SEVEN-G
Template P67 · 19-09-2026

Template P67 · Quarterly board pack

Quarterly board pack

Prepares the C4 oversight pack received by the board or its board committee: one-page summary, decisions requested, programme traffic light, value, risks, recommendations and use cases in detail, with its preparation calendar and pre-submission checklist.

Fernando García VarelaVersion 0.1 (working draft)19-09-2026Draft for review

Why it matters. The board can only oversee AI if every quarter it receives the same information, under the same rules and in time to read it. This template turns document 60 into a working form: it forces the pack to start with what has to be decided, to show the validated proportion and the no data items, and to check before submission that no decision is requested without verified evidence. Without it, each pack is built by hand, changes perimeter and criteria, and the board approves figures that nobody has validated.

01Instructions for use

Aspect Guidance
When it is used At every quarterly oversight session (C4). The variants in section 13 cover the annual direction pack (C2), the annual review pack (C5) and extraordinary packs.
Who completes it The AI Office prepares the pack; management control validates the figures (sections 4, 7 and 9); the AI Auditor verifies the evidence for the decisions (section 5).
Who verifies it The AI Committee reviews the complete pack and selects the use cases in detail at D−10.
Who decides or approves Submission is authorised by the chair of the AI Committee; decisions are taken by the full board or the board committee in accordance with 60 §6.
Stage, gate or point Oversight, with the data cut-off date at D−20 (section 11). It includes the Transform decisions at G2 and G7 and the Critical risk acceptances that are escalated. (C4)
Tool T17 · Board AI dashboard (views and data fingerprint) and T18 · Board recommendations register (extract). Figures from T01 and T12; risks from T06; incidents and nonconformities from T08; evidence from T03.
Reference document Document 60 (content, structure, decision sheet, rules for figures, traffic light, calendar and checklist); 40 §11 (value summary); 14 §12 (traffic light); 61 §8.5 (session script).
Lite versus Enterprise Where the company-level implementation scope is Lite, the pack may be reduced to the one-page summary, the decisions, the traffic light and the recommendations extract; the blocks marked (Enterprise) are optional. The checklist in section 12 always applies.

Completion rules:


02Identification

Field Content Guidance
Type of pack C4 quarterly · C2 annual direction · C5 annual review · Extraordinary.
Recipient body Full board · Board committee (which one). Allocation in accordance with 60 §6.
Session date DD-MM-AAAA.
Quarter overseen For example, second quarter of 2027.
Data cut-off date D−20. Every figure carries it.
T17 dashboard data fingerprint That of the data file used. If the dashboard is regenerated after submission, this is reported.
Comparison snapshot Saved snapshot from the previous session.
Perimeter Companies, units and use cases included; changes of perimeter since the previous session.
Pack version
Prepared by AI Office.

03Contents of the pack

Order Section Indicative length Source Included (Yes · No · No content) Page
1 One-page summary (section 4) 1 page T01, T12, T17
2 Decisions requested (section 5) 1 sheet per decision T03
3 Programme traffic light (section 6) 1 page T01
4 Dashboard: indicated view and commentary per block (section 8) 1–2 pages T17
5 Risks (section 9.1) 1 page T06
6 Incidents and nonconformities (section 9.2) 1 page T08
7 Recommendations and commitments (section 9.3) 1 page and extract T18
8 Use cases in detail, maximum 3 (section 10) 1 page per use case T01
— Annexes: inventory, value per use case, funnel metrics, full recommendations register, glossary No limit; not presented in session T01, T02, T18

04One-page summary

Field Content Guidance
Main message Three lines at most. It starts with "Yes", "Yes, with one condition: …", "Not yet, because … is missing" or "No, because …" and answers "is what was decided being delivered?".
Key figures Efficiencies, return, recurring cost and annual net value; validated proportion; released capacity not realised, shown separately; investment executed against budget. Value summary in section 7.
Portfolio Use cases by phase and status; in production; stopped and retired in the quarter; stalled.
Risk Number of Critical and High residual risks; S1 and S2 incidents; open major and critical nonconformities. Number only; detail in section 9.
Decisions requested DEC code and one line per decision. If there are none, this is stated explicitly.
Recommendations Open, overdue, closed in the quarter and discrepancies between declared and assessed.
Changes since the previous session What has changed and why, including traffic light colour changes.

(illustrative example) Main message: "Yes, with one condition: that the customer service agent is not extended until it passes the prompt injection test. The portfolio is within budget and the validated proportion rises from 41% to 58%."


05Decisions requested

5.1 List of decisions

Order: 1) those that block investment or production; 2) risk acceptances; 3) items to take note of (60 §4.3).

Order Code What is requested (one line) Type Body Evidence verified at D−12 (Yes · No) Requested at this session?
1 (illustrative example) DEC-2026-014 Authorise stage 1 of IA-2026-018 with a limit of €400,000 Authorise with limits Full board Yes Yes

Types: Approve · Authorise with limits · Accept a risk · Take note · Assign (an assignment is recorded as a REC in P69).

5.2 Decision sheet

One sheet per decision. Copy the block as many times as there are decisions.

Field Content Guidance
Code DEC-AAAA-NNN (document 62). It is retained even if the decision is deferred.
What is requested Exact wording that can be approved or rejected exactly as written.
Type Approve · Authorise with limits · Accept a risk · Take note · Assign.
Body Full board or board committee (60 §6).
Management's response One of the four formats, with what it recommends and why.
Context Three to five lines: what it is, sphere, ambition level, phase. No technical jargon.
Options At least two, including not doing it or stopping, with their consequences.
Value Efficiencies, return and recurring cost with formula and status; additional net value per additional euro invested.
Investment Amount, stage, limit and deadline. For Transform, limit per stage.
Risk Main residual level, regulatory classification and intensity. If it is Critical, this is stated explicitly.
Stop criteria What result would lead to stopping and when it will be checked. Set before deciding.
Proposed conditions Each with an owner and a deadline. None on critical controls for security, legal compliance or human oversight (01 §7.3).
Verified evidence Gate evidence (P29) and who verified it.
What happens if no decision is taken Cost or risk of deferral, in one line.
Links IA-AAAA-NNN, REC-AAAA-NNN, INC-AAAA-NNN, NC-AAAA-NNN; P29 and P30 where applicable.

06Programme traffic light

Six axes with four statuses: Green, Amber, Red or No data. Thresholds from document 14 (§12.1), set in C2 and calibrated in C5; threshold version applied: ______.

Programme Sponsor Schedule Cost Value Risk Governance Adoption Overall Overall in the previous quarter Explanation (one line from the owner)
Customer service (illustrative example) Sales management Green Green Amber Red Green Amber Red Amber Agent in pilot without a prompt injection test; it will not be extended until it has one.

Calculation rules (60 §9.3 and 14 §12.2), which the AI Office checks before closing the table:

# Rule Applied (Yes · No)
1 The overall status is the worst of the axes.
2 An axis with no data prevents an overall green: the programme is at least amber.
3 No data on Risk, or on two or more axes, is equivalent to an overall red.
4 The colour is calculated by the AI Office using the approved criteria, not by the programme owner.
5 Every change of colour between sessions is explained in the one-page summary.
6 A programme that is red for two consecutive quarters is presented as a use case in detail with a proposed decision.

07Value summary

Model in 40 §11.2. Cut-off date and source for every figure; totals calculated before rounding.

Item Annual amount Validated Validated proportion Note
Realised efficiencies
Return
Gross realised value
Recurring cost — Deducted in full
Annual net value (F2)
Validated net value (F2v)
Released capacity not realised (not added)
Reassigned capacity (not added)
Use cases with negative annual net value … of … Listed individually.
Use cases with no return data … of …
Annual net value excluding cross-unit use cases and enabling platforms 40 §7.2 and §11.1, rule 10.
Field Content Guidance
Commentary for the board Two or three lines: what validated value says compared with declared value, and what is recommended.
Change since the previous session On the same perimeter; new use cases shown separately.
Composition by ambition level (Enterprise) Efficiencies against return in Optimise, Augment and Transform (signals 1 and 2 of document 12).

08Dashboard: view and commentary per block

The pack does not reproduce the dashboard; it indicates the view (60 §10.1) and adds a commentary per block prepared by the AI Office and reviewed by management control.

T17 dashboard block Indicated view Commentary (what has changed and why) Requires the board's attention? (Yes · No)
Portfolio and value
Where the company invests and agility
History and trend
Adoption
Risk and compliance
Exposure to AI-enabled attacks (Enterprise)
Movements and incidents

09Risks, incidents and recommendations

9.1 Risks

Use case or system Typical risk (RT-XXX-NN) Inherent level Residual level Owner Controls Accepted by and until Next review
Field Content Guidance
Concentration Risks affecting several use cases: same supplier, same data, same type of agent.
Regulatory changes New or amended obligations with an effect on the portfolio, with the date consulted (document 34).

9.2 Incidents and nonconformities

Code Type Severity or grade System and use case Date Containment and status Notifications and time limit Lessons and actions
INC · NC S1–S4 · minor, major or critical

S1 and S2 individually; S3 and S4 aggregated. Critical nonconformities individually; major ones individually if they are beyond their time limit; minor ones, number only (60 §4.6).

9.3 Recommendations and commitments

Extract from P69 and T18: overdue items, items closed in the quarter with their assessment, discrepancies and DEC decisions with pending conditions.

Code Abbreviated text Recipient Current committed date Declared status Independent assessment Alert
Overdue · Discrepancy · Awaiting assessment · Repeated rescheduling

10Use cases in detail

At most three, chosen in this order: 1) they require a decision at the session; 2) S1 or S2 incident, Critical residual risk or critical nonconformity; 3) relevant change in value, stop or retirement with lessons; 4) Transform under way. One page per use case (P31 as the basis).

Field Use case 1 Use case 2 Use case 3
Code and name
Selection criterion
What it is and what it is used for
Sphere and ambition level
Phase and status
Value with formula and status
Recurring cost
Main residual risk
Next decision and date

11Preparation calendar

Working days before the session (60 §7.2). The submission deadline complies with the board regulations.

Point Planned date Activity Owner Actual date Done (Yes · No)
D−20 Data cut-off date; snapshot of the dashboard and the register. AI Office
D−15 Validation of figures: validated, declared and estimated statuses; validated proportion. Management control
D−12 Verification of evidence for the decisions requested. AI Auditor
D−10 Review of the pack; selection of the use cases in detail. AI Committee
D−7 Submission to the board committee and the full board. Board secretariat
Session Presentation using the script in 61 §8.5 (P68). Chair of the AI Committee
D+5 Recording of decisions (DEC) and recommendations (REC) with owner and date (P69). Board secretariat and AI Office

12Checklist before submission

# Check (60 §11) Owner Status
1 The summary fits on one page and starts with a response format. AI Office Met · Not met · Not applicable · Pending
2 All figures have a formula, status and cut-off date; the validated proportion is visible. Management control
3 No data items are shown as such and totals state how many use cases they include. Management control
4 Released capacity not realised is not added to the net value. Management control
5 Each decision requested has a complete sheet and verified evidence. AI Auditor
6 No proposed condition affects critical controls for security, legal compliance or human oversight. AI Risk Owner
7 There are at most three use cases in detail and they meet the selection criteria. AI Committee
8 S1 and S2 incidents and critical nonconformities are reported individually. AI Office
9 The register extract includes overdue items and discrepancies. AI Office
Sphere map and ambition levels (10) The dashboard referred to is the snapshot at the cut-off date and its data fingerprint matches. AI Office
Maturity model (11) The allocation between the full board and the committee complies with 60 §6 and the board regulations. Board secretariat
Transformation index (12) There is no untranslated technical jargon and no comparison with the market without a source. Chair of the AI Committee

13Variants: C2, C5 and extraordinary packs

Sections 2, 5, 11 and 12 of this template are used and blocks 4 to 10 are replaced by the following. The underlying content is prepared with P35 (AI thesis and risk appetite, C2) and P37 (annual review, C5); here only what is escalated to the board is organised.

13.1 Annual direction pack (C2)

Block (60 §3.2) Content Source Included
Starting point Maturity D1–D7 with evidence, transformation index profile, validated value and cost of the portfolio. T15, T14, T12
Proposed AI thesis Role of AI in the strategy; what will not be done and why. T19
Ambition per sphere Target level in spheres 01 to 07; expected level on the axes of spheres 08 and 09. T16, T19
Risk appetite and thresholds Economic impact thresholds, Enterprise investment threshold, return horizon, reference time limits, risks that are not accepted. T19
Corporate AI policy Principles, acceptable use and responsibilities (document 31). Document 31
Framework budget Planned investment and recurring cost, with a split by ambition level. Management control
Decisions requested One DEC sheet per element, with alternatives. Section 5

13.2 Annual review pack (C5)

Block (60 §3.3) Content Source Included
Maturity Level by dimension and overall level using the rule in document 11, against the previous year and with evidence for each change. T15
Transformation index Eight signals and profile; signals with no data identified. T14
Delivery of the thesis Target against actual ambition per sphere; Transform use cases approved, in production, stopped and retired. T01, T16
Value for the year Annual net value by ambition level, validated proportion, released capacity realised and not realised. T12
Governance agility Idea–approval–production times by risk and ambition; stalled use cases; conversion per gate. T01
Lessons learned Stop and retirement reasons; closed recommendations and their effect. T01, T18
Proposed adjustments Changes to the thesis, ambition, appetite, thresholds and time limits for the new cycle. AI Committee with internal audit

13.3 Extraordinary packs

Case (60 §3.4) Recipient Reference time limit Minimum content Submission date
S1 incident Chair of the board committee; information to the full board As soon as the severity is confirmed Facts, affected parties, containment, notifications made or pending, decisions required.
Critical nonconformity Board committee Within the containment time limit (01 §12) Description, containment, action plan, owner.
Unscheduled Transform at G2 or scaling at G7 Full board Before committing investment Decision sheet (section 5.2).
Acceptance of a Critical residual risk Full board or board committee Before G3 or G5 Decision sheet with alternatives and a time limit on the acceptance.

14Quality criteria

# Check Status (Met · Not met · Not applicable · Pending)
1 Figures, dashboard and register extract share the cut-off date and the data fingerprint.
2 The pack complies with the twelve rules for presenting figures (60 §8).
3 Transform decisions at G2 and G7 link to their gate record (criteria G2.12 and G7.09 of document 21).
4 No Critical residual risk is presented without an acceptance sheet from the body (criterion G3.12).
5 The checklist in section 12 is complete before submission.
6 The pack serves as evidence for questions D1.09 and D7.06 of document 11 (quarterly review recorded in the minutes; validated proportion and no data visible).

15Approval and verification

Function SEVEN-G role Name and position Date Signature or reference
Prepares AI Office
Validates the figures Management control
Verifies the evidence for the decisions AI Auditor
Reviews and authorises submission AI Committee · chair of the AI Committee
Submits Board secretariat

Segregation of duties: whoever prepares the pack does not validate its figures or verify the evidence for the decisions it requests; the board decides and nobody validates their own work (60 §2, principle 8).


16Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 19-09-2026 First version. Extracts from document 60 the contents, the one-page summary, the decision sheet, the programme traffic light, the preparation calendar and the checklist, with the value summary in 40 §11.2 and variants for C2, C5 and extraordinary packs.