SEVEN-G
Document 32 · 16-09-2026

Document 32 · Inventory and regulatory classification

AI system inventory and regulatory classification

What is inventoried, with which fields, how it is classified under the EU AI Act and which assessments follow from it

Fernando García VarelaVersion 0.1 (working draft)16-09-2026Draft for review
4types of use inventoried
9steps in the classification tree
3resulting assessments
8inventory quality indicators

01Purpose and scope

The AI system inventory is the foundation of all governance: without knowing which systems exist, who is accountable for them and how they are classified, it is not possible to manage risks, meet obligations, audit or report to the board. The foundational methodology requires it in C1 (01 §5.1), in phase 0 (inventory registration) and as a condition for declaring that SEVEN-G is applied (01 §14, condition 2).

This document defines:

The regulatory classification described here is a working method for structuring the analysis. It does not replace the qualified legal judgement required by 01 §6.5. The classification and the obligations derived from it are for guidance only: responsibility for the regulatory classification of each system and for compliance, including the applicable sector regulation, lies with the organisation (document 93, section 11).

1.1 Regulatory status at the date of consultation

Consulted on 16-09-2026 in official European Union sources (EUR-Lex and European Commission pages on the AI Act).

Date What applies Source
1-8-2024 Entry into force of Regulation (EU) 2024/1689. Article 113
2-2-2025 General provisions (including AI literacy) and prohibited practices. Article 113
2-8-2025 Obligations of providers of general-purpose AI models; governance. Article 113
2-8-2026 Transparency obligations of Article 50 and the remaining provisions of general application that have not been postponed. Article 113; Regulation (EU) 2026/1744
2-12-2026 New prohibited practice concerning systems that generate non-consensual sexually explicit content or child sexual abuse material; end of the transitional period of Article 50(2) for systems already placed on the market. Regulation (EU) 2026/1744
2-12-2027 Obligations for high-risk systems under Annex III. Regulation (EU) 2026/1744
2-8-2028 Obligations for high-risk systems linked to products under Annex I. Regulation (EU) 2026/1744

Regulation (EU) 2026/1744 (Digital Omnibus on AI) was published in the Official Journal on 24-07-2026 and entered into force on 27-07-2026. It also amends Article 4 (literacy), simplifies the information to be registered by providers applying the exception in Article 6(3) and broadens the basis for processing special categories of data for the purpose of detecting and correcting bias. The consolidated text in force must be consulted before applying this document, because the numbering and content of some paragraphs may have changed.


02What is inventoried

2.1 The four types of use

All AI systems of the four types of use in 01 §1.2 are inventoried, regardless of their risk or of who developed them.

Type of use What is recorded Unit of record Level of detail
AI use case Each system that forms part of an in-house use case: predictive models, generative AI solutions, agents, AI-enabled automations developed or adapted by the company. One record per deployed system. A use case may have several systems and a system may serve several use cases. Full.
Third-party AI embedded in processes Supplier software with AI functions that play a part in decisions, operations or customer relationships. One record per AI function with a distinct purpose within the product. Full.
Corporate use of general-purpose AI Assistants, productivity suites and tools in the authorised catalogue (document 31). One record per authorised tool; specific uses are not recorded individually unless they move to the full cycle. Reduced, with licences and conditions.
Unauthorised use Tools detected without approval. One record per tool and detection scope. Minimum, until regularised.

2.2 Borderline cases

Case Is it inventoried? Criterion
Deterministic business rules without inference Yes, as "Rules (not AI)", when they have been presented or perceived as AI. Avoids recurring discussions and documents the conclusion of step 1 of the tree.
AI system under testing in an isolated environment without real data Yes, with status "Under evaluation". Makes it possible to detect a move to real use without a gate.
General-purpose AI model procured via API, with no system built on top of it Recorded as a supplier component in T09 and linked to the systems that use it. The model is not in itself an AI system; the systems that integrate it are.
AI function of a contracted product that is disabled Yes, with status "Under evaluation" or "Retired" depending on the decision, in order to control its future activation. Document 31 §5.6.
AI used by a supplier to provide an outsourced service to the company Yes, when it plays a part in decisions about the company's customers or employees or processes its data. Third-party risk (document 36).
AI-enabled security tools (threat detection) Yes. They process data and may take automatic actions.
Personal use outside work No. Outside the company's scope.

03Inventory fields

3.1 Conventions

3.2 Identification and owners

Field Description Type Mandatory Values
System code Persistent identifier. Text Yes SIA-AAAA-NNN
Name Name used in the company. Text Yes —
What it is and what it is used for Explanation understandable to a non-specialist (measurement rule 10). Long text Yes One or two sentences
Type of use Type in 01 §1.2. List Yes AI use case · Third-party AI embedded in processes · Corporate use of general-purpose AI · Unauthorised use
Linked use cases Use cases in the register that use the system. Multiple reference Cond.: use case and embedded third-party AI types IA-AAAA-NNN
Responsible area Unit that uses the system and is accountable for it. List (company catalogue) Yes —
Legal entity Group company that deploys it. List Cond.: groups —
Registration date Date of registration in the inventory. Date Yes —
Registration origin How it reached the inventory. List Yes C1 Diagnosis · Procurement or renewal · Technical detection · Internal report · Audit · Supplier notice (phase 0)
System owner Person accountable for the use: the use case's AI Product Owner or, for corporate use, the designated service owner. Person Yes (except unauthorised use: owner of the regularisation) —
Sponsor AI Sponsor. Person Cond.: use case and embedded third-party AI types —
Technical owner AI Technical Owner. Person Cond.: in development or production —
Operations owner AI Operations Owner. Person Cond.: in production —
Risk owner AI Risk Owner. Person Yes, from the provisional classification —

3.3 Technical and usage description

Field Description Type Mandatory Values
System status Status of the system (distinct from the use case status in 03 §3.2). List Yes Under evaluation · In development · Pilot · In production · Suspended · Retired · Blocked
Technology Taxonomy in 03 §3.3. Multiple list Yes Predictive ML · Generative AI · Agent · Language and document processing · Vision · Optimisation · Embedded third-party AI · Rules (not AI)
Exposure Taxonomy in 03 §3.3. List Yes Internal · Employees · Customers indirectly · Customers or external persons directly
Primary sphere Taxonomy in 03 §3.3. List Cond.: use case and embedded third-party AI types 01 Customer … 09 AI governance
Intensity Lite or Enterprise (01 §9). List Cond.: use case and embedded third-party AI types Lite · Enterprise
Autonomy Level in the common specification (§5.4). List Yes A0 Assistance · A1 Recommendation · A2 Supervised action · A3 Autonomous action
Actions it can execute For A2 and A3. Multiple list Cond.: A2 or A3 Read · Write to systems · External communications · Payments or financial commitments · Changes to production systems
Decisions about people Whether the output significantly influences decisions about people. Yes/No Yes —
Scope of the decision about people Which decisions. Multiple list Cond.: decisions about people = Yes Employment and labour relations · Credit · Insurance · Access to essential services · Education · Healthcare · Other (specify)
Human oversight Type of oversight defined in the design (P17). List Cond.: in production Validation of each output · Sample-based review · Oversight of aggregates with kill switch · None
Kill switch A tested mechanism exists to stop the system. List Cond.: in production Yes, tested · Yes, untested · No · Not applicable
Go-live date Date of G5 or start of real use. Date Cond.: in production —
Users or volume Active users or volume of use. Number Ent. —
Assigned and active licences Corporate use only. Number Cond.: corporate use —
Catalogue category Corporate use only (document 31 §4.2). List Cond.: corporate use Authorised · Authorised with restrictions · Not authorised

3.4 Regulatory classification

Field Description Type Mandatory Values
Is it an AI system? Result of step 1 of the tree. List Yes Yes · No · Uncertain (requires legal review)
Scope exclusion Result of step 2. List Cond.: is an AI system None · National security or defence · Scientific research · Research and development prior to placing on the market · Other (specify)
Regulatory classification Taxonomy in 03 §3.3. If several apply, the most demanding is recorded and the others in the following fields. List Yes Prohibited · High risk · Transparency obligations · Minimal risk · Out of scope · Pending classification
Classification status Provisional (phase 0) or final (phase 3). List Yes Provisional · Final · Under review
High-risk basis Why it is high-risk. List Cond.: high risk Annex I (safety component or product) · Annex III
Annex III point Specific area. List Cond.: Annex III basis, or Article 6(3) exception 1 Biometrics · 2 Critical infrastructure · 3 Education and vocational training · 4 Employment, workers' management and access to self-employment · 5 Access to and enjoyment of essential private services and essential public services and benefits · 6 Law enforcement · 7 Migration, asylum and border control management · 8 Administration of justice and democratic processes (with letter)
Article 6(3) exception Condition applied to conclude that an Annex III system is not high-risk. List Cond.: Annex III not high risk a) Narrow procedural task · b) Improvement of the result of a previously completed human activity · c) Detection of patterns without replacing or influencing the previously completed human assessment · d) Preparatory task
Profiling Whether the system performs profiling of natural persons (prevents application of the Article 6(3) exception). Yes/No Cond.: Annex III —
Transparency obligations Applicable paragraphs of Article 50, including where the system is high-risk. Multiple list Yes None · 50(1) Interaction with persons · 50(2) Marking of synthetic content · 50(3) Emotion recognition or biometric categorisation · 50(4) Deep fakes and text on matters of public interest
Company role Role under the Regulation (section 4). Multiple list Cond.: within scope Provider · Deployer · Importer · Distributor · Authorised representative · Product manufacturer
Possible assumption of the provider role Case under Article 25(1) that may make the company the provider of a high-risk system. List Cond.: third-party high-risk system No · Own name or trademark · Substantial modification · Change of intended purpose
Underlying general-purpose AI model Model and provider. Text Cond.: generative AI or agent technology —
Relationship with the general-purpose model What the company does with the model. List Cond.: there is a general-purpose model Use via API or service · Fine-tuning or modification of the model · In-house development of the model · Placing the model on the market
Model with systemic risk According to the provider's information or the Commission's designation. List Cond.: there is a general-purpose model Yes · No · No data
Obligations application date Date from which the main obligations apply (section 1.1). Date Cond.: within scope —
Classification rationale Reasoning through the steps of the tree, with references. Long text Yes —
Legal review Whether the classification has had qualified legal input. Yes/No Yes for the final classification —
Classified by · date AI Risk Owner and date. Person · Date Yes —
Next review Scheduled review date. Date Yes —

3.5 Assessments and obligations

Common statuses: Done · Pending · Not applicable, consistent with the board dashboard data schema. Each assessment with status Done links to its evidence, version and date (03 §2, principle 4).

Field Description Type Mandatory
Data protection impact assessment (GDPR, Article 35) Status, date, link. List · Date · Reference Yes if it processes personal data
Fundamental rights impact assessment (Article 27) Status, date, link, date of notification to the authority. List · Date · Reference Cond.: cases in section 6.2
Conformity assessment (Article 43) Status; procedure (internal control or notified body); EU declaration of conformity. List · Reference Cond.: the company is the provider of a high-risk system
Documentation of the Article 6(3) exception Assessment documented before placing on the market or putting into service. List · Reference Cond.: exception applied as provider
Registration in the EU database (Article 49) Status and registration reference. List · Text Cond.: Annex III high risk, Article 6(3) exception as provider, or deployer that is a public authority
Information to workers and their representatives Article 26(7) of the Regulation and, in Spain, Article 64.4.d) of the Workers' Statute. List · Date Cond.: use in the employment context
Security assessment Document 35; includes prompt injection testing for generative AI and agents. List · Date Ent.; Yes if A2 or A3
Supplier assessment P14, document 36. List · Reference Cond.: there is a supplier
Provider's instructions for use Available and applied (Article 26(1)). List Cond.: deployer of a high-risk system
Log retention Retention period for automatically generated logs (at least six months for deployers of high-risk systems, Article 26(6), unless otherwise provided by other legislation). Number (months) Cond.: high risk

3.6 Data, third parties, risk and lifecycle

Field Description Type Mandatory Values
Categories of information processed Highest level of information it processes. Multiple list Yes No personal data · Personal data · Special categories of data · [Confidential] information · [Restricted] information
Legal basis for processing For personal data. Text Cond.: personal data —
Use of data by the supplier for training Contractual condition. List Cond.: there is a supplier No · Yes · No data
Location of processing Where the data are processed. List Cond.: there is a supplier European Economic Area · Outside with appropriate safeguards · No data
Suppliers Third parties involved. Multiple reference (T09) Cond.: there is a supplier —
Third-party requirement level Common specification §5.6. List Cond.: there is a supplier N1 Standard · N2 Enhanced · N3 Critical
Main residual risk Common specification §5.1. List Cond.: final classification Low · Medium · High · Critical
Open nonconformities Number and link to T08. Number · Reference Yes (0 if none) —
Incidents in the last 12 months Number by severity. Number Cond.: in production S1 · S2 · S3 · S4
Last continuity review (R6) Date. Date Cond.: in production —
Next continuity review Quarterly in Enterprise, half-yearly in Lite. Date Cond.: in production —
Annual recurring cost Reference to the per-case calculation (document 42). Amount (€) with status Ent. Validated · Declared · Estimated
Removal date Date of retirement or blocking. Date Cond.: retired or blocked —
Removal reason Taxonomy in 03 §3.3. List Cond.: retired No plausible value · Hypothesis refuted · Insufficient data · Technically unfeasible · Cost exceeds value · Unacceptable risk · Regulation · No adoption · Replaced by another solution · Change in strategic priority
Removal decision-maker · replacement Body that decides and system that replaces it. Person or body · Reference Cond.: retired —
Treatment of data and models on removal Retention, deletion or transfer; confirmation from the supplier. Long text Cond.: retired —

3.7 Minimum fields by type of use

Block Use case Embedded third-party AI Corporate use Unauthorised use
Identification and owners Full Full Without sponsor Code, name, what it is, type, area, registration, origin, owner of the regularisation
Technical and usage description Full Full Status, technology, exposure, autonomy, licences, category Status, technology, autonomy
Regulatory classification Full Full Is AI, classification, transparency, role, general-purpose model Provisional classification
Assessments According to classification According to classification Data protection, supplier, security —
Data, third parties, risk and lifecycle Full Full Information processed, use of data by the supplier, location, supplier, level Information exposed, supplier, nonconformity

3.8 Mapping to the board dashboard schema

The inventory feeds the dashboard (T17). Main mappings to the dashboard data schema: reporte_compania.clasificacion_ria (prohibido, alto_riesgo, transparencia, minimo, no_es_ia) is obtained from Regulatory classification (Out of scope because it is not AI → no_es_ia); reporte_compania.controles (RIA, FRIA, DPIA, seguridad…) from section 3.5; tags.exposicion and tags.tecnologia from section 3.3; the case estado (En uso, En desarrollo, POC, Desenganchado) from System status (In production → En uso; In development → En desarrollo; Pilot → POC; Retired → Desenganchado). Differences in nomenclature will be resolved when T17 is adapted (document 03, wave 1).


04Company roles under the AI Act

Obligations depend on the role the company has in relation to each system, not on the system in the abstract. The same company may have different roles for different systems, and more than one role for the same system.

Role Summary definition (Article 3) Typical situation in a company Main obligations if the system is high-risk
Provider (3(3)) Whoever develops an AI system or a general-purpose AI model, or has one developed, and places it on the market or puts it into service under its own name or trademark, whether for payment or free of charge. The company develops its own system —including on top of a third party's general-purpose model— and puts it into service for internal use or for its customers. Requirements of Chapter III, Section 2 (risk management, data, technical documentation, record-keeping, transparency, human oversight, accuracy, robustness and cybersecurity); quality management system; conformity assessment; EU declaration of conformity and CE marking; registration; post-market monitoring; reporting of serious incidents (Articles 16, 17, 43, 47–49, 72 and 73).
Deployer (3(4)) Whoever uses an AI system under its own authority, except where it is used in the course of a personal non-professional activity. The company uses supplier software with AI, or a system developed by another group company. Use in accordance with the instructions; human oversight by competent persons; control of input data; monitoring of operation and informing the provider; log retention; informing workers; informing affected persons; fundamental rights impact assessment where applicable (Articles 26 and 27); explanation of individual decisions where appropriate (Article 86).
Importer (3(6)) Person established in the Union that places on the market a system bearing the name or trademark of a person established outside the Union. European subsidiary that markets a system of its non-EU parent company. Verifications prior to placing on the market (Article 23).
Distributor (3(7)) Person in the supply chain, other than the provider or the importer, that makes a system available on the Union market. Company that resells third-party AI-enabled software to its customers. Verifications of marking, documentation and instructions (Article 24).
Authorised representative Person established in the Union with a written mandate from a provider established outside the Union. Rare in user companies. Tasks under the mandate (Article 22).
Product manufacturer Manufacturer that places on the market an Annex I product with an AI system as a safety component under its own name or trademark. Industrial, machinery or medical device manufacturers. Considered the provider of the high-risk system (Article 25(3)).

4.1 When a deployer becomes a provider

Under Article 25(1), a distributor, importer, deployer or other third party is considered a provider of a high-risk AI system when it:

This analysis is particularly relevant when the company adapts third-party software or reuses a system for a different purpose. It is recorded in the field Possible assumption of the provider role and reviewed at each change.

4.2 General-purpose AI models

Situation Usual role Consequences
The company uses a third party's general-purpose model via API to build its own system. Provider of the system (if it puts it into service under its own name) and user of the model. The obligations of the model provider (Articles 53 and 55) fall on the third party; the company is accountable for the system according to its classification. It should obtain from the model provider the information necessary to comply.
The company fine-tunes or modifies a general-purpose model. It may become the provider of the modified model to the extent of the modification, according to the Commission's criteria and guidelines in force. Requires specific legal analysis.
The company develops and markets its own general-purpose model. Model provider. Obligations under Article 53 and, if it has systemic risk, Article 55.
The company uses a general-purpose assistant from a supplier (corporate use). Deployer of the system. Normally minimal risk or transparency; high risk only if it is used for an Annex III purpose.

The obligations of providers of general-purpose AI models have applied since 2-8-2025. A company that integrates third-party models should record in T09 the documentation made available to it by the model provider.


05Regulatory classification tree

5.1 Graphical representation

Classification tree under the AI Act
Each answer must be justified in the inventory
flowchart TD
  P1{"1. Is it an AI system under Article 3(1)?"}
  P1 -->|"No"| NOIA["Out of scope: record as Rules or not AI"]
  P1 -->|"Yes"| P2{"2. Does an Article 2 exclusion apply?"}
  P2 -->|"Yes"| EXC["Out of scope: document the exclusion"]
  P2 -->|"No"| P3{"3. Is it a prohibited practice under Article 5?"}
  P3 -->|"Yes"| PRO["Prohibited: does not go beyond phase 3"]
  P3 -->|"No"| P4{"4. Is it a safety component or product under Annex I with third-party assessment?"}
  P4 -->|"Yes"| AR["High risk"]
  P4 -->|"No"| P5{"5. Is its purpose listed in Annex III?"}
  P5 -->|"No"| P7{"7. Does it have Article 50 obligations?"}
  P5 -->|"Yes"| P6{"6. Does it meet an Article 6(3) condition and not perform profiling?"}
  P6 -->|"No"| AR
  P6 -->|"Yes, documented"| P7
  AR -.->|"Also check"| P7
  P7 -->|"Yes"| TRA["Transparency obligations"]
  P7 -->|"No"| MIN["Minimal risk"]
  classDef ok fill:#d9ebe0,stroke:#0d7680,color:#1a1817
  classDef med fill:#f2dfce,stroke:#0f5499,color:#1a1817
  classDef ko fill:#f3d3da,stroke:#990f3d,color:#1a1817
  class NOIA,EXC,MIN ok
  class TRA med
  class AR,PRO ko
Source: SEVEN-G

After steps 1 to 7, the tree continues with two steps that do not change the category but do change the obligations: 8. Company role (section 4) and 9. Resulting assessments (section 6).

5.2 Tree table

Step Question How it is answered Evidence in P11 Result
1 Is it an AI system under Article 3(1)? Check whether it is a machine-based system that, with some level of autonomy, infers from the input it receives how to generate outputs (predictions, content, recommendations or decisions) that can influence physical or virtual environments. Use the Commission guidelines on the definition of an AI system. Systems based solely on rules defined by people to execute operations automatically do not usually meet the definition. Description of how it works; technique used; reasoned conclusion. No → Out of scope (technology "Rules (not AI)"). Uncertain → legal review. Yes → step 2.
2 Does an exclusion under Article 2 apply? Review, among others: exclusively military, defence or national security purposes (2(3)); scientific research and development as the sole purpose (2(6)); research, testing or development activities prior to placing on the market or putting into service, except testing in real-world conditions (2(8)); free and open-source licences, subject to the exceptions in Article 2(12). Exclusion applied and reason. Yes → Out of scope (it remains in the inventory and is reviewed if the use changes). No → step 3.
3 Is it a prohibited practice under Article 5? Compare against each case in Article 5(1): subliminal, manipulative or deceptive techniques that distort behaviour causing harm; exploitation of vulnerabilities due to age, disability or social or economic situation; social scoring leading to detrimental treatment; prediction of the risk of committing a criminal offence based solely on profiling or personality traits; creation or expansion of facial recognition databases through untargeted scraping; inference of emotions in the workplace or in educational institutions, except for medical or safety reasons; biometric categorisation to infer sensitive characteristics; real-time remote biometric identification in publicly accessible spaces for law enforcement purposes outside the permitted cases; and the prohibition added by Regulation (EU) 2026/1744 on the generation of non-consensual sexually explicit content or child sexual abuse material (applicable from 2-12-2026). Use the Commission guidelines on prohibited practices. Analysis of each point with a conclusion. Yes → Prohibited: the use case does not go beyond phase 3; if the system is in use, immediate suspension and critical nonconformity. No → step 4.
4 Is it high-risk under Annex I (Article 6(1))? Two cumulative conditions: the system is a safety component of a product, or is itself a product, covered by the Union harmonisation legislation listed in Annex I; and that product is required to undergo a third-party conformity assessment under that legislation. Applicable legislation and the product's assessment procedure. Yes → High risk (Annex I; obligations from 2-8-2028) and step 7. No → step 5.
5 Is its intended purpose listed in Annex III (Article 6(2))? Compare the purpose with the eight areas of Annex III and their points. In private companies, pay attention to: 1 (biometrics), 2 (safety components of critical infrastructure), 3 (education and vocational training), 4 (recruitment and selection; decisions on working conditions, promotion, termination, task allocation based on behaviour or traits, and monitoring and evaluation of performance), 5(b) (creditworthiness and credit scoring, except for the detection of financial fraud), 5(c) (risk assessment and pricing in life and health insurance). Annex III point and letter, or conclusion that it does not apply. No → step 7. Yes → step 6.
6 Does the Article 6(3) exception apply? The Annex III system is not considered high-risk if it does not pose a significant risk of harm to health, safety or fundamental rights, including by not materially influencing the outcome of decision-making, and it meets at least one condition: a) narrow procedural task; b) improvement of the result of a previously completed human activity; c) detection of decision-making patterns or deviations without replacing or influencing the previously completed human assessment without proper human review; d) preparatory task to an assessment relevant for the purposes of the Annex III use cases. It never applies if the system performs profiling of natural persons. Use the Commission guidelines on the application of Article 6 provided for in paragraph 5 thereof, when available in their current version. Condition applied, analysis of influence on the decision, confirmation that no profiling is performed. If the company is the provider: assessment documented before putting into service and registration (Articles 6(4) and 49(2)). No → High risk (Annex III; obligations from 2-12-2027) and step 7. Yes → step 7 with the exception documented.
7 Does it have transparency obligations under Article 50? 50(1): the provider ensures that people know they are interacting with an AI system, unless this is obvious. 50(2): the provider marks synthetic audio, image, video or text content in a machine-readable format. 50(3): the deployer informs people exposed to emotion recognition or biometric categorisation. 50(4): the deployer discloses that images, audio or video are deep fakes, and that text published to inform the public on matters of public interest has been generated or manipulated, unless there is human review or editorial control with editorial responsibility. It is checked also for high-risk systems. Applicable paragraphs and obliged role. Yes → Transparency obligations (if not high-risk). No → Minimal risk.
8 What role does the company have? Section 4, including Article 25 and the relationship with general-purpose models. Role or roles and justification. Determines which obligations apply.
9 Which assessments follow? Section 6. Required assessments with status. Assessment plan in phase 3.

5.3 Application rules

  1. Provisional classification in phase 0 and final classification in phase 3. The provisional classification guides intensity and roles; the final classification requires qualified legal judgement and is a condition for G3.
  2. The intended purpose prevails. Classification is based on the intended use and the reasonably foreseeable use, not on the technology.
  3. When in doubt, the most demanding category applies while the matter is resolved, and it is recorded as "Under review" with a deadline.
  4. A single main category, the most demanding one, plus any applicable paragraphs of Article 50 (section 3.4).
  5. "Pending classification" has a time limit. No system may pass G3 or remain in production beyond the time limit approved in C2 with a pending classification.
  6. Application dates do not delay classification. An Annex III high-risk system is classified as such from today, even if its obligations apply from 2-12-2027; this way, the design incorporates the requirements in time. For systems already in service before those dates, the transitional regime of Article 111 in its current version must be analysed.
  7. The Article 6(3) exception is applied restrictively and is reviewed if the degree of influence of the system on the decision changes.
  8. Other legislation is assessed in parallel. The tree covers the AI Act; data protection, sector-specific regulation, DORA or NIS2 are mapped in document 34 and may require controls even if the system is minimal risk.

5.4 Illustrative examples

Fictitious cases for teaching purposes. The actual classification depends on the specific analysis.

Illustrative system Summary analysis Indicative classification
Internal assistant that summarises technical documentation for employees AI; no exclusion; not prohibited; not Annex I or III; does not interact with external persons; the assistant's provider already discloses that it is AI. Minimal risk
Customer service conversational assistant on the website AI; not Annex III; direct interaction with people (50(1)). Transparency obligations
System that ranks and filters applications in a recruitment process Annex III, point 4(a); filters and evaluates candidates; performs profiling. Exception 6(3) not applicable. High risk
Tool that corrects the wording of job advertisements already written by a person Related to point 4(a), but improves the result of a previously completed human activity without evaluating people (6(3)(b)), without profiling. Minimal risk with documented exception (legal review)
Health insurance pricing model for natural persons Annex III, point 5(c). High risk; fundamental rights impact assessment as deployer
Payment fraud detection Expressly excluded from point 5(b); no other categories. Minimal risk (with other applicable legislation)
Analysis of employees' emotions in calls to evaluate their performance Inference of emotions in the workplace without a medical or safety reason. Prohibited

06Resulting assessments

6.1 Data protection impact assessment (GDPR, Article 35)

Aspect Content
When it is mandatory Where a type of processing, in particular using new technologies, is likely to result in a high risk to rights and freedoms. Article 35(3) requires it in particular in the case of: a) a systematic and extensive evaluation of personal aspects based on automated processing, including profiling, on which decisions producing legal or similarly significant effects are based; b) large-scale processing of special categories of data or of data relating to criminal convictions and offences; c) systematic monitoring of a publicly accessible area on a large scale. The lists of processing operations requiring an assessment published by the competent supervisory authority (in Spain, the Spanish Data Protection Agency) must also be consulted.
Who carries it out The controller, with the advice of the data protection officer. In SEVEN-G, coordinated by the AI Risk Owner.
When in the cycle Phase 3 (before G3) and updated in phase 4 with the design. Always before processing begins.
Relationship with the AI Act The deployer of a high-risk system uses the information from the provider (Article 13) to carry it out (Article 26(9)). The fundamental rights impact assessment complements it (Article 27(4)).
Prior consultation If the residual risk remains high, consultation of the supervisory authority (GDPR, Article 36). In SEVEN-G, in addition, High or Critical residual risk with its level of acceptance (document 30 §7.2).
Template P11 (need) and P47 (assessment); it may link to the company's own methodology.

6.2 Fundamental rights impact assessment (AI Act, Article 27)

Aspect Content
Who must carry it out Before deploying a high-risk system referred to in Article 6(2) (Annex III), except those in point 2 (critical infrastructure): deployers that are bodies governed by public law or private entities providing public services, and deployers of systems referred to in Annex III, points 5(b) (creditworthiness and credit scoring) and 5(c) (risk assessment and pricing in life and health insurance).
Minimum content a) description of the processes in which the system will be used in line with its intended purpose; b) period and frequency of use; c) categories of natural persons and groups affected; d) specific risks of harm to those persons, taking into account the information from the provider; e) human oversight measures according to the instructions for use; f) measures to be taken if the risks materialise, including internal governance arrangements and complaint mechanisms.
When Before first use; updated if the assessed elements change. In SEVEN-G: phase 3, reviewed in phase 5 and at R6.
Notification The deployer notifies the market surveillance authority of the results, using the template provided by the European AI Office, under the terms of Article 27(3) and (5).
Temporal applicability Linked to the application of the Annex III obligations (2-12-2027 following Regulation (EU) 2026/1744). SEVEN-G recommends carrying it out from the design stage for the systems concerned.
Voluntary use Where it is not mandatory, the company may use its structure for systems involving significant decisions about people. It may draw on ISO/IEC 42005:2025 (AI system impact assessment).
Template P11 (need) and P48 (assessment and notification).

6.3 Conformity assessment and provider obligations

Aspect Content
Who The company when it is the provider of a high-risk system, directly or under Article 25.
When Before placing it on the market or putting it into service. In SEVEN-G, prepared in phases 4–5 and completed before G5. It is repeated in the event of substantial modifications.
Procedure Article 43: for systems in Annex III, points 2 to 8, the internal control procedure (Annex VI); for those in point 1 (biometrics), internal control or involvement of a notified body depending on whether harmonised standards or common specifications are applied; for those in Annex I, the procedure under the relevant sectoral legislation.
Result Technical documentation, quality management system, EU declaration of conformity (Article 47), CE marking (Article 48), registration (Article 49), post-market monitoring plan (Article 72).
If the company is only a deployer It does not carry out the conformity assessment, but must verify in the supplier assessment (P14) that the system has one and has instructions for use, and must comply with its obligations under Article 26.
Templates SEVEN-G does not include templates for the technical documentation, the quality management system or the EU declaration of conformity: a company acting as provider prepares them with the harmonised standards and its own quality management system. The post-market monitoring plan relies on P24 and P25, and the fundamental rights impact assessment on P48.

6.4 Assessment matrix by classification and role

Classification Provider Deployer Always (SEVEN-G)
Prohibited Not developed. Not used. Critical nonconformity if it exists.
High risk Chapter III requirements, conformity assessment, registration, post-market monitoring, reporting of serious incidents. Article 26; fundamental rights impact assessment in the cases in 6.2; supplier assessment. Enterprise intensity; risks (P12); security; data protection impact assessment if it processes personal data.
Article 6(3) exception Documented assessment and registration. Verify the provider's documentation. Legal review; review at R6.
Transparency obligations 50(1) and 50(2). 50(3) and 50(4). Verification of the transparency mechanism at G5.
Minimal risk — — Proportionate risks; data protection impact assessment where appropriate; literacy (Article 4).
Out of scope — — Recorded justification; other applicable legislation.

07Registration, review and removal procedures

7.1 Registration

Step Activity Owner Reference time limit Evidence
1 Identify the system (phase 0, procurement, technical detection, report, audit, supplier notice). Whoever identifies it — Recorded request or detection
2 Create the record with the minimum fields for the type of use and assign code SIA-AAAA-NNN. AI Office 5 working days from identification P05 record in T02
3 Designate the system owner and the risk owner. Area and second line Upon registration P05 record
4 Provisional classification (steps 1–7 of the tree) with T07. AI Risk Owner 10 working days from registration Provisional classification in P11
5 Determine intensity (P04) and link to the use case, where applicable. Sponsor, verified In phase 0 P04
6 If it is unauthorised use: open a nonconformity and a regularisation plan (document 31 §5). AI Office Upon registration Record in T08
7 Final classification with legal review and assessment plan. AI Risk Owner Before G3 Final P11
8 Verification of the record. AI Auditor (Enterprise) or AI Office (Lite) At G0 and G3 Verification record

7.2 Review

Type of review When What is reviewed Owner
Scheduled At each R6 (quarterly Enterprise, half-yearly Lite) and at least annually for corporate use. Currency of all fields; classification; assessments; owners. System owner with the AI Risk Owner
Event-driven Change of purpose, data, autonomy, exposure, supplier or underlying model; substantial modification; S1 or S2 incident; new supplier version with AI functions; regulatory change or new Commission guidelines. Classification, role (Article 25) and affected assessments. AI Risk Owner
Annual inventory review C1 / C5. Completeness and quality of the inventory (section 8); reconciliation with procurement, architecture and security (section 9). AI Office
Audit-driven According to plan (document 38). Sample of records against reality. AI Auditor

Every change of classification generates an event in the register (03 §3.3) with date, author and reason. A change to High risk during operation requires the intensity to be reviewed and may bring G7 forward (01 §6.8).

7.3 Removal

Step Activity Owner
1 Retirement decision at G7 or blocking in the regularisation of unauthorised use. Competent body (document 30 §7.3)
2 Execute the retirement plan (P30, T22): deactivation, replacement, communication to those affected. AI Operations Owner
3 Treatment of data and models: retention of logs and documentation for the legal periods, deletion or return by the supplier with confirmation. AI Technical Owner with data protection
4 Update the record: status Retired or Blocked, date, coded reason, decision-maker, replacement. AI Office
5 Update external registers where appropriate (for example, the EU database). AI Risk Owner
6 Verify that the system is no longer in use (technical test and consultation of users). AI Auditor or AI Office

The record of a retired system is not deleted. It is kept with its history for traceability, audit and learning (retirement reasons).


08Inventory quality

8.1 Indicators

# Indicator Formula Indicative target Frequency
Q1 Completeness Records with all mandatory fields for their type ÷ active records ≥ 95 % Monthly
Q2 Timely classification Systems with classification "Pending classification" or "Under review" past the time limit 0 Monthly
Q3 Final classification with legal review Systems in production with final classification and legal review ÷ systems in production 100 % Quarterly
Q4 Assessments up to date Required assessments with status Done and current ÷ required assessments 100 % in production Quarterly
Q5 Currency Records reviewed within their review frequency ÷ active records ≥ 95 % Monthly
Q6 Accuracy Records without relevant discrepancies in the audit sample ÷ records in the sample ≥ 90 % Annual or per audit
Q7 Coverage Systems detected by sources external to the inventory (section 9) that were not inventoried ÷ total systems known at close Decreasing trend; target < 5 % Quarterly
Q8 Registration time Median days between identification and registration; between registration and provisional classification ≤ 5 and ≤ 10 working days Quarterly

The targets are reference values to start with; the company sets them in C2 and recalibrates them in C5.

8.2 Quality rules

  1. A system in production without a complete record and final classification is a major nonconformity; if it is also high-risk or prohibited, it is critical.
  2. Records are not filled in with undeclared estimates. "No data" is recorded as such.
  3. Mandatory reconciliation between T02 (systems) and T01 (use cases): every use case in phases 4–7 must have at least one linked system, and every system of the use case type must have a use case.
  4. Named owner, not a generic area.
  5. History retained: changes do not overwrite without recording the previous value.

09Detection of uninventoried systems

The inventory is only reliable if it is checked against independent sources. The AI Office must carry out, at least quarterly, a reconciliation with the following sources and record the differences.

Source What to look for Responsible for providing the information
Application register and enterprise architecture Applications with uninventoried AI components. Technology
Contracts, procurement and renewals Products and services with AI functions; clauses on AI or on the use of data for training. Procurement
AI supplier register (T09) and ICT third-party provider register (DORA, where applicable) Suppliers with AI services without a linked system. Second line
Cloud billing and model API consumption Consumption of model services or AI platforms without an associated use case. Finance and technology
Code repositories and data platforms Projects that use AI libraries or services, deployed models. Technology
Records of processing activities (GDPR, Article 30) Processing operations that mention profiling, scoring, automation or AI. Data protection
Browsing, data loss prevention and device management logs Unauthorised use (document 31 §5.2). Security
Expense claims and corporate cards Individual subscriptions. Finance
Release notes from relevant suppliers New AI functions in contracted software. System owners
Internal reports, surveys and audits Declared or detected uses. AI Office and internal audit

Treatment of findings

Situation Treatment
AI system authorised through another route but not inventoried Immediate registration; minor or major nonconformity depending on its status and classification.
System in production without a gate Critical nonconformity (01 §12); containment; regularisation through a review equivalent to G7.
Embedded AI function enabled without a decision Process in 31 §5.6; nonconformity depending on data and exposure.
Unauthorised use Process in 31 §5.
False positive (not AI) Recorded as "Rules (not AI)" if recurrent; otherwise, the conclusion is documented in the reconciliation report.

The result of the reconciliation feeds indicator Q7 and is reported to the AI Committee within the corporate AI use monitor (T21), the quarterly second-line report (P42) and the C4 report.


10Associated tools and templates

Name Use in this document
AI system inventory (T02) Implements the fields in section 3, the procedures in section 7 and the indicators in section 8.
Regulatory classifier (T07) Guided questionnaire covering steps 1 to 9 of the tree; generates the provisional classification and the assessment plan, and records the rationale and date. It must be updated when the consolidated text of the Regulation or the Commission guidelines change.
AI system inventory record (P05) Evidence of inventory registration (phase 0).
Regulatory classification and impact assessments (P11) Evidence of the classification (phase 3) and of the resulting assessments.
Data protection impact assessment (P47) Assessment required under section 6.1.
Fundamental rights impact assessment (P48) Assessment and notification required under section 6.2.
Quarterly second-line report (P42) Reports the reconciliation of section 9 and indicator Q7 to the AI Committee.
Use case register (T01) System–use case link and classification change events.
Intensity determination (T04) Uses the classification and autonomy from the inventory.
AI supplier register (T09) Linked suppliers and general-purpose models.
Board AI dashboard (T17) Receives the classification and control status (section 3.8).
Corporate AI use monitor (T21) Receives corporate and unauthorised uses, and indicator Q7.

Document Relationship
01 · Foundational methodology Types of use (§1.2), phase 0 and phase 3, Enterprise criteria, declaration of application (§14).
03 · Tools and use case register Controlled taxonomy, data model and events.
21 · Gate and audit criteria G0 and G3 criteria on inventory and classification.
30 · Governance model Responsibilities for the inventory and classification.
31 · Corporate policy and acceptable use Corporate use, embedded AI and unauthorised use.
33 · AI risk methodology Main residual risk.
34 · Regulatory mapping Detailed obligations by article, role and phase.
35 · AI and agent security Autonomy and security assessment.
36 · AI third parties and suppliers Assessment of suppliers and general-purpose models.
37 · Nonconformities and incidents Treatment of uninventoried and misclassified systems.
38 · AI audit framework The inventory as the audit universe.

This document does not constitute legal advice. The regulatory classification of each system must be carried out with qualified legal judgement and with the consolidated text in force of Regulation (EU) 2024/1689 and the guidelines of the European Commission.


12Version control

Version Date Changes
0.1 16-09-2026 First version. Defines the scope of the inventory by type of use, the fields with type, mandatory status and value lists consistent with the taxonomy in 03, the roles under the AI Act (including Article 25 and general-purpose models), the nine-step classification tree, the resulting assessments (data protection, fundamental rights, conformity), the registration, review and removal procedures, the quality indicators and the reconciliation to detect uninventoried systems. Incorporates the application dates amended by Regulation (EU) 2026/1744 (consulted on 16-09-2026). Proposes the code SIA-AAAA-NNN.

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.