Legal notice and disclaimer. SEVEN-G is a reference methodological framework provided "as is" and for information purposes only. It does not constitute legal, regulatory, financial or professional advice, nor does it guarantee compliance with any law or standard. References to general regulation (such as the EU AI Act, the GDPR, DORA or NIS2), to technical standards and to regulation specific to each sector or jurisdiction may be incomplete, may not apply to a particular case or may become out of date as a result of regulatory changes, interpretations or supervisory positions after their consultation date. Each organisation that uses SEVEN-G is solely responsible for identifying the regulation that applies to it, verifying that it is current and certifying its own regulatory compliance, with the appropriate qualified advice. This methodology is a generic, free aid shared with the community so that nobody has to start from scratch; each person or organisation can and should adapt it to its own use. It must not be inferred that its legally sensitive parts have been reviewed by legal counsel: those reviews, for each company or sector, are the ultimate responsibility of the company, consultant or organisation that uses it. Although every effort is made to keep it up to date, some regulation may have changed without being reflected here. To the fullest extent permitted by law, the author accepts no responsibility whatsoever for the effects of its application in any organisation or for its full applicability. The methodology does not grant certification of any kind. The author accepts no liability for any use made of this content or for any decisions taken on the basis of it. The data, figures, companies and cases in the examples are fictitious or illustrative.
Why it matters. Without an evidence-based annual review, the thesis is renewed out of inertia, the initial thresholds are never tested against the company's own data and the same mistakes are repeated in new use cases. C5 is the moment when the board checks whether what was decided in C2 has been achieved and adjusts direction with what has been learned. It is the evidence for the level 5 questions of dimension D1 in document 11 (D1.11 and D1.12) and for the improvement cycle that a management system requires.
01Instructions for use
| Aspect |
Guidance |
| When it is used |
Once a year, when closing the corporate cycle; the first between months 13 and 18 of the implementation (90 §6.1). It precedes the C2 of the following cycle. |
| Who completes it |
The AI Office with internal audit (01 §5.1); management control provides value and cost; the AI Committee and the AI Office complete their self-assessment (section 11). |
| Who verifies it |
Internal audit or the AI Auditor, who also checks that the recalibration of thresholds is not proposed to improve the year's result (12 §8, step 4). |
| Who decides or approves |
The board (01 §5.1). Maturity, the index and the proposed adjustments are taken to the board's annual session (30 §3.1). |
| Corporate cycle stage |
C5 · Review. Inputs: current P35, P36, the quarterly C4 packs and the value reviews of the use cases. Output: proposal for the next C2 (new version of P35). |
| Tools |
T15 (maturity), T14 (index), T01 (funnel metrics and cohorts), T12 and T13 (value and cost), T17 (dashboard), T18 (recommendations and decisions), T22 (retirements and lessons). |
| Reference documents |
01 §5.1; 11 §7.1 and D1; 12 §7 and §8; 13 §13; 03 §3.5 and §3.6; 14 §10.8; 43 §8.3; 30 §12. |
| Lite versus Enterprise |
Both scopes use all sections. Blocks marked (Enterprise) may be omitted in a Lite scope. In Lite, the stages may be compressed (90 §6.1). |
Completion rules:
- Maturity is assessed with the same questionnaire version as in the previous assessment, or with a correspondence table (11 §6).
- The index is calculated with the thresholds in force; if new thresholds are approved, the previous period is recalculated and both results are published (12 §8).
- Amounts carry a status: validated, declared or estimated. "No data" is shown as such.
- Lessons are consolidated by coded reason, not by use case.
02Identification
| Field |
Content |
Guidance |
| Document code |
|
|
| Company or group |
|
In the examples, always fictitious. |
| Cycle reviewed |
|
Period and cut-off date. |
| C2 decision in force |
|
Version of P35 and DEC-AAAA-NNN. |
| Threshold version used |
|
Threshold version register in P35, section 14. |
| Implementation scope |
|
Lite · Enterprise, and whether it should be reviewed (90 §2.2). |
| Prepared by |
|
AI Office with internal audit. |
| Review version and date |
|
|
| Date of the board session |
|
Reference to the minutes or DEC-AAAA-NNN. |
03Summary for the board
One page maximum, using the response format in documents 60 and 61 ("Yes" · "Yes, with one condition" · "Not yet, because … is missing" · "No, because…").
| Question |
Answer |
Evidence |
| Has the AI thesis been fulfilled? |
|
Section 4. |
| Has the capacity to govern AI improved? |
|
Section 5. |
| Is the company transforming or only becoming more efficient? |
|
Section 6. |
| Does the portfolio work as a funnel? |
|
Section 7. |
| What is proposed to change for the next cycle? |
|
Section 12. |
04Fulfilment of the thesis
4.1 Monitoring targets
Those set in section 12 of P35 (the "How we will know it is working" item of the thesis).
| Indicator |
Value at the start of the cycle |
Target |
Current value |
Met (Yes · Partly · No) |
Main cause |
| Transformation index profile |
|
|
|
|
|
| Overall maturity level and priority dimensions |
|
|
|
|
|
| Proportion of validated value |
|
|
|
|
|
| Annual net value of the portfolio |
|
|
|
|
|
4.2 Ambition per sphere
| Sphere |
Target ambition (C2) |
Level achieved |
Level in the portfolio |
Main indicator (target → current) |
Heat map markers (Gap · Outside the thesis · No evidence) |
| 01 · Customer |
|
|
|
|
|
| 02 · Product and service |
|
|
|
|
|
| 03 · People |
|
|
|
|
|
| 04 · Operations |
|
|
|
|
|
| 05 · Data |
|
|
|
|
|
| 06 · Knowledge |
|
|
|
|
|
| 07 · Decision |
|
|
|
|
|
| 08 and 09 (grade by dimension) |
|
|
— |
|
|
4.3 Tolerance metrics
| Category |
Metric |
Quarters in amber |
Quarters in red |
Escalation carried out (13 §5.5) |
Was the limit set correctly? |
|
|
|
|
|
|
05Evolution of maturity
Verified assessment with the same questionnaire version (11 §7.1).
| Dimension |
Previous level |
Current level |
C2 target |
Achieved? |
Improvement plan actions closed ÷ planned |
| Strategy and governance (D1) |
|
|
|
|
|
| Value and portfolio (D2) |
|
|
|
|
|
| Data and knowledge (D3) |
|
|
|
|
|
| Technology and operations (D4) |
|
|
|
|
|
| People and adoption (D5) |
|
|
|
|
|
| Risk, security and compliance (D6) |
|
|
|
|
|
| Measurement and evidence (D7) |
|
|
|
|
|
| Overall level |
|
|
|
|
|
| Field |
Content |
Guidance |
| Assessment type |
|
Verified assessment; independent at least every two years in an Enterprise scope (11 §4.1). |
| (§14) questions answered "Yes" |
|
Out of 10. Status of the declaration of application (01 §14). |
| Cost of governance by intensity (IND-COS-12 to 14) |
|
Median hours and cost over investment by intensity against the C2 target (13 §6) and referenced evidence. If an intensity exceeds its target, the Express threshold, the reduced list (21 §2.5) or the evidence equivalences (21 §4.3) are reviewed; targets are recalibrated with the measured data. |
Formal C5 calculation (12 §7), presented with the elements in 12 §10.
| Signal or condition |
Previous calculation |
Current calculation |
Trend |
| B1 · B2 · B3 |
|
|
|
| Signals 1 to 8 (one row per signal) |
|
|
|
| Coverage |
|
|
|
| Evidenced profile |
|
|
|
| Assigned profile |
|
|
|
| Complementary alerts |
|
|
|
| Field |
Content |
Guidance |
| Signals with no data in two consecutive annual calculations |
|
This is a finding in itself (12 §6, rule 5). |
| What would change the profile |
|
Two or three conditions with owner and deadline. |
07Funnel metrics and cohorts
7.1 Cycle metrics
Definitions in 03 §3.5. Median and 80th percentile where appropriate.
| Metric |
Previous cycle |
Current cycle |
Reading |
| Time in phase (by phase) |
|
|
|
| Gate decision time against the reference time limit |
|
|
|
| Time to production (registration → G3 → G5) |
|
|
|
| Conversion per gate |
|
|
|
| Iterations per gate |
|
|
|
| Stalled use cases |
|
|
|
| Expired conditions |
|
|
|
| Stop and retirement reasons (distribution) |
|
|
|
| Ambition mix by phase |
|
|
|
| Weighted value (only with sufficient history) |
|
|
|
7.2 Cohorts by quarter of registration
| Cohort |
Registered |
Passed G2 |
Passed G3 |
Reached G5 |
Stopped or retired |
Median days to production |
On hold or stalled |
|
|
|
|
|
|
|
|
| (illustrative example) Q1 2027 |
9 |
6 |
4 |
3 |
3 |
210 |
1 |
08Portfolio value and cost
| Item |
Previous cycle |
Current cycle |
Status |
Source |
| Realised efficiencies |
|
|
Validated · Declared · Estimated |
T12 |
| Return |
|
|
|
T12 |
| Recurring cost |
|
|
|
T13 |
| Annual net value |
|
|
|
|
| Proportion of validated value |
|
|
|
|
| Released capacity materialised or reassigned |
|
|
|
T12, T20 |
09Consolidated lessons learned
Sources: lessons notes from each retirement and from each stop at G3 or later (14 §10.8) and reports from the 6- and 12-month reviews (43 §8.3). The AI Office consolidates them by coded reason.
| Coded reason (03 §3.3) |
No. of use cases |
Codes IA-AAAA-NNN |
Early signal that foreshadowed it and when it was noticed |
Total investment and cost against realised value |
Proposed change (entry criteria, templates or thresholds) |
Decision |
| Hypothesis refuted |
|
|
|
|
|
|
| Cost exceeds value |
|
|
|
|
|
|
| No adoption |
|
|
|
|
|
|
| Insufficient data |
|
|
|
|
|
|
| (illustrative example) No adoption |
2 |
IA-2027-011, IA-2027-015 |
Active users below 50 % at the 6-month review |
€0.62M against €0.05M declared |
Require an adoption plan approved before G4 also in Optimise use cases that change tasks |
Pending committee decision |
All reasons with at least one case are included.
10Recalibration of thresholds and time limits
Procedure in 12 §8 and 13 §13. Approved changes are entered in the threshold version register in P35 (section 14).
| Parameter |
Current value |
Evidence from own data |
Proposal |
Justification |
Internal audit review (not proposed to improve the year's result) |
Board decision |
| Reference time limits by phase (03 §3.6) |
|
|
|
|
|
|
| Transformation index thresholds (12 §4.5) |
|
|
|
|
|
|
| Heat map thresholds (10 §8.1) |
|
|
|
|
|
|
| Programme traffic light (14 §12.1) |
|
|
|
|
|
|
| Maturity weights (11 §2.3) |
|
|
|
|
|
|
| Economic thresholds, horizons and bands (13 §5.4, §6, §7 and §8) |
|
|
|
|
|
|
11Self-assessment of the governance bodies
The AI Committee and the AI Office assess their own effectiveness at least once a year and close the improvement actions (question D1.12 in document 11). The board and the board committee may do the same under their own rules.
11.1 Questionnaire
| Question |
AI Committee |
AI Office |
Board or board committee (optional) |
Evidence |
| Have the sessions in the calendar in 01 §5.2 been held? |
|
|
|
Minutes |
| Has there been a quorum including the second line for G3, G5, risk acceptances and exceptions (30 §3.3)? |
|
— |
— |
Minutes |
| Have gates been decided within the reference time limit? |
|
|
— |
T01 |
| Have abstentions and conflicts of interest been recorded, including the members' annual declaration (30 §12)? |
|
|
|
T01; declarations |
| Have matters exceeding the delegation been escalated in time? |
|
|
|
Minutes |
| Have the assigned board recommendations been closed on time (T18)? |
|
|
|
T18 |
| Are there expired exceptions that have not been closed (30 §7.4)? |
|
|
|
Exceptions register |
| Has the AI Office verified any gate in which it took part? |
— |
|
— |
T03 |
| Has any use case been stopped or retired with a coded reason during the year? |
|
|
|
T01; T22 |
| Overall assessment (Effective · Effective with improvements · Not effective) |
|
|
|
|
11.2 Improvement plan
| No. |
Body |
Action |
Owner |
Deadline |
Closure criterion |
Status (Open · Closed · Expired) |
| Finding your way around the site (M01) |
|
|
|
|
|
|
| What SEVEN-G is and what problem it solves (M02) |
|
|
|
|
|
|
| Closure of the previous cycle's plan |
Value |
| Planned actions |
|
| Actions closed with evidence |
|
| Expired actions and reason |
|
12Adjustments proposed for the next C2
One row per component in 13 §2. If no change is proposed, "Keep" is stated.
| Component |
Keep · Modify |
Proposal |
Reason and evidence (sections of this review) |
| AI thesis |
|
|
|
| Ambition per sphere |
|
|
|
| Risk appetite |
|
|
|
| Economic impact thresholds |
|
|
|
| Enterprise investment threshold and materiality |
|
|
|
| Return horizon |
|
|
|
| Target portfolio balance |
|
|
|
| Reference time limits |
|
|
|
| Nonconformity and incident time limits |
|
|
|
| Red lines |
|
|
|
| Framework budget |
|
|
|
| Review and triggers |
|
|
|
| Indicator selection (P35, section 13) |
|
|
Indicators with no data, unused or without a contrasting indicator. |
| Implementation scope (Enterprise) |
|
|
90 §2.2. |
13Quality criteria
| # |
Check |
Status |
| 1 |
The thesis has been reviewed with the evidence on maturity, the index and the portfolio, and the approved changes are applied in the next C2 (question D1.11 in document 11). |
Met · Not met · Not applicable · Pending |
| 2 |
The AI Committee and the AI Office have completed their self-assessment and the previous improvement plan has documented closure (question D1.12). |
|
| 3 |
Maturity has been assessed with the same questionnaire version or with a correspondence table. |
|
| 4 |
The recalibration uses the company's own data, is approved and is not proposed to improve the year's result (question D7.11; 12 §8). |
|
| 5 |
Lessons are consolidated by reason and propose changes to entry criteria, templates or thresholds (question D2.12). |
|
| 6 |
The funnel metrics include the cohort analysis (03 §3.5). |
|
| 7 |
Amounts carry a status and "no data" entries are recorded as such. |
|
| 8 |
Each C2 component has a keep or modify proposal with its reason. |
|
14Approval and verification
| Function |
Role in SEVEN-G |
Name and position |
Date |
Signature or reference |
| Prepares |
AI Office, with internal audit |
|
|
|
| Validates value and cost |
Management control |
|
|
|
| Self-assess |
AI Committee · AI Office |
|
|
|
| Verifies |
Internal audit or AI Auditor |
|
|
Result: Conformant · Conformant with observations · Nonconformant |
| Approves |
Board |
|
|
Reference to the minutes · DEC-AAAA-NNN |
Segregation of duties: no body assesses itself alone; its self-assessment is reviewed by internal audit. Whoever proposes the recalibration of thresholds does not verify it.
15Version control
Completed document
| Version |
Date |
Author |
Changes |
|
|
|
|
Template
| Version |
Date |
Changes |
| 0.1 |
19-09-2026 |
First version. Covers the C5 outputs (01 §5.1) and the annual review in 13 §13: fulfilment of the thesis, maturity, index, funnel and cohorts (03 §3.5), consolidated lessons (14 §10.8; 43 §8.3), recalibration (12 §8), self-assessment of the bodies with an improvement plan (11, D1.11 and D1.12) and adjustments for the next C2. |
| 0.2 |
01-10-2026 |
C5 review of the cost of governance by intensity against the proportionality targets (41 IND-COS-12 to 14). |