Template P48 · Fundamental rights impact assessment

Fundamental rights impact assessment

Documents the fundamental rights impact assessment that the AI Act requires of certain deployers of high-risk systems before first use, and prepares its notification to the market surveillance authority.

Fernando García VarelaVersion 0.1 (working draft)19-09-2026Draft for review

This template does not constitute legal advice. References consulted in September 2026; the obligation applies with the high-risk obligations of Annex III (2-12-2027 following Regulation (EU) 2026/1744). Verify that they are current (document 34 §3.1 and §3.10).


Why it matters. A high-risk system that decides on credit, insurance or access to public services can harm entire groups without any economic indicator showing it. This assessment requires the company to describe, before first use, the processes in which the system will be used, whom it affects, what harm it may cause and what the company will do if that harm materialises; without it the system cannot lawfully be deployed in the cases where it is mandatory and gate G5 cannot be passed. Carried out from the design stage, it also avoids late redesigns.

01Instructions for use

Aspect Guidance
When it is used It is opened when P11 §9.2 concludes that the assessment is Required, or Recommended and the company decides to carry it out. It is prepared in phase 3, updated in phase 4 with the design, notified before G5 and reviewed in phase 5, at every R6 and whenever any of its elements changes (Article 27.2).
Who completes it The AI Risk Owner, with the second line (legal counsel and compliance) and the AI Product Owner (34 §3.10). The business area that will use the system describes the processes.
Who verifies it Lite: AI Office or AI Auditor. Enterprise: AI Auditor. In practice, high-risk systems are always Enterprise.
Who decides or approves AI Committee; acceptance of the residual risk, according to P12 §6.
Gate or moment Feasibility (determined and started, G3.09); G4 · Design (completed and measures in the design, G4.13); G5 · Go-live (notified, G5.15); R6 (current, R6.08). (G3)
Tool T07 · Regulatory classifier (status, date, link and notification date, 32 §3.5).
Reference document 32 §6.2, 34 §3.10 and §8.2, document 33 (risk scales), document 50 §8 (decisions about people).
Lite versus Enterprise When it is mandatory, all its content is mandatory. Every Enterprise use case with decisions about people should apply this content even if not obliged to (34 §3.10); in that voluntary use it may omit section 10.

Completion rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN.
System code and name SIA-AAAA-NNN from P05 (T02).
System provider Internal or third party (P14).
Intended purpose Copy from P05 and P11.
Classification and Annex III point From P11 §6.2 (for example, 5.b or 5.c).
Company role Deployer (and, where applicable, also provider).
Reference to P11 Version and date.
Reference to P47 If there is a DPIA of the same processing.
Document version
Date DD-MM-AAAA.
Status Draft · Submitted for verification · Approved · Notified · Under review · Superseded.

03Applicability

Question Answer Justification
Is the system high-risk under Article 6.2 (Annex III) and not under point 2 (critical infrastructure)? Yes · No
Is the company a body governed by public law or a private entity providing public services?
Is the system in Annex III, point 5, letter b) (creditworthiness or credit score) or letter c) (risk assessment and pricing in life and health insurance)?
Result Mandatory · Voluntary · Not applicable Mandatory if the first answer is "Yes" and either of the other two is also "Yes".
Date from which it is required With the Annex III obligations. SEVEN-G recommends carrying it out from the design stage (32 §6.2).

04Processes in which the system will be used (Article 27.1.a)

Field Content Guidance
Deployer's processes Description of each process in business language, in line with the intended purpose.
Decisions the system supports or takes What it decides, what it recommends and what a person validates (P17 §5).
Autonomy level A0–A3.
Excluded uses Uses that are not permitted even if the system could perform them.

05Period and frequency of use (Article 27.1.b)

Field Content Guidance
Planned date of first use Date of G5.
Period of use Indefinite with review at R6, or end date.
Frequency Continuous, daily, on request, per campaign.
Volume Decisions or persons assessed per period (order of magnitude).

06Affected persons and groups (Article 27.1.c)

Category of persons or group How the system affects them Approximate volume Vulnerable group? Guidance
Yes · No By age, disability, economic or social situation, or other.
(illustrative example) Applicants for personal loans Their score determines approval and price Around 40,000 applications a year Yes: people with a short credit history

07Specific risks of harm (Article 27.1.d)

Take into account the information provided by the provider (instructions for use) and assess with the common scale (document 33): Level = Likelihood × Impact; Low 1–4 · Medium 5–9 · High 10–15 · Critical 16–25. The dominant axis will usually be "People and rights". Risks of Medium level or above are carried over to P12.

No. Risk of harm (cause, event and consequence) Affected group Right or interest affected Inh. L Inh. I Inherent level Measures (sections 8 and 9) Residual level Code in P12
F01 1–5 1–5 IA-AAAA-NNN · Rnn
F02
(illustrative example) F01 Variables that act as proxies for origin or age cause one group to receive lower scores and to be refused credit or charged more for it. Applicants with a short credit history Non-discrimination; access to essential services 3 4 12 High Exclusion of proxy variables (P16); bias testing before the pilot and in production (P22, P25); human review of refusals (P17) 6 Medium IA-2026-021 · R02

08Human oversight measures (Article 27.1.e)

In accordance with the provider's instructions for use and the design in P17.

Field Content Guidance
Oversight modes Prior validation · Real-time oversight · Sample-based ex post review · Aggregate oversight (P17 §6).
People who exercise oversight Role, competence, training and authority (Article 26.2; P20).
Ability not to use, override or stop the system P17 §7; kill switch (P18, P19).
Consistency with the provider's instructions for use What the provider requires and how it is met.

09Measures if the risks materialise (Article 27.1.f)

Field Content Guidance
Internal governance Who decides to suspend or limit use, escalation and time limits (P26, document 30).
Complaint mechanisms Channel, internal response time and reviewing role (P17 §8; P49).
Explanation of individual decisions How requests are handled (Article 86; P49).
Redress for affected persons Review of decisions already taken, correction and communication.
Information to the provider and the authorities Monitoring and reporting of serious incidents (Article 26.5; P26, P27).

10Notification to the market surveillance authority (Article 27.3)

Field Content Guidance
Competent authority Identified in P11 (AESIA or sector authority; 34 §8.2).
Format used The template provided by the European AI Office, when available; in the meantime, the one indicated by the authority.
Notification date Before G5 (P23).
Reference or acknowledgement
Update notifications Date and reason for each update notified.

11Relationship with the data protection impact assessment (P47)

Element Already recorded in P47? Reference or complement in this assessment
Description of the processing and the data Yes · No
Data protection risks
Risks to other rights (non-discrimination, access to services, effective remedy, others) Only in this assessment.
Common measures

12Conclusion and review

Field Content Guidance
Highest residual level From section 7.
Conclusion The system may be deployed · May be deployed with conditions · May not be deployed.
Conditions Measures that must be verified before G5.
Acceptance of the residual risk Body according to P12 §6. A Critical residual without approval from the board or its board committee blocks G3 and G5.
Next review Next R6 or change of process, group, frequency, provider or instructions for use (Article 27.2; P27).
Date Reason Changes Residual level Is the update notified? Reviewed by
R6 · Change · Incident (phase 5) Yes · No

13Quality criteria

The formal criteria are in document 21 (G3.09, G4.13, G5.15 and R6.08).

# Check Status
1 Applicability matches P11 §9.2 and is justified. Met · Not met · Not applicable · Pending
2 The six elements of Article 27.1 are present: processes, period and frequency, affected persons, risks, human oversight and measures if risks materialise.
3 The provider's information and instructions for use have been used.
4 Risks are assessed with the common scale and those of Medium level or above are in P12.
5 There is an operational complaint mechanism and explanation channel (P17, P49).
6 The DPIA (P47) is reused without duplicating it.
7 The notification to the authority is recorded before G5, with date and reference.
8 It is current at the latest R6 and updates are notified.

14Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Coordinates and prepares AI Risk Owner
Describes processes and oversight AI Product Owner and business area
Validates legally Second line (legal counsel or compliance)
Consulted Data protection officer
Verifies AI Auditor
Approves AI Committee; acceptance of the residual according to P12 §6
☐ Statement: "The organisation confirms that this assessment has been carried out with qualified advice and accepts responsibility for it; SEVEN-G is only a methodological reference." Same body that approves

Segregation of duties: whoever prepares the assessment does not verify it; the area that will use the system does not accept its residual risk.


15Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 19-09-2026 First version. Develops the assessment that P11 §9.2 declares necessary, with the elements of Article 27 set out in 32 §6.2 and 34 §3.10, the notification to the authority and the link with P47 and P12. References consulted in September 2026.

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.