SEVEN-G
Template P33 · 19-09-2026

Template P33 · C1 diagnosis report

C1 diagnosis report

Brings together in a single verified report the actual situation of AI in the company: inventory, maturity, sphere map, transformation index, value and cost, risks and opportunities by sphere, and recommendations for the C2 decision.

Fernando García VarelaVersion 0.1 (working draft)19-09-2026Draft for review

Why it matters. The board cannot set a thesis, an ambition or a risk appetite without knowing what AI the company has, how much it contributes on the evidence and what risks it takes on. The C1 report is the diagnostic basis of C2: each component of the board's decision must cite it (13 §14, criterion 1). Without it, direction is set by opinion, maturity is inflated and transformation is declared without evidence.

01Instructions for use

Aspect Guidance
When it is used In C1: in the first implementation, at the end of month 1 (90 §4.2, week 4, milestone 1); section 10 is completed in month 2 (90 §4.3). In subsequent cycles, the diagnosis is integrated into the C5 annual review (P37).
Who completes it The AI Office as lead assessor, with the assessment team, management control (value and cost) and the AI Risk Owner (section 10).
Who verifies it An independent verifier: internal audit, AI Auditor or a third party with no involvement in the practices assessed (11 §4.2).
Who decides or approves The AI Committee approves the report and presents it to the board (01 §5.1). The committee does not modify answers: it may only request a new verification.
Corporate cycle stage C1 · Diagnosis. It is the input to C2 (P35) and C3 (P36).
Tools T02 (inventory), T15 and P34 (maturity), T16 (sphere map), T14 (transformation index), T12 and T13 (value and cost), T06 (risks).
Reference documents 01 §5.1 and §5.3; 11 §6; 10 §8 and §9.1; 12 §4, §5 and §10; 13 §15.A; 90 §4.2 and §4.3; 91 §4.2.
Lite versus Enterprise scope Both scopes use all sections. Fields marked (Enterprise) may be omitted in a Lite scope.

Completion rules:


02Identification

Field Content Guidance
Document code Identifier of the report; cited by the C2 decision (13 §15.A, "Reference C1 report").
Company or group In the examples, always fictitious.
Perimeter That of the mandate (P32). The inventory covers the whole company.
Implementation scope Lite · Enterprise (90 §2).
Period diagnosed and cut-off date DD-MM-YYYY.
Maturity assessment type Verified assessment · Independent assessment (11 §4.1).
Maturity questionnaire version and weights Equal weights unless others are declared.
Index threshold version 0.1 if those in 12 §4.5 are used.
Lead assessor
Independent verifier
Report version and date
Date of committee approval and of presentation to the board Reference to the minutes or DEC-AAAA-NNN.

03Executive summary

One page maximum. Written last.

Field Content Guidance
Three key messages Facts, not opinions, each with its evidence.
AI systems inventoried Total and in production; how many with Enterprise criteria.
Overall maturity level Stating whether the D1 or D6 cap has been applied.
Transformation index profile Assigned profile and, where applicable, underlying profile; provisional if coverage is below 6 out of 8.
Annual net value and proportion of validated value With the status of the amounts.
Risks requiring immediate action And the nonconformities opened for them.
Core rules (01 §14.1) already substantiated Out of 14.
What is asked of the committee and the board Accept the report and use it as the basis for C2.

04Scope and method

Field Content Guidance
Assessment team Nobody assesses a dimension whose practices they lead.
Interviews by role At least two per dimension, from different functions (11 §4.4).
Samples Size and stratification according to 11 §4.6.
Inventory sources Procurement, licences, contracts, security controls, interviews.
Limitations Information not available, areas not covered, time constraints.

05AI system inventory

Source: T02 and the completeness statements in the annex to P32.

Type (01 §1.3) Idea Pilot Under construction In production Total
In-house AI use cases
Third-party AI embedded in processes
Corporate use of general-purpose AI
Unauthorised use detected
Total
Field Content Guidance
Regulatory classification Number per category: prohibited, high risk, transparency obligations, minimal risk, out of scope, pending classification.
Systems with any Enterprise criterion (01 §9.2) By criterion.
Possible prohibited practices Escalated and with a critical nonconformity, or ruled out in a documented manner.
Coverage of the completeness statements Areas signed ÷ areas in the perimeter.
Unauthorised use recorded as a nonconformity Codes NC-AAAA-NNN.

06Maturity

Result of the maturity assessment recorded in P34, with the calculation rules in 11 §5.

Dimension Level Progress to the next Main blocking criterion Criteria met in advance Main strength Main gap
Strategy and governance (D1)
Value and portfolio (D2)
Data and knowledge (D3)
Technology and operations (D4)
People and adoption (D5)
Risk, security and compliance (D6)
Measurement and evidence (D7)
(illustrative example) D6 · Risk, security and compliance 1 75 % D6.03 (Partial): the inventory does not include corporate use — Corporate risk register including AI risks No independent AI Risk Owner
Calculation of the overall level (11 §5.3) Value
Weighted average (two decimal places)
Average rounded down
Cap = min (D1, D6) + 1
Overall level
Has the cap been applied? Yes · No
(§14) questions answered "Yes" (out of 10)

07Current sphere map

Built with the rules in 10 §8.1 and 10 §9.1. Amounts in euros for the period.

Sphere Optimise Augment Transform Level achieved Level in the portfolio Markers
01 · Customer
02 · Product and service
03 · People
04 · Operations
05 · Data
06 · Knowledge
07 · Decision
Enablement band (08 and 09) — —
(illustrative example) 04 · Operations 6 use cases · €1.60M · High — — Optimise Optimise No evidence in 2 use cases

Content of each cell: number of use cases (total and in production) · investment and recurring cost · validated annual net value · colour (No activity, Low, Medium, High). Markers: Gap · Outside the thesis · No evidence · Secondary (in C1 there are no C2 targets yet: the Gap marker is added in C3).

Sphere Dimension Current grade (Absent · Basic · Systematic · Advanced) Supporting indicators
08 Compliance
08 Anticipation
08 Ethical leadership
09 Structure
09 Speed and control
09 Supplier ecosystem

08Transformation index

Formal calculation with T14 and the rules in document 12. It is presented with the three elements in 12 §10.

Baseline condition Data Result
B1 · Governed portfolio Met · Not met · No data
B2 · Proportion of validated value
B3 · Scale in production
Signal Measured value Score (0–3) Remarks
1 · Investment mix
2 · Value mix
3 · Materialisation
4 · Depth of change
5 · Operating model
6 · AI-enabled revenue
7 · Progression to production
8 · Board decision In C1 it is usually 0 or 1: there is no approved thesis yet.
Sum (reference)
Field Content Guidance
Coverage (signals with data ÷ 8) If it is below 6 out of 8, the profile is provisional and a data plan with owner and deadline is added.
Transformation declaration (IT-D1 to IT-D3) Yes · No, with the evidence.
Evidenced profile 12 §5.2, step 1.
Assigned profile Step 2.
Complementary alerts 12 §5.3.
What would change the profile Two or three conditions, with owner and deadline.

09Current value and cost

Measurement rules in documents 40 and 42. Annual amounts for the period.

Item Validated Declared Estimated Total Source
Realised efficiencies T12
Return T12
Recurring cost T13
Annual net value Efficiencies + return − recurring cost
Released capacity (hours; not added) T12, T20
Build investment executed in the period T13
Cost category (document 42) Amount Remarks
Licences · Model consumption · Compute and infrastructure · Data · Build staff · Operations staff · Suppliers and services · Control and compliance · Adoption and training One row per category; "no data" if not known.

10Risk and opportunity map by sphere

Prepared in month 2 through workshops by sphere (01 §5.3; 90 §4.3) and incorporated as a new version of the report. It is the basis of milestone 2. Risks use the scale in document 33 (level = likelihood × impact: Low 1–4, Medium 5–9, High 10–15, Critical 16–25).

No. Sphere Type (Risk · Opportunity) Description Systems or use cases (SIA- or IA-) Risk level or proposed ambition Economic impact and status Owner Timeframe Next step
01
02
(illustrative example) 01 01 · Customer Risk The enquiries assistant in production does not inform users that they are interacting with an AI SIA-2026-004 12 High Sanction and complaints; estimated Head of customer service 30-11-2026 Regulatory classification (P11) and regularisation (P36)
(illustrative example) 02 04 · Operations Opportunity Automatic reconciliation of supplier invoices — Optimise €0.40M a year; estimated with formula Chief financial officer Entry in C3 Use case record (P31)
Summary Value
High and Critical risks, all with an owner
Systems with Enterprise criteria classified or with a classification date
Spheres with opportunities identified, or a record that there are none

11Findings and recommendations for C2

11.1 Findings

No. Finding Evidence Dimension or sphere Severity (High · Medium · Low) Nonconformity required? (NC-AAAA-NNN)
H01
H02

11.2 Recommendations for the C2 decision

One row per component in 13 §2 for which the diagnosis provides a basis. If a component has no diagnostic basis, "no data" is stated.

C2 component Recommendation Findings on which it is based Priority
AI thesis
Ambition per sphere
Risk appetite
Thresholds and time limits
Framework budget
Maturity targets by dimension References in 11 §8.
Regularisation of existing systems

12Quality criteria

# Check Status
1 Each maturity level has linked evidence and the assessment is verified (91 §4.2; 11 §4.1). Met · Not met · Not applicable · Pending
2 Absences are shown as "no data"; no signal is replaced by an estimate.
3 Value distinguishes validated, declared and estimated, and released capacity is not added.
4 The inventory includes in-house, third-party, corporate use and unauthorised use (question D6.03 in document 11), with signed completeness statements (D6.05).
5 The index has been calculated with its eight signals and the threshold version is recorded (question D7.08).
6 Risks and opportunities by sphere have an owner, economic impact and timeframe (90 §4.5, criterion 3).
7 Urgent risks have been treated as a nonconformity without waiting for approval.
8 The recommendations for C2 cite the findings on which they are based.

13Approval and verification

Function Role in SEVEN-G Name and position Date Signature or reference
Prepares AI Office (lead assessor)
Validates value and cost figures Management control
Prepares the risk map AI Risk Owner
Verifies Independent verifier (internal audit, AI Auditor or third party) Result: Conformant · Conformant with observations · Nonconformant
Approves AI Committee Reference to the minutes
Receives Board or board committee Reference to the minutes

Segregation of duties: the verifier has not taken part in the fieldwork and does not lead the practices assessed; the committee approves the report but does not modify answers.


14Version control

Completed document

Version Date Author Changes

Template

Version Date Changes
0.1 19-09-2026 First version. Brings together the mandatory C1 outputs (01 §5.1), the maturity report (11 §6), the current sphere map (10 §8), the presentation of the index (12 §10), value and cost with their status and the month-2 risk and opportunity map by sphere (01 §5.3).