SEVEN-G
Template P74 · 25-09-2026

Template P74 · ISO/IEC 42001 statement of applicability

ISO/IEC 42001 statement of applicability

Records, for each control in Annex A of ISO/IEC 42001, whether it applies to the company, why, where SEVEN-G covers it, with what evidence and its implementation status.

Fernando García VarelaVersion 0.1 (working draft)25-09-2026Draft for review

Warnings for this template. (1) It does not reproduce the standard: it identifies the Annex A controls by their code only and summarises their topic in its own terms; the company's statement must be checked against the text of ISO/IEC 42001 purchased by the company (34 §4.2). (2) SEVEN-G does not certify, and this template does not evidence conformity with the standard (01 §14; document 93): certification of an AI management system can only be issued by an accredited certification body (38 §12). (3) The NIST AI RMF subcategories column is indicative: SEVEN-G proposes it on the basis of 34 §5.4 and of the AIRC crosswalk between the AI RMF and ISO/IEC 42001, prepared on the final draft of the standard.

Why it matters. ISO/IEC 42001 requires the organisation to state which controls it applies, which it excludes and why (clause 6.1.3). This is the piece that turns "aligned with 42001" into something an auditor can verify: without it, the company cannot show that the treatment of its AI risks is complete or prepare for certification. Basing it on SEVEN-G avoids building a second evidence system: each control points to the template, document or tool where the company already keeps the proof.

01Instructions for use

Aspect Guidance
When it is used In C2 · Direction, when the scope of the AI management system is defined, and whenever that scope, risk treatment or controls change; it is reviewed in C5. Only if the company uses ISO/IEC 42001 as a reference or aims to be certified.
Who completes it The AI Office with the AI Risk Owner, who propose the applicability and the justification of each control.
Who verifies it The AI Auditor or the third line, who checks the evidence and the implementation status (38 §12.1). A certification audit, where applicable, is carried out by the accredited body.
Who decides or approves Senior management approves the statement, as part of the risk treatment in clause 6.1.3; the AI Committee and the board committee are informed.
Stage of the corporate cycle C2 (approval), C4 (monitoring of implementation status) and C5 (review).
Tool It has no application of its own in version 0.x. The status of the evidence comes from the use case register (T01), gate verification (T03) and the records cited in each row.
Reference document Document 34 §4 (ISO/IEC 42001: clauses 4 to 10 and Annex A by group) and §5.4 (AI RMF profile); document 38 §12 (relationship with ISO/IEC 42001 and with certification).
Lite versus Enterprise The statement is the same. In Lite scope, evidence may be grouped by process instead of by use case.

Completion rules:


02Identification

Field Content Guidance
Organisation and scope of the AI management system The approved scope (clause 4.3): units, systems, processes and role regarding AI (provider, deployer, user).
Edition of the standard checked ISO/IEC 42001:2023 or a later one; the company states that it has checked the statement against the purchased text.
Statement identifier and version Proposed format DA-YYYY-NN.
Date DD-MM-YYYY.
Owner of the statement AI Office.
Reference risk assessment and treatment plan Document 33; P12 and P13 of the use cases; P35 (risk appetite).
Reference AI RMF profile, if any P73, with its cut-off date.

03Statement by Annex A control

One row per control. The topic is our own summary of the control's objective; the binding text is that of the standard.

Control Topic (own summary) Applicable Justification Where SEVEN-G covers it Evidence Implementation status Related AI RMF subcategories (indicative)
A.2.2 Documented AI policy Document 31; 13 §15; P35 GOVERN 1.1, GOVERN 1.2
A.2.3 Consistency of the AI policy with other policies Documents 31 and 35; 01 §13 GOVERN 1.2, MEASURE 2.7, MEASURE 2.10
A.2.4 Periodic review of the AI policy C5; P37 GOVERN 1.5
A.3.2 Roles and responsibilities for AI 01 §8; document 30; P03, P38 GOVERN 2.1, GOVERN 3.2
A.3.3 Channel for reporting concerns Document 31; document 37 GOVERN 4.3, MEASURE 3.3
A.4.2 Documentation of the resources of each system P10, P15 GOVERN 1.6, MAP 2.1
A.4.3 Data resources P16, P64; document 51 GOVERN 1.6, MAP 2.3
A.4.4 Tooling resources P15, P54; document 53 GOVERN 1.6, MANAGE 3.2
A.4.5 System and computing resources P15, P63; document 42 GOVERN 1.6, MEASURE 2.12
A.4.6 People and competences P03, P20, P45; document 50 GOVERN 3.1, MAP 3.4
A.5.2 Impact assessment process P11; 32 §6 MAP 1.1, MAP 5.1
A.5.3 Documentation of impact assessments P11, P47, P48 MAP 5.1, MANAGE 1.4
A.5.4 Impact on individuals and groups P11, P48 MAP 5.1, MEASURE 2.11
A.5.5 Impact on society P11, P48 MAP 5.1, MEASURE 2.12
A.6.1.2 Objectives for responsible development Documents 20 and 53; 01 §3 GOVERN 1.2, GOVERN 4.1
A.6.1.3 Responsible design and development processes Documents 20, 21 and 53; P29 MAP 2.3, MANAGE 1.1
A.6.2.2 System requirements and specification P01, P15, P17 MAP 1.4, MAP 1.6
A.6.2.3 Documentation of design and development P15, P16; document 53 MAP 2.1
A.6.2.4 Verification and validation P22; G5 MEASURE 2.1, MEASURE 2.5
A.6.2.5 Deployment P21, P23; G5 MEASURE 2.5, MANAGE 1.1
A.6.2.6 Operation and monitoring P24, P25; document 52; R6 MEASURE 2.4, MANAGE 4.1
A.6.2.7 Technical documentation P15, P21; document 53 MAP 2.2, MEASURE 2.9
A.6.2.8 Recording of system events P25; AG-10; 34 §3.7 MEASURE 2.4
A.7.2 Data for developing and enhancing the system P16, P64; document 51 MAP 2.3
A.7.3 Acquisition of data P14, P64; document 51 MAP 2.3, MEASURE 2.10
A.7.4 Data quality P16; document 51 MAP 2.3, MEASURE 2.3
A.7.5 Data provenance P16; SEG-08 MAP 2.3, MEASURE 2.9
A.7.6 Data preparation P16; document 51 MAP 2.3
A.8.2 Documentation and information for users P17, P24, P49 MAP 2.2, MEASURE 2.9
A.8.3 External reporting P51; document 60 GOVERN 5.1, MEASURE 3.3
A.8.4 Communication of incidents P26, P51; document 37 GOVERN 4.3, MANAGE 4.3
A.8.5 Information for interested parties P46, P49; document 60 GOVERN 4.2, MANAGE 4.3
A.9.2 Responsible use processes Document 31; P43 GOVERN 4.1, MANAGE 1.1
A.9.3 Responsible use objectives Document 31; P17 GOVERN 1.2, MAP 2.2
A.9.4 Intended use of the system P01, P17, P49 MAP 1.4, MANAGE 2.4
A.10.2 Allocation of responsibilities with third parties Document 36; P56 GOVERN 6.1, MANAGE 3.1
A.10.3 Suppliers Document 36; P14, P55, P57 GOVERN 6.1, GOVERN 6.2
A.10.4 Customers P49, P56; 34 §3.8 GOVERN 5.1, MANAGE 4.1
(illustrative example) A.10.3 Suppliers Yes The company integrates two third-party models into customer service processes. Document 36; P14, P55, P57 P14 assessments of both suppliers (03-2026) and current P57 register. Partly implemented GOVERN 6.1, GOVERN 6.2

3.1 Additional controls

Clause 6.1.3 allows controls from other sources to be added. If the company applies SEVEN-G controls with no direct equivalent in Annex A (for example, the AG agent controls of document 35), it declares them here.

Additional control Source Why it is added Evidence Implementation status
(illustrative example) AG-09 · Kill switch Document 35 §7 The company operates agents with A2 autonomy. Kill switch tests in P19 and P24. Implemented

04Summary

Item Number Guidance
Annex A controls declared 38 If the edition checked has a different number of controls, the table is adjusted and this is stated here.
Applicable
Excluded, with justification Each exclusion has a specific justification.
Implemented · partly · planned · not started Only for applicable controls.
Additional controls Section 3.1.
Open actions to complete implementation With owner and deadline, in the treatment plan (P13) or in the improvement plan of the maturity report (P34 §6.6).

05Quality criteria

# Check Status
1 The company has checked the statement against the purchased text of ISO/IEC 42001 and states so in section 2. Met · Not met · Not applicable · Pending
2 All Annex A controls of the edition checked appear in the table, without reproducing the text of the standard.
3 Each exclusion has a specific justification, consistent with the scope of the management system and with the risk assessment.
4 Each control marked "Implemented" has evidence that exists, is approved and is applied at the date of the statement.
5 The statement is consistent with the risk treatment plan (P13) and with the AI RMF profile (P73), if any.
6 No text of the statement claims that the company is certified or that SEVEN-G certifies conformity.

06Approval and verification

Function SEVEN-G role Name and position Date Signature or reference
Prepares the statement AI Office with the AI Risk Owner
Verifies evidence and status AI Auditor or third line
Approves Senior management
Receives AI Committee and board committee

Segregation of duties: whoever prepares the statement does not verify it; the AI Auditor does not verify controls whose implementation they have led.


07Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 25-09-2026 First version. Statement of applicability of the 38 controls in Annex A of ISO/IEC 42001:2023, identified by their code and with the topic summarised in our own terms, with the proposed coverage in SEVEN-G and the related NIST AI RMF subcategories (indicative). Pending review by legal counsel or an ISO/IEC 42001 auditor.

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.