SEVEN-G
Template P61 · 01-10-2026

Template P61 · SEVEN-G declaration of application

SEVEN-G declaration of application

Model text with which a company declares, under its own responsibility and with audited evidence, that it applies SEVEN-G or some of its components, with its scope, version, exclusions and validity.

Fernando García VarelaVersion 0.2 (working draft)01-10-2026Draft for review

Why it matters. Saying "we apply SEVEN-G" to customers, supervisors or investors is a statement about how AI is governed in the company. If it does not state which perimeter it covers, what has been excluded, which version is applied and which audit supports it, it is misleading and exposes the company. This template turns the declaration into a verifiable self-declaration: each of the fourteen core rules (01 §14.1) is linked to its evidence and to the result of an audit, and the text makes clear that it is not a certification.

It is not a certification. There is no official SEVEN-G certification in version 0.x. The declaration is the sole responsibility of the company that issues it; a third party's review report is a professional opinion with its own scope and date, and does not grant any seal. Use of the SEVEN-G name does not imply endorsement by the author (documents 91 §6 and 93).

01Instructions for use

Aspect Guidance
When it is used Before the first declaration, following a framework audit that includes the declaration (38 §11) with a Conformant or Conformant with observations outcome; thereafter, it is renewed each year in C5.
Who completes it The AI Office prepares the text and the evidence table; the AI Committee submits it.
Who verifies it Internal audit or an independent external auditor who has not taken part in implementing the framework in the company in the previous twelve months (38 §11.1). If the declaration is communicated to third parties, SEVEN-G recommends an external audit or an external quality review of internal audit.
Who decides or approves The board or its board committee (91 §6.3).
Corporate cycle stage Review, with the results of the annual framework audit. (C5)
Tool It has no dedicated tool. The evidence comes from T01, T02, T03, T08, T12 and T17.
Reference document 01 §1.2 and §14; 38 §11; 91 §6; 11 §7.3 (questions marked (§14)); document 93 (licence and attribution).
Lite versus Enterprise Not applicable to the declaration: it is made for the company or its perimeter, with the distribution of intensities in section 5.

Completion rules:


02Identification

Field Content Guidance
Company name Registered name.
SEVEN-G version applied Number and date (for example, 0.1 · 16-09-2026).
Core version applied Version of the core in 01 §14.1 (for example, 1 · 01-10-2026).
Date from which it is applied DD-MM-AAAA.
Date of the declaration DD-MM-AAAA.
Version of the declaration 1.0, 2.0… at each annual renewal.
Type of declaration Full · Modular.

03Scope

Field Content Guidance
Companies included
Areas or units included
Types of AI use covered (01 §1.3) AI use cases · Third-party AI integrated into processes · Corporate use of general-purpose AI · Unauthorised use.
Companies, areas or types of use excluded With justification.
Number of systems in the inventory within the perimeter T02, as at the cut-off date.
Number of use cases in the register within the perimeter T01, as at the cut-off date.
Cut-off date

04Components applied and excluded

Element (01 §2) Applied (Yes · Partly · No) Scope or parts used Justification for the exclusion or partial application
Corporate cycle C1–C5
Use case lifecycle (phases 0–7 and gates)
A · Impact map (spheres and ambition levels)
B · Governance system (roles, bodies, risks, regulation, third parties, nonconformities)
C · Measurement system (value rules, indicators, maturity, transformation index)
D · Tools (templates, checklists, board dashboard, register of recommendations) The reference tools are not mandatory; state what is used instead.
(illustrative example) A · Impact map Partly Spheres and ambition levels to classify the portfolio The grades of the enabling spheres will be incorporated in the following year.

In a full declaration, the corporate cycle, the use case lifecycle, the governance system and the value measurement rules must appear as applied, because the core (01 §14.1) requires them.


05Intensity of application

Field Content Guidance
Enterprise criteria applied Those in 01 §9.2 or those adjusted in C2, with reference to the approval.
Lite · Enterprise use cases Number of each as at the cut-off date.
Enterprise investment threshold approved in C2
Changes of intensity from Enterprise to Lite in the period Number and reason.

06Core rules (01 §14.1) and evidence

Code Core rule Question in document 11 Met? (Yes · No) Evidence available Audit result for the rule
N-01 Complete inventory with owner, regulatory classification and intensity. D6.05 T02; reconciliation of the inventory (32 §9).
N-02 Use case register with the traceability in 01 §6.11. D2.05 T01.
N-03 Intensity determined for each use case and reviewed at G3 and at each R6. — T01 (P04, T04).
N-04 All new use cases go through the lifecycle with their gates recorded. D2.06 T01, T03, P29.
N-05 G3 always decided separately. — T01 (G3 decisions).
N-06 Roles and bodies assigned in line with the incompatibilities in 01 §8.2. D1.07 · D1.08 Mandates (document 30); P03.
N-07 Dual validation and evidence prior to the decision. — T01 (verifier and evidence dates).
N-08 No "Yes ◆" criterion accepted as a condition. — T01, T03.
N-09 Value hypothesis with baseline and stop criteria before feasibility. — P08, P09; T11.
N-10 Regulatory classification and risk register before design; no Critical risk without board approval. — P11, P12; T06.
N-11 Tested rollback and current continuity review in production; regularisation of earlier systems within the C2 time limit. D4.07 T01; R6 minutes; regularisation list.
N-12 C1 and C2 completed; thesis, ambition per sphere and risk appetite approved by the board; quarterly information. D1.05 Board minutes; thesis and appetite; C1 report.
N-13 Value measurement rules applied and reporting to the board with the oversight dashboard. D7.05 · D7.06 T12; board dashboard (T17); minutes.
N-14 Nonconformities managed with the process in 01 §12. D6.07 T08; reports to the board committee.

07Adaptations and exceptions

Type Description Reason Approved by and date
Adaptation of parameters
Relevant exception in force Systems under regularisation with a time limit approved in C2.
(illustrative example) Adaptation of parameters Enterprise gate decision time limit of 15 working days instead of 10 Monthly AI Committee calendar AI Committee · 12-02-2027

08Supporting audit

Field Content Guidance
Audit code AUD-AAAA-NNN (P60).
Type of auditor Internal · External.
Auditor or firm For an external audit, with reference to their declaration of independence (P41).
Report date
Outcome Conformant · Conformant with observations. With Nonconformant, the declaration is not issued.
Improvement actions under way Mandatory if the outcome is Conformant with observations.
Reference verified maturity level Optional: modality and date of the last verified assessment (document 11). The declaration is based on the questions marked (§14), not on the overall level.

09Approval and validity

Field Content Guidance
Approving body Board or board committee.
Date and reference of the minutes
Validity Until the next annual framework audit in C5.
Loss of validity Nonconformant outcome in an audit or re-audit; major or critical nonconformity in one of the core rules; undeclared change of perimeter. In those cases, the declaration is withdrawn from communications until a re-audit is passed.
External recipients Customers, supervisors, investors or others, and date of communication.

10Model text

10.1 Full declaration

[Company name] declares that it applies SEVEN-G (version [number], of [date]), a framework by Fernando García Varela published under the CC BY 4.0 licence, since [date], within the following scope: [companies, areas and types of use]. The following are excluded: [exclusions], because [reason]. The following parameters have been adapted: [adaptations]. The following exceptions remain in force: [exceptions].

The declaration is supported by audit [AUD-AAAA-NNN], carried out by [internal audit or external auditor] on [date] with the outcome [Conformant or Conformant with observations]. [Where applicable: improvement actions are under way.] It was approved by [body] on [date] and is valid until [date of the next annual audit].

This declaration is a self-declaration by the company and is not a certification. There is no official SEVEN-G certification in version 0.x. Use of the SEVEN-G name does not imply endorsement by the author of the framework. [Company name] is solely responsible for identifying the regulation that applies to it, verifying that it is current and certifying its own regulatory compliance.

10.2 Modular declaration

[Company name] uses the following components of SEVEN-G (version [number]), a framework by Fernando García Varela published under the CC BY 4.0 licence: [components], within the scope [scope]. This statement is not a declaration of application of the full framework or a certification; there is no official SEVEN-G certification in version 0.x and use of the name does not imply endorsement by the author.

10.3 Expressions not permitted (91 §6.2)

"SEVEN-G certified", "SEVEN-G certification", "certified company" · "approved by SEVEN-G", "official partner" · "endorsed by Fernando García Varela" · "AI Act compliance guaranteed by SEVEN-G" · any statement that the company complies with regulation "according to SEVEN-G".


11Quality criteria

# Check Status
1 The type of declaration (full or modular) is consistent with the conditions met and with the model text used. Met · Not met · Not applicable · Pending
2 The fourteen core rules have linked evidence, and questions D1.05, D1.07, D1.08, D2.05, D2.06, D4.07, D6.05, D6.07, D7.05 and D7.06 are "Yes" in a verified assessment.
3 The supporting audit is from the last twelve months, covers the declaration and its outcome is not Nonconformant.
4 The auditor is independent of the implementation of the framework in the previous twelve months.
5 Scope, exclusions, adaptations and exceptions are declared with their reason.
6 The text includes the framework version, the CC BY 4.0 attribution, the statement that it is not a certification and the warning that use of the name does not imply endorsement by the author.
7 None of the expressions in 10.3 is used.
8 The declaration is approved by the board or the board committee and has a validity date.

12Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Prepares AI Office
Submits AI Committee
Audits Internal audit or independent external auditor
Approves Board or board committee

Segregation of duties: anyone who has implemented the framework in the company in the previous twelve months does not audit the declaration (38 §11.1; 91 §5).


13Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 19-09-2026 First version. Applies the conditions in 01 §14, the audit and minimum content in 38 §11, the model in 91 §6.3 and the questions marked (§14) in document 11; distinguishes the full declaration from the modular one (01 §1.2) and warns that there is no official certification in version 0.x.
0.2 01-10-2026 The seven conditions in 01 §14 become the fourteen core rules (01 §14.1, N-01 to N-14), with their question in document 11 and their evidence; new field "Core version applied".

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.