SEVEN-G
Template P34 · 19-09-2026

Template P34 · Maturity questionnaire and report

Maturity questionnaire and report

Records the evidence-based answers to the 84 questions of the maturity model, calculates the level by dimension and the overall level with the rule in document 11 and structures the report for the board.

Fernando García VarelaVersion 0.1 (working draft)19-09-2026Draft for review

Why it matters. The maturity assessment is a mandatory output of C1 and is repeated in C5 to check progress: with it, the board sets the thesis, the ambition and the risk appetite on a verified basis rather than on impressions. Without an answer sheet with evidence and verification, the level becomes a statement, the assessments of two years are not comparable and the company cannot substantiate the ten questions that support the SEVEN-G declaration of application (01 §14).

01Instructions for use

Aspect Guidance
When it is used In C1 · Diagnosis (baseline) and in C5 · Review (comparison), as a verified assessment. Between cycles, the AI Office may update it as a self-assessment, with no level value (11 §7.1). Also before an independent assessment or before publicly declaring that SEVEN-G is applied.
Who completes it The lead assessor (head of the AI Office or external assessor) with the assessment team of at least two people. Nobody assesses a dimension whose practices they lead; if the AI Office leads D1, D2 or D7 practices, those dimensions are assessed by another member of the team or by a third party (11 §4.2).
Who verifies it The independent verifier (internal audit, AI Auditor or third party), with the scope in 11 §4.6. The verifier may modify answers and records the change.
Who decides or approves The promoter (chair of the AI Committee) approves the scope, cut-off date and team. The AI Committee approves the report and presents it to the board or its board committee; it does not modify answers and may only request a new verification.
Stage of the corporate cycle C1 and C5. The result is published in the board dashboard (T17) and the actions that the board asks to be tracked are added to the register of recommendations (T18).
Tool T15 · Maturity assessment: questionnaire of 84 questions with evidence and verification, calculation in 11 §5 with the D1 and D6 cap, comparison between assessments, interview guide, printable report with the seven sections in 11 §6 and JSON and CSV export of the answers. This template is its paper or spreadsheet equivalent.
Reference document Document 11 (maturity model): dimensions and levels (§2), text of each question and required evidence (§3), method (§4), calculation (§5), report (§6), links (§7) and targets by ambition (§8).
Lite versus Enterprise The questionnaire and the calculation are the same. Indicative duration: three to four weeks for a Lite scope and six to eight for Enterprise (11 §4.3). With an Enterprise scope, an independent assessment should also be carried out at least every two years (11 §4.1).

Completion rules:


02Identification of the assessment

Field Content Guidance
Company and assessed scope Whole company or declared scope (units, countries, systems).
Assessment identifier Proposed format EM-YYYY-MM (month of the cut-off date).
Assessment type Self-assessment · Verified assessment · Independent assessment (11 §4.1).
Point in the cycle C5 · Update between cycles. (C1)
Cut-off date DD-MM-YYYY. It delimits the admissible evidence.
Questionnaire version 0.1 as long as document 11 does not change questions or levels.
Promoter Chair of the AI Committee.
Lead assessor and team Name, position and dimensions assessed by each person.
Independent verifier Internal audit, AI Auditor or third party.
Dimension weights Equal by default; if the company set others in C2, they are declared. None below 10 % or above 25 % (11 §2.3).
Previous assessment used for comparison Identifier, cut-off date and questionnaire version.
Limitations Access not granted, evidence not available, changes of scope.

03Answer sheet

One row per question. Answer: Yes · Partial · No, no evidence · No, contrary evidence · Not applicable · blank (no data). Evidence: traceable reference or link (document, record or system, with author, date and version); for "Not applicable", the justification. Verification: Not verified · Conformant · Modified (record the original answer in the verifier note).

3.1 Strategy and governance (D1)

Code Level Marker Answer Evidence Verification Verifier note
D1.01 1
D1.02 1
D1.03 2
D1.04 2
D1.05 3 §14
D1.06 3
D1.07 3 §14
D1.08 3 §14
D1.09 4
D1.10 4
D1.11 5
D1.12 5
(illustrative example) D1.09 4 Partial Minutes of the board committee for the second quarter with review of the dashboard (T17); there is no record for the first quarter. Conformant

3.2 Value and portfolio (D2)

Code Level Marker Answer Evidence Verification Verifier note
D2.01 1
D2.02 1
D2.03 2
D2.04 2
D2.05 3 §14
D2.06 3 §14
D2.07 3
D2.08 3
D2.09 4
D2.10 4
D2.11 5
D2.12 5

3.3 Data and knowledge (D3)

Code Level Marker Answer Evidence Verification Verifier note
D3.01 1
D3.02 1
D3.03 2
D3.04 2
D3.05 3
D3.06 3
D3.07 3
D3.08 3 if applicable
D3.09 4
D3.10 4
D3.11 5
D3.12 5

3.4 Technology and operations (D4)

Code Level Marker Answer Evidence Verification Verifier note
D4.01 1
D4.02 1
D4.03 2
D4.04 2
D4.05 3
D4.06 3
D4.07 3 §14
D4.08 3 if applicable
D4.09 4
D4.10 4
D4.11 5
D4.12 5

3.5 People and adoption (D5)

Code Level Marker Answer Evidence Verification Verifier note
D5.01 1
D5.02 1
D5.03 2
D5.04 2
D5.05 3
D5.06 3
D5.07 3
D5.08 3
D5.09 4
D5.10 4
D5.11 5
D5.12 5

3.6 Risk, security and compliance (D6)

Code Level Marker Answer Evidence Verification Verifier note
D6.01 1
D6.02 1
D6.03 2
D6.04 2
D6.05 3 §14
D6.06 3
D6.07 3 §14
D6.08 3 if applicable, for the agents part
D6.09 4
D6.10 4
D6.11 5
D6.12 5
(illustrative example) D6.03 2 Partial T02 inventory with the in-house systems and four third-party systems. Modified Original answer: Yes. The inventory does not include corporate use of general-purpose AI.

3.7 Measurement and evidence (D7)

Code Level Marker Answer Evidence Verification Verifier note
D7.01 1
D7.02 1
D7.03 2
D7.04 2
D7.05 3 §14
D7.06 3 §14
D7.07 3
D7.08 3
D7.09 4
D7.10 4
D7.11 5
D7.12 5

04Interviews and samples

4.1 Interviews by role

At least two interviews per dimension, with people from different functions; 45–60 minute script (11 §4.4). Answers are anonymised by role.

Role interviewed Dimensions Date Evidence located
(illustrative example) Data Protection Officer D3, D6 08-06-2026 Register of impact assessments; sample of P11.

4.2 Samples

Minimum size (11 §4.6): population of 1–5, all; 6–20, 5; 21–60, 8; more than 60, 12. The sample is stratified and is selected by the assessment team, not by the assessed area.

Questions Population Minimum size Size Selection and stratification
(illustrative example) D1.08, D2.05, D2.06, D2.08 22 active use cases 8 8 Two Enterprise, three in production, two Augment, one third-party and one generative AI.

4.3 Independent verification

Minimum scope (11 §4.6) Reviewed Result
All "Yes" answers in D1 and D6 Met · Not met
All §14 questions Met · Not met
At least 25 % of the other "Yes" answers % Met · Not met

05Calculation

5.1 Level by dimension

Level = N, the highest level for which all questions at levels 1 to N are "Yes" or "Not applicable" (11 §5.1). Progress to the next level = (Yes + 0.5 × Partial) ÷ applicable questions at level N + 1, as a percentage (11 §5.2). Blocking criteria: questions at levels 1 to N + 1 that are neither "Yes" nor "Not applicable". Criteria met in advance: questions at levels above N that are "Yes"; they do not raise the level.

Dimension Pending L1 L2 L3 L4 L5 No data Level Progress Blocking criteria Criteria met in advance
Strategy and governance (D1)
Value and portfolio (D2)
Data and knowledge (D3)
Technology and operations (D4)
People and adoption (D5)
Risk, security and compliance (D6)
Measurement and evidence (D7)

"Pending Ln" is the number of questions at level n that are neither "Yes" nor "Not applicable".

5.2 Spreadsheet formulas

With the answer sheet in columns (B = level, D = answer) and a named range per dimension (for example, lev_D1 and ans_D1):

5.3 Overall level

Dimension Weight Level
Strategy and governance (D1)
Value and portfolio (D2)
Data and knowledge (D3)
Technology and operations (D4)
People and adoption (D5)
Risk, security and compliance (D6)
Measurement and evidence (D7)
Step (11 §5.3) Result Guidance
1. Weighted average Σ (weight × level) ÷ Σ weights, to two decimal places.
2. Rounding down To the lower whole number.
3. Cap min (D1 level, D6 level) + 1.
4. Overall level min (step 2, step 3).
Has the cap been applied? Yes, because of D1 · Yes, because of D6 · No.
(illustrative example, 11 §9) 3.00 → 3; cap min (3, 1) + 1 = 2 Overall level 2, with the cap applied because of D6.

06Maturity report

Structure in 11 §6. T15 generates it from the answer sheet; on paper it is completed with these blocks.

6.1 Summary for the board (one page maximum)

Field Content Guidance
Overall level and level by dimension Table in section 5.3 with the progress of each dimension.
D1 or D6 cap Whether it has been applied and because of which dimension.
Three key messages 1. 2. 3. Overall result; strengths; main gap with its blocking criteria.
Status of the declaration of application Possible only if the ten §14 questions are "Yes" in a verified assessment (11 §7.3).

6.2 Scope and method

Field Content Guidance
Scope, assessment type and cut-off date From section 2.
Questionnaire version and weights
Team and verifier With the dimensions assessed by each person.
Interviews by role and sample sizes Summary of section 4.
Limitations

6.3 Results by dimension

Dimension Level Progress Blocking criteria Criteria met in advance Strengths and gaps, with reference to the evidence
Strategy and governance (D1)
Value and portfolio (D2)
Data and knowledge (D3)
Technology and operations (D4)
People and adoption (D5)
Risk, security and compliance (D6)
Measurement and evidence (D7)

6.4 Cross-reading

Field Content Guidance
Transformation index profile Result of document 12 (T14) at the same cut-off date, if available.
Applicable reading Situations in 11 §7.2: maturity 3 or higher with efficiency at scale; transformation under way with D7 below 2; Transform bets with D1 or D6 below 2 (escalated to the board); high maturity with scattered exploration.
§14 questions D1.05, D1.07, D1.08, D2.05, D2.06, D4.07, D6.05, D6.07, D7.05 and D7.06, with their answer.

6.5 Comparison

Dimension Previous assessment This assessment Change Questions whose answer changes

Only if the previous assessment is verified and has the same questionnaire version or a correspondence table. If the weights do not match, the comparison of the overall level is not like-for-like.

6.6 Targets and improvement plan

Dimension Current level Target set in C2 Horizon
12 · 24 months

The reference targets by ambition are in 11 §8; level 5 is not a default target.

Code Dimension Action Owner Deadline Closure criterion Tracked in T18
AM-YYYY-NN Yes · No
(illustrative example) AM-2026-01 D6 Complete the inventory with third-party systems and corporate use of general-purpose AI, with a completeness statement by area. AI Risk Owner 31-10-2026 D6.03 and D6.05 verified as "Yes". Yes

6.7 Annexes


07Quality criteria

# Check Status
1 Each "Yes" has valid evidence: it exists, is traceable, approved and current, shows application and predates the cut-off date (11 §4.5). Met · Not met · Not applicable · Pending
2 No blank question has been counted as met or estimated: it is shown as no data.
3 "Not applicable" only for questions marked if applicable and with verified justification.
4 Each dimension has at least two interviews from different functions and nobody has assessed a dimension whose practices they lead.
5 The samples have the minimum size, are stratified and were selected by the assessment team.
6 The verifier reviewed all "Yes" answers in D1 and D6, all §14 questions and at least 25 % of the other "Yes" answers.
7 Level by dimension and overall level calculated with the rule in 11 §5; the report states whether the D1 or D6 cap was applied.
8 The weights are declared, between 10 % and 25 %, and match those of the assessment used for comparison.
9 The comparison only uses verified assessments with the same questionnaire version.
Sphere map and ambition levels (10) Each improvement action has an owner, a deadline and a closure criterion; those requested by the board are in T18.

08Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Approves scope, cut-off date and team Promoter (chair of the AI Committee)
Leads the assessment and drafts the report Lead assessor (AI Office or external assessor)
Verifies Independent verifier (internal audit, AI Auditor or third party)
Approves the report AI Committee
Receives the report Board or its board committee

Segregation of duties: whoever is accountable for a dimension does not assess it; the verifier has not taken part in the assessment being verified; the AI Committee approves the report but does not modify answers.


09Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 19-09-2026 First version. Answer sheet for the 84 questions of document 11 (questionnaire version 0.1), interviews, samples, verification, calculation with spreadsheet formulas and report with the seven sections in 11 §6. Paper equivalent of T15.