cases, expired conditions and decisions escalated after two iterations. Approve the acceptable use policy and exceptions at its level. Escalate what exceeds its delegation.
Chair A member of senior management with authority over the portfolio. It should not be chaired by whoever sponsors most of the portfolio.
Voting members Senior business management (at least two areas), technology, data and people.
Members with a voice and clearance Risk, compliance, information security and data protection. Their clearance is required within their remit, but they do not vote on the business decision (section 8.3).
Permanent guests Head of the AI Office (secretary, non-voting); internal audit as an observer.
Quorum A majority of voting members, including the chair or their deputy, and at least one representative of the second line. Without the second line, G3, G5, risk acceptances and exceptions are not decided.
Resolutions By consensus; failing that, by a majority of votes present, with the chair holding a casting vote.
Mandatory abstention Anyone with a sponsorship or build role in the use case abstains and does not count towards the quorum for that item (01 §7.4, rule 1).
Frequency Monthly; extraordinary for urgent gates or S1 incidents. Written decisions are allowed for gates without debate, under the same rules.
Model agenda 1. Funnel: registrations, phase changes, stalled use cases (document 03). 2. Gates with verification completed. 3. Value and cost deviations. 4. High and Critical risks, and concentration by sphere, supplier or technology. 5. Incidents, nonconformities and expired conditions. 6. Retirements and lapsed R6 reviews. 7. Corporate and unauthorised use (T21). 8. Exceptions. 9. Matters to escalate.
Record Minutes with numbered resolutions; each gate decision in T03 with P29.

3.4 AI Office

Element Model content
Mandate Make the framework work: methodology, inventory, reliable information and support for teams.
Functions Maintain the inventory (document 32, T02) and the use case register (T01). Safeguard the methodology, templates and checklists. Verify Lite gates in which it has not participated. Consolidate measurement with management control (document 40). Prepare information for the bodies. Coordinate AI literacy and the regularisation of unauthorised use (document 31). Lead C1 and C5.
Composition Head of the Office and a small methodology, portfolio and measurement team. In small organisations, one part-time person (section 11).
Reporting line To the chair of the AI Committee or to an executive who is not a regular sponsor.
Limit If the Office builds solutions, it does not verify those use cases: verification passes to the second line or the AI Auditor.

3.5 Second and third line

Element Second line Third line
Mandate Ensure that AI risks are identified, assessed, mitigated and accepted by the appropriate person, and that regulatory obligations are met. Provide independent assurance on the design and effectiveness of AI governance.
Functions Designate AI Risk Owners. Issue clearances (G3, G4 and G5 Lite; committee matters). Sign off Enterprise go-live: risk and compliance, security and data protection (01 §6.7). Regulatory classification and impact assessments (document 32). Maintain the risk methodology (33) and the regulatory mapping (34). Provide or supervise the AI auditors. Propose the annual AI audit plan. Audit the framework and the declaration of application (01 §14). Participate in C5. Verify the closure of nonconformities.
Composition Risk, compliance, information security, data protection officer and, where applicable, legal counsel, with a single coordinator for AI. Internal audit, with in-house or external AI auditors under its supervision.
Reporting line Outside the areas that sponsor the portfolio. Functionally to the board committee; never to the sponsor.
Frequency Continuous; quarterly report to the committee. Annual plan and Enterprise gates.

04Use case roles: role descriptions

The six roles are functions, not job positions: a person takes them on for a use case in addition to their job. The time commitments are indicative for getting started and must be calibrated in C5 with the company's own data.

Role Mission and key responsibilities Competencies Typical profile Indicative time commitment (Lite · Enterprise)
AI Sponsor Accountable for value and investment. Commits budget and people; approves the hypothesis and stop criteria; decides Lite gates (01 §7.5); accepts Medium risks with risk clearance; ensures that released capacity is realised; proposes retirement when the value is not sustained. The affected business; reading hypotheses and indicators; AI risks at executive level (profile F7 in document 31); capacity to stop. Management of the area that receives the value. 2–4 h/month · 4–8 h/month plus gate preparation
AI Product Owner Accountable for the value hypothesis, actual use and adoption. Drafts the charter and hypothesis; measures the baseline and pilot; prepares the evidence for phases 0, 1, 2 and 7; accepts Low risks with a record; coordinates adoption (document 23); maintains the record in T01. Product management; experiment design and attribution; processes; communication with users; limits of generative AI. Business, with experience in product, processes or transformation. 10–30% in active phases · 50–100% in phases 2–5 and 20–40% in operation
AI Technical Owner Accountable for the solution, data, models and technical documentation. Assesses technical and data feasibility; designs the architecture, lineage, security and rollback; leads build or integration and testing. Part of the team: does not verify or decide the gates of their use case (01 §8.1). Data and model engineering; evaluation of generative AI and agents; application security; integration; technical requirements of the AI Act according to classification. Architect or technical lead from technology or data. 20–50% in phases 3–5 · 50–100% in phases 3–5
AI Operations Owner Accountable for stability, monitoring, incidents and changes. Prepares the manual and monitoring; activates the kill switch when appropriate; manages incidents (document 37) and changes; provides data for R6. Service operations; model observability (degradation, drift, cost); incidents; change control. Head of the platform or of the business service. 5–10% in operation · 20–50% in operation, with on-call cover for critical systems
AI Risk Owner Accountable for the assessment and monitoring of risk and compliance. Coordinates regulatory classification and impact assessments; assesses inherent and residual risks; issues clearance at G3, G4 and G5 Lite (without verifying them, 01 §7.5); proposes acceptance at the appropriate level; coordinates the multi-level sign-off. Risk management; AI Act, GDPR and sector regulation; risks of generative AI and agents; independent judgement. Second line (risk, compliance or data protection). 1–3 days per use case in phase 3 · 10–30% in phases 3–5
AI Auditor Independently verifies that the evidence exists, is valid and was produced on time. Verifies Enterprise gates and Lite samples; issues Conformant, Conformant with observations or Nonconformant; records nonconformities and verifies their closure. Audit and sampling; SEVEN-G; critical reading of model and agent evaluations; regulatory knowledge; professional scepticism (38 §3). Internal audit or an external auditor supervised by it. According to the sampling plan · 1–3 days per gate plus continuity

Supporting roles of the bodies

Role Function Who usually takes it on
Head of the AI Office Leads the Office, acts as secretary of the AI Committee and is accountable for the quality of the inventory and of the information provided to the bodies. Executive with experience in transformation, portfolio or technology governance.
Second-line coordinator for AI Consolidates clearances, sign-offs and the quarterly AI risk report. Risk or compliance.
Head of AI audit Plans, assigns auditors and is accountable for their independence. Internal audit.
Director or adviser with AI experience Supports the board in reading the dashboard and asking oversight questions. Independent director or non-voting adviser.

05Incompatibilities

5.1 Between use case roles (01 §8.2, mandatory)

# Rule Intensity
I-1 The risk owner may not be the sponsor, product, technical or operations owner of the same use case. All
I-2 The AI Auditor may not take on any other role in the same use case. All
I-3 The risk owner and the AI Auditor of a use case may not be the same person. Enterprise
I-4 The sponsor may not also be the product, technical or operations owner. Enterprise (compatible in Lite)
I-5 The AI Auditor may not report hierarchically to the sponsor. All

5.2 Between bodies and roles

# Rule
I-6 A member of the AI Committee with a sponsorship or build role in a use case abstains from its decisions.
I-7 Whoever verifies a gate does not participate in its decision.
I-8 The AI Office does not verify use cases in whose design, build or operation it has participated.
I-9 Whoever proposes an exception does not approve it.
I-10 Internal audit does not audit activities for which it has been responsible or on whose controls it has advised in the previous twelve months.
I-11 A supplier of the solution does not audit the use case in which it participates or assess its own product.

Breaching an incompatibility is a major nonconformity (self-approval, 01 §12). If it affected G3 or G5, the verification and the decision are repeated.


06Responsibility matrices

A is accountable for the outcome · R performs · C is consulted · I is informed · V verifies · D decides (when whoever decides is not whoever is accountable for the outcome).

6.1 By lifecycle phase

The role columns reproduce 01 §8.4 without changes; the bodies are added. In Lite, verification is performed by the AI Office at all gates in accordance with 01 §7.5, with audit by sampling; the risk owner issues clearance at G3, G4 and G5.

Phase Sponsor Product Technical Operations Risk Auditor AI Office AI Committee Board
0 · Context A R C I C V C (inventory registration) · V Lite D Enterprise I if Transform
1 · Discovery A R C I C V C · V Lite I —
2 · Value hypothesis A R C I C V C · V Lite D Enterprise D if Transform
3 · Feasibility and risk A R R C R V C · V Lite D Enterprise I if Critical risk
4 · Design I C A/R C C V V Lite D Enterprise —
5 · Delivery and validation I A R C C V C · V Lite D Enterprise after sign-off —
6 · Operation I C C A/R C V C (measurement) · V Lite (R6) D at Enterprise R6 I aggregated (C4)
7 · Evolution or retirement A R C C C V C · V Lite D Enterprise D if a Transform use case scales

6.2 By key activity

Activity Sponsor Product Technical Operations Risk Auditor Office Committee
Determine the intensity (P04) A R C I C V C I
Inventory registration (P05) I R C I C V A I
Regulatory classification and impact assessments (P11) I C C I A/R (with data protection) V C I
Risk matrix and register (P12) C R R C A V I I
Supplier assessment (P14) C C R C A V I I
Human oversight and security design (P17, P18) I C A/R C C V I I
Go-live sign-off (P23) I C R (sign-off) C R (sign-off) V I D
Value realisation tracking (P28) A R I C I V R (consolidates) I
Retirement plan (P30) A R R R C V C D Enterprise

6.3 By corporate cycle stage

Stage and activity Board Board committee Senior management AI Committee AI Office Second line Third line
C1 · AI system inventory I I C D A/R C I
C1 · Maturity with evidence I I C D A/R C C
C1 · Current transformation index, value and cost I — C D A/R I I
C2 · AI thesis and ambition per sphere D I A/R C R (support) C I
C2 · Risk appetite and thresholds D C A/R C R (support) R C
C2 · Corporate AI policy D C A C R R C
C2 · Framework budget D — A/R C C I —
C3 · Prioritised portfolio and ambition balance I (D for Transform) — C A/D R C I
C3 · Retirement criteria and capacity I — C A/D R C —
C4 · Board dashboard (quarterly) D (oversees) I C C A/R C I
C4 · Monthly portfolio monitoring — — I A/D R C I
C4 · Quarterly report on risks, incidents and nonconformities I D (oversees) I C C A/R C
C4 · AI audit plan and results I D I I C C A/R
C5 · Review of maturity, index and thesis D C A C R C R
C5 · Lessons learned, time limits and thresholds for the new cycle D C A R R C C

07Decision delegation matrix

The matrix sets out who decides what. Anything not listed here falls to the AI Committee, which may escalate it. The company may adjust it in C2 without lowering the levels in 01 and the common specification (§5.1).

7.1 Decision gates

Decision Lite: verifies Lite: decides Enterprise: verifies Enterprise: decides Transform
Authorisation (G0) AI Office Sponsor AI Auditor AI Committee Inform the board
Opportunity (G1) AI Office Sponsor AI Auditor Sponsor, informing the committee —
Hypothesis (G2) AI Office Sponsor AI Auditor AI Committee Board
Feasibility (G3) AI Office Sponsor with risk clearance AI Auditor AI Committee Board if the investment limit per stage is exceeded
Design (G4) AI Office Sponsor with risk clearance AI Auditor AI Committee —
Go-live (G5) AI Office Sponsor with risk clearance AI Auditor AI Committee after multi-level sign-off —
Continuity (R6) AI Office Sponsor AI Auditor AI Committee —
Scale or retire (G7) AI Office Sponsor AI Auditor AI Committee Board if scaled
Gate after two iterations — AI Committee — Board committee or board, depending on the matter Board

7.2 Acceptance of residual risk

Scale from the common specification (§5.1): level = probability × impact; Low 1–4, Medium 5–9, High 10–15, Critical 16–25.

Residual level Who accepts Prior clearance Conditions
Low AI Product Owner — Recorded in P12 with justification.
Medium Sponsor AI Risk Owner Recorded in P12; review at the next gate or R6.
High AI Committee Second line Mitigation plan with a deadline; review at least quarterly; visible to the board committee.
Critical Not accepted. Exceptionally, only the board or its board committee. Second line and legal counsel Within the appetite approved in C2; limited validity; plan to reduce it. Without that approval it blocks G3 and G5.

Additional rules: (1) acceptance lapses if the regulatory classification, autonomy (A0–A3), exposure or main supplier changes; (2) the concentration of accepted High risks in a sphere, supplier or technology is reviewed as a portfolio risk and, if it exceeds the appetite, is escalated to the board; (3) a practice prohibited by Article 5 of Regulation (EU) 2024/1689 cannot be accepted by any body.

7.3 Suspensions, stops and retirements

Decision Who may take it Time limit Ratification
Immediate suspension (kill switch or disconnection) in the event of an S1 incident, a possible prohibited practice, a data leak or an unauthorised action by an agent AI Operations Owner; information security; AI Risk Owner; any member of the AI Committee Immediate AI Committee within 2 working days: resume, maintain or retire.
Precautionary suspension without an incident (request from an authority, regulatory change) AI Risk Owner with the sponsor Up to 5 working days AI Committee, ordinary or extraordinary session.
Stop at a gate Body that decides the gate In the decision Coded reason (document 03).
Planned retirement (G7) Lite: sponsor · Enterprise: AI Committee According to P30 and T22 Board informed if it was Transform.
Forced retirement (regulatory breach, Critical risk not accepted, supplier ceasing to provide the service) AI Committee At the session in which it becomes known Board committee informed.
Resumption after suspension AI Committee with second-line clearance After containment has been verified Incident or condition closed.

Immediate suspension does not require prior authorisation, and whoever activates it in good faith suffers no consequences for doing so. The operations manual (P24) identifies by name who may activate it.

7.4 Exceptions

An exception temporarily authorises non-compliance with a requirement of the framework or the policy. They are never allowed for prohibited practices, legal obligations, segregation of duties at any gate, Enterprise multi-level sign-off or the existence of a stop mechanism.

Type Illustrative example Proposes Approves Maximum term
Minor methodological Using an equivalent in-house template. AI Product Owner AI Office Until the next gate
Use policy Uncatalogued tool in a pilot with fictitious data. Requesting area AI Office with security clearance 90 days
Lifecycle requirement Postponing a non-critical piece of evidence outside a "Proceed with conditions". Sponsor AI Committee 6 months
Corporate threshold Exceeding the investment limit per stage or the return horizon set in C2. AI Committee Board or board committee As resolved

Every exception is recorded in P40 (EXC-AAAA-NNN) with its justification, risk, compensating measures, expiry and owner. An expired exception that has not been closed is a major nonconformity. The board committee receives the exceptions in force each quarter.

7.5 Other delegated decisions

Decision Decides Prior clearance Informs
Authorise an AI tool for corporate use AI Office; AI Committee if it meets an Enterprise criterion Security, data protection, procurement AI Committee
Activate AI features in contracted third-party software System owner with the AI Office Security and data protection Recorded in T02
Change the regulatory classification of a system AI Risk Owner Legal counsel AI Committee
Raise autonomy to A2 or A3 AI Committee Security (document 35) Board committee if there is direct exposure
Relax stop criteria Body that authorised the use case (01 §7.4, rule 6) AI Office AI Committee
Contract an N3 supplier AI Committee Second line (document 36) Board committee
Close a critical nonconformity AI Committee, after verification by the auditor — Board committee
Approve the annual AI audit plan Board committee Proposal from the third line Board
Approve the corporate AI policy Board AI Committee and second line The whole organisation
Approve the acceptable use policy AI Committee Second line and people Board committee

08Escalation

8.1 General rules

  1. Escalating does not transfer responsibility: whoever escalates remains accountable for containment while the decision is being made.
  2. The time limit runs from detection, not from confirmation.
  3. Escalation is made through the recorded channel (T01 or T08) and, if the time limit is less than 24 hours, also by direct contact with the designated person.
  4. Failure to respond within the time limit escalates automatically to the next level.
  5. No one may block an escalation. Anyone may contact the second line or the company's internal reporting system (in Spain, regulated by Law 2/2023 of 20 February).

8.2 Escalation table

The incident time limits are the indicative response times in document 37 (§4.3); those for nonconformities are those in 01 §12. The company approves them in C2 without exceeding those set by regulation.

# What is escalated To whom Reference time limit What is expected
E-1 S1 incident AI Risk Owner and chair of the AI Committee → chair of the board committee Committee: 4 hours · Board committee: 24 hours Containment, suspension if appropriate, immediate assessment of reporting obligations.
E-2 S2 incident AI Committee (chair and AI Risk Owner) 24 hours Containment; information to the board committee in the quarterly report.
E-3 S3 and S4 incidents AI Office Triage within 1 and 5 working days; monthly report to the committee Recording and follow-up.
E-4 Possible prohibited practice or possible serious incident under the AI Act AI Risk Owner, legal counsel and chair of the AI Committee Immediate, 24 hours at most Suspension and analysis of reporting obligations.
E-5 Critical nonconformity AI Committee and board committee Containment 48 hours; plan 10 days Approve containment and plan.
E-6 Major nonconformity AI Committee Containment 10 days; plan 30 days Approve plan.
E-7 Minor nonconformity AI Office Before the next gate or review Follow-up.
E-8 Critical residual risk identified AI Committee; then the board committee or board if acceptance is proposed Committee: 5 working days Avoid, mitigate or propose exceptional acceptance.
E-9 New or aggravated High residual risk in production AI Committee Next session, 30 days at most Accept or require mitigation.
E-10 Gate with two iterations unresolved Body above the one that decides Next session of the higher body Decide or set conditions.
E-11 Stalled use case or gate outside the decision time limit (03 §3.6) AI Committee Monthly review Unblock, put on hold with a reason or stop.
E-12 Expired condition Body that imposed it 5 working days The outcome becomes Iterate (01 §7.4, rule 4).
E-13 Disagreement between the AI Committee and the second line Board committee Next session; extraordinary within 10 working days if it blocks a go-live Resolve (section 8.3).
E-14 Request from an authority, formal complaint or reputational crisis linked to an AI system Legal counsel, AI Risk Owner and chair of the committee 48 hours at most Coordinated response and assessment of suspension.

The following are also brought to the next committee session: realised value clearly below the hypothesis at R6 (brings G7 forward, 01 §6.8), recurring cost above budget plus the C2 tolerance, lapsed R6, unauthorised use involving confidential or personal data, and excessive dependence on a supplier.

Reports to authorities (AI Act, GDPR, NIS2, DORA and sector regulation) have their own time limits, do not replace internal escalation and are developed in documents 34 and 37 (§5).

8.3 Resolving disagreements with the second line

The second line does not vote on business decisions, but its clearance is required at G3, G5, risk acceptances and exceptions. If it withholds clearance:

  1. The AI Committee may not decide Proceed or Proceed with conditions on that matter.
  2. It may decide Iterate, Pivot or Stop, or escalate the disagreement to the board committee (E-13).
  3. The board committee resolves with information from both parties, and its decision is recorded in T18.
  4. In the Enterprise multi-level sign-off, each signatory has a veto (01 §6.7), which can be lifted only by whoever issued it, after correction, or by the board committee.

09Three lines model applied to AI

SEVEN-G follows the logic of the Three Lines Model of the Institute of Internal Auditors (IIA, 2020, updated by its Statement of Position of 8 July 2026): the governing body is accountable; management and the first line manage risk in pursuing objectives; the second line provides expertise, support and challenge; the third line provides independent assurance.

Line Who in SEVEN-G What it does on AI What it does not do
Governing body Board and board committee Sets direction and appetite; approves Transform; oversees. Manage use cases or decide ordinary gates.
First line Sponsor, product, technical, operations; user areas; AI Office in its portfolio management Manages the risks of its use cases and systems; applies controls; maintains evidence; operates. Verify its own evidence; accept risks above its level.
Second line Risk, compliance, security, data protection; AI Risk Owners Methodology and regulatory mapping; challenge; clearances; sign-off; oversight of the risk portfolio. Build solutions; decide on business value.
Third line Internal audit and AI auditors Verification of Enterprise gates; audit of the framework, continuity and specific topics; independent report to the board committee. Design controls that it later audits; participate in use cases.
External assurance External auditor, ISO/IEC 42001 certification body, notified body when required by the Regulation Independent opinion or certification. Replace internal responsibilities.

Boundary situations

Situation Treatment
The AI Office verifies in Lite This is management verification, not independent assurance; that is why the AI Auditor reviews a sample of Lite gates (document 38).
The data protection officer participates in the impact assessment Advises and monitors (GDPR, Article 39); the assessment is carried out by the controller and the officer should not appear as its author.
Security operates controls and also signs off Operation is first line; the sign-off is issued by a person other than the one who operated the control.
A central team builds and validates models Independent model validation, where it exists, sits in the second line and does not report to the building team.

10Integration into existing committees

Existing committee SEVEN-G functions it can take on Conditions
Executive committee Full AI Committee in medium-sized organisations. Fixed monthly item; second line present for that item; quorum as in 3.3.
Transformation or digital strategy committee AI Committee. Include risk, compliance, data protection and people with clearance.
Management risk committee Review of High risks and concentration; report to the board committee. Does not decide gates.
Information security and data protection committees Security and data protection sign-offs; agents and AI-enabled attacks (35); impact assessments; unauthorised use involving personal data. Record sign-offs in P23; coordination with classification (32).
New products or product governance committee G2 and G5 of use cases with direct customer exposure in regulated sectors. Apply the criteria in 21 in addition to sector criteria.
Architecture, investment or procurement committees Technical review of G4; build, buy or partner; assessment of N2 and N3 suppliers. Decisions on N3 and Enterprise gates remain with the AI Committee.
Ethics committee, if one exists Consultation in cases with an impact on people or sensitive data. Advisory; does not replace the second line.
Board audit or risk committee Board committee for AI. Quarterly AI item; coordination between both on the audit plan.

Steps to integrate: (1) map committees and their rules of procedure; (2) assign each function in sections 3 and 7 to a body, with no gaps or duplications; (3) amend the rules of procedure; (4) approve the delegation matrix in C2; (5) register bodies and people in T01 to validate decision-maker and verifier. This sequence fits into month 3 of the first implementation (01 §5.3) and is developed in document 90.


11Adaptation to small organisations

A small or medium-sized organisation may apply SEVEN-G with a minimum structure provided that it preserves three non-negotiable safeguards: those who build do not verify or decide on their own work; someone independent of the team issues the risk clearance; and the governing body approves the direction and the risk appetite.

Element Minimum structure
Board Governing body, without a board committee. An AI item at least quarterly with the board dashboard (C4) and annual approval of the direction and the risk appetite (C2, C5), as in 01 §5.2.
AI Committee Executive committee with a monthly AI item and its own agenda.
AI Office One person with a part-time commitment (indicatively, 10–30%) who maintains the inventory, register and templates.
Second line Compliance officer, data protection officer or external adviser, with documented clearance.
Third line External auditor or group internal audit: annual review of the framework, sampling of Lite gates (21 §10.3) and every gate of Enterprise use cases.
Use case roles Sponsor, product, technical and operations may be concentrated in two people in Lite; risk and auditor always outside the team.
Intensity Lite by default. A use case that meets an Enterprise criterion (01 §9.2) is managed with full Enterprise intensity (01 §9.3): AI Auditor at all its gates —external if there is nobody independent in-house— and multi-level sign-off at G5.
Tools Use case register T01 or, if the company prefers, a spreadsheet with the data model in 03.
Situation Acceptable solution Not acceptable
There is only one technical person They are the technical and operations owner; the Office verifies; an external adviser gives the risk clearance. That they verify their own evidence.
There is no internal audit External auditor with annual sampling and at Enterprise gates. That the sponsor acts as auditor.
The chief executive sponsors all use cases Decides Lite gates; Enterprise gates are decided by the governing body or a committee with at least one member unconnected with the sponsorship. That they decide their own Enterprise gates.

12Conflicts of interest

# Situation Risk Treatment
CI-1 A committee member sponsors the use case being decided. Self-approval. Abstention and record (I-6).
CI-2 The sponsor's variable remuneration depends on declared value. Inflating value or avoiding stopping. Link objectives to validated value (measurement rule 2).
CI-3 An employee has a relationship with a supplier being assessed. Biased selection. Declaration prior to P14 and exclusion.
CI-4 The auditor comes from the building team, or the consultant who designed the system proposes to audit it. Self-review. Twelve-month cooling-off period (I-10); prohibition (I-11).
CI-5 The AI Office has volume targets for use cases in production. Lax verification. Targets for inventory quality, decision time and validated value.
CI-6 A director has interests in one of the company's AI suppliers. Biased decision on Transform or N3. Board conflict of interest regime; abstention.

Procedure. (1) Declaration on taking on the role (in P03) and whenever a conflict arises; members of bodies, annually (P41). (2) Assessment by the AI Office with compliance: actual, potential or apparent. (3) Measure: abstention, replacement, additional verification or board regime. (4) Record in the register of declarations and abstentions in P41 and in the minutes (P39) or the gate decision record (P29) of the affected decision. (5) Check by the AI Auditor at each Enterprise gate.

Failing to declare a conflict that has affected a gate decision is a major nonconformity, without prejudice to the company's code of conduct.


13Associated tools and templates

Name Use in this document
Use case register (T01) Bodies, people and use case decisions.
Gate manager (T03) Verifier and decision-maker per gate; self-approval block.
Nonconformity and incident register (T08) Escalation with time limits and alerts.
Board recommendations register (T18) Resolutions of the board and the board committee.
Retirement manager (T22) Planned and forced retirements.
Role assignment record (P03) Assignment, incompatibilities and conflicts.
Go-live sign-off (P23) Multi-level sign-off with veto power.
Gate decision record (P29) Decision, decision-maker, verifier and conditions.
Scale or retirement decision (P30) G7 decisions.
Rules of procedure of the AI governance bodies (P38) Text that can be approved for the mandates in section 3 and appointment of the head of AI.
Agenda and minutes of a governance body (P39) Meetings of the bodies, resolutions and votes.
Exception request and register (P40) Exceptions in section 7.4.
Declarations of independence and conflicts of interest (P41) Declarations, abstentions and measures in section 12.
Quarterly second-line report (P42) Quarterly information to the board committee (section 6.3).

Requirements for the tools: T01 and T03 must prevent a person with an incompatible role from being recorded as decision-maker or verifier; record abstentions; require the second line at G3, G5, risk acceptances and exceptions; and generate alerts with the time limits in section 8.2.


Document Relationship
01 · Foundational methodology Normative source for roles, bodies, incompatibilities, gates and nonconformities.
54 · How a company organises itself for AI How these bodies are assigned in a real organisation chart and which patterns are seen in the market.
03 · Tools and use case register Decision register, reference time limits and stalled use cases.
13 · AI thesis, ambition and risk appetite Thresholds for the delegation matrix.
21 · Gate and audit criteria What is verified and decided at each gate.
31 · Corporate policy and acceptable use Policies approved by the bodies; training profiles.
32 · Inventory and regulatory classification Responsibilities for inventory and classification.
33 · AI risk methodology Risk scale and acceptance.
35 · AI and agent security Autonomy and kill switch.
36 · AI third parties and suppliers Levels N1–N3.
37 · Nonconformities and incidents Response times, reports to authorities and process.
38 · AI audit framework Independence and function of the AI Auditor.
90 · Implementation guide Putting the model into practice.

This document does not constitute legal advice.


15Version control

Version Date Changes
0.1 16-09-2026 First version. Develops 01 §8 with model mandates for the bodies, role descriptions for the six roles, incompatibilities between bodies and roles, responsibility matrices by phase, activity and corporate stage, delegation matrix (gates, risk acceptance, suspensions and retirements, exceptions), escalation with time limits aligned with document 37, three lines model, integration into existing committees, adaptation to small organisations and conflicts of interest. Consistency adjustments with 01 (segregation of duties in Lite, R6 outcomes, agent criterion) and with 34 and 37.
0.1 19-09-2026 Adaptation to small organisations (11) aligned with 01 §5.2 and §9.3: board at least quarterly, monthly committee and, for Enterprise use cases, AI Auditor at every gate.

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.