Template P65 · R6 continuity review package

R6 continuity review package

Brings together in a single document the period data that the continuity review needs —value, cost, stability, incidents, risks and compliance— and the team's proposal, so that the verifier can check and the body can decide.

Fernando García VarelaVersion 0.1 (working draft)19-09-2026Draft for review

Why it matters. A system in production can remain available while it loses value, accumulates cost, drifts or stops complying. R6 is the periodic control that detects this in time, but its evidence is spread across ten templates and tools. If nobody brings it together with the same data for the same period, the review becomes a conversation and the body decides without seeing the whole picture. The package orders the ten blocks of 52 §8.2, shows which R6 criterion each one covers and requires a conclusion on whether G7 must be brought forward. Skipping an R6 is a major nonconformity.

01Instructions for use

Aspect Guidance
When it is used At each R6: at least quarterly in Enterprise and half-yearly in Lite. It is brought forward after an S1 or S2 incident, a substantial change or a relevant change by the provider (52 §8.1). It may coincide with the 6- or 12-month review (43 §8.1); in that case the P62 report is attached.
Who completes it The AI Product Owner and the AI Operations Owner, with the data for the period (52 §8.2).
Who verifies it AI Office in Lite; AI Auditor in Enterprise, with checklist LV-R6 in document 22.
Who decides AI Sponsor in Lite; AI Committee in Enterprise (21 §6.7).
Stage, gate or moment R6 · Continuity review (phase 6). The outcome is recorded in P29.
Tool T01 (R6 events and dates), T03 (verification), T08, T10, T12 and T13 as sources.
Reference document Document 52 §8; criteria R6.01–R6.16 in document 21 §6.7; LV-R6 in document 22 §9.
Lite versus Enterprise Lite may omit the fields marked (Enterprise) and present the value, cost and risk blocks in simplified form. R6.13 does not apply in Lite.

Completion rules:


02Identification

Field Content Guidance
Use case code IA-AAAA-NNN (T01).
AI systems SIA-AAAA-NNN (P05).
Type of system and autonomy level Predictive ML · Generative AI · Agent; A0–A3.
Intensity, ambition level and regulatory classification P04, P07, P11.
R6 number and period reviewed For example, 3rd R6 · 01-01-2027 to 31-03-2027.
Type of R6 Ordinary · Brought forward (reason) · Coincides with the 6- or 12-month review.
Date of the previous R6 and its outcome P29.
Deadline according to the frequency (R6.01)
Date the package was submitted Before the review is requested.

03Summary for the decision

One line per block. Situation: Within what was approved · Variance with action · Significant variance · No data.

Block Situation Key data for the period R6 criteria
1 · Value R6.02
2 · Released capacity R6.02, R6.14
3 · Cost R6.03
4 · Stability, performance and quality R6.04, R6.05
5 · Incidents and changes R6.06, R6.07, R6.15
6 · Agents R6.11
7 · Human oversight and adoption R6.10, R6.14
8 · Risk and compliance R6.08, R6.09, R6.13
9 · Continuity R6.12
10 · Proposal R6.16

04Block 1 · Value (P28, T12)

Field Content Guidance
Realised value for the period by type (efficiencies, return) and status Validated · Declared · Estimated.
Realisation for the period and cumulative (F10) Against the P62 curve.
Validated proportion (F6)
Annualised net value (F2) and validated net value (F2v)
Stop criteria Has any been reached?
Reading by ambition Optimise: materialised savings or reassigned capacity. Augment: sustained performance and adoption. Transform: progress against the stage milestones.
Evidence P28 version and date.

05Block 2 · Released capacity (T20)

Net hours released Materialised Reassigned Undecided Materialisation rate (F5) Reassignment rate (F5) Evidence

06Block 3 · Cost (T13)

Field Content Guidance
Actual recurring cost against the budget and against the G3 estimate Variance and explanation (R6.03).
Cost per transaction or per unit of output IND-COS-05.
Activations and days in cost-driven degraded mode, by level N1–N4 (P63 §8).
Quality measured during the mode against the P25 minimum OPE-18.
More than one month at N2 or above Yes · No. If Yes, proposal: supplement, optimisation or change of the primary model.

07Block 4 · Stability, performance and quality (P25)

Metric Warning threshold Critical threshold Value for the period Critical alerts Action
Availability
Main model metric or response quality
Data or usage drift (OPE-19)
Bias, including in responses (OPE-20)
Alert noise (OPE-16) (Enterprise)

08Block 5 · Incidents and changes (P27, T08)

Field Content Guidance
Incidents by severity S1 · S2 · S3 · S4, with containment and closure.
Regulatory notifications and deadline met As per P26.
Open nonconformities and deadline NC-AAAA-NNN.
Changes by class Minor · Significant · Substantial; changes by the provider.
Substantial changes and the gate they returned to Without a gate: major nonconformity (52 §6.4).
Conditions from previous gates Open, met or expired (P29).

09Block 6 · Agents (P25, T10)

Only if there are agents (A1–A3).

Actions blocked by limits Intent anomalies detected and reviewed Kill switch test (date and result) Permission and credential review (date)

10Block 7 · Human oversight and adoption (document 50)

Field Content Guidance
Human modification rate Close to 0% for 30 days is reviewed (52 §5.2).
Adoption against the target P20.
Supervisors designated and trained
Records retained and stop mechanism available R6.10.

11Block 8 · Risk and compliance (P11, P12, T04, T07)

Field Content Guidance
New risks or risks rising in level and their acceptance Body according to the residual level (P12 §6).
Validity of the regulatory classification and of the intensity T07, T04.
Validity of the impact assessments P11.
Information to workers' representatives Updated after changes affecting working conditions (52 §6.4).
Post-market monitoring (Enterprise) Where regulation requires it (52 §9).

12Block 9 · Continuity (P19, P14)

Field Content Guidance
Last rollback test and result Annual in Lite, half-yearly in Enterprise (OPE-15).
Provider situation Changes to model, terms or sub-processors; incidents; announced obsolescence (OPE-17).

13Check of the R6 criteria

Team self-assessment; it does not replace verification with LV-R6.

Code Criterion (summary) Block Status
R6.01 Review within its frequency Identification Met · Not met · Not applicable · Pending
R6.02 Value against the hypothesis with status and validated proportion 1
R6.03 Actual against estimated costs, with variances explained 3
R6.04 Performance within thresholds and model changes recorded 4, 5
R6.05 Bias within thresholds if it affects people 4
R6.06 Incidents recorded and notified on time 5
R6.07 Significant changes assessed and, where required, through G4 and G5 5
R6.08 Classification, impact assessments and intensity in force 8
R6.09 Risk register up to date and acceptances at the correct level 8
R6.10 Critical controls working 7
R6.11 [AG] Permissions, intent, anomalous actions and kill switch 6
R6.12 [TER] Provider changes, incidents and contract 9
R6.13 Post-market monitoring where required 8
R6.14 Adoption against the target 2, 7
R6.15 Conditions and nonconformities within deadline 5
R6.16 Assessment of variances that require G7 to be brought forward 10

14Block 10 · Variances and proposal

Variances that require G7 to be brought forward (21 §6.7):

Variance Does it apply? (Yes · No) Evidence
A stop criterion has been reached.
Realised value falls below the success threshold in two consecutive reviews.
A residual risk rises to High or Critical without acceptance at the corresponding level.
An S1 incident, or recurring S2 incidents with the same cause.
The regulatory classification or the intensity changes.
The provider stops meeting non-conditionable terms or announces withdrawal of the service.
Field Content Guidance
Team proposal Proceed with operation · Proceed with conditions · Bring G7 forward (01 §7.3).
Reasons Based on blocks 1 to 9.
Proposed conditions Only non-critical variances, with action, deadline and owner. Not allowed for critical controls, legal compliance or human oversight.
Unacceptable risk detected If there is one, G7 is not awaited: incident procedure and, where appropriate, stop (52 §8.3).

(Illustrative example) Cumulative realisation of 73.6% with two quarters below 90%; cost within budget; no S1 or S2 incidents; proposal: Proceed with conditions (validate the pending quarters and analyse the fall in realisation before the next R6).


15Quality criteria

# Check Status
1 The ten blocks are complete or marked No data with a reason. Met · Not met · Not applicable · Pending
2 All data relate to the period reviewed and link their evidence in force.
3 Each criterion R6.01–R6.16 has a status and a supporting block.
4 The assessment of the six variances that require G7 to be brought forward is recorded.
5 The proposal is a permitted R6 outcome and is consistent with the blocks.
6 The package was submitted before the review was requested.

16Approval and verification

Function SEVEN-G role Name and position Date Signature or reference
Prepares the package AI Product Owner and AI Operations Owner
Verifies (LV-R6) AI Office (Lite) · AI Auditor (Enterprise)
Decides and records in P29 AI Sponsor (Lite) · AI Committee (Enterprise)

Segregation of duties: whoever prepares the package neither verifies it nor decides; the verifier is not part of the team that builds or operates the system.