Complementary cycles: legacy, debugging, urgent fixes and security

How SPAD applies the same rules when the work is not a new feature: undocumented code, incidents, emergencies and sensitive code

Fernando García VarelaVersion 0.119-09-2026Under construction
4complementary cycles
3root cause verdicts
4severity levels
0emergencies without review

01Purpose

The main cycle (document 01) builds new functionality. This document defines the four cycles that cover the rest of a team's real work, with the same rules: blocking phases, artefacts, an independent AI Reviewer, human validation and a record.

Cycle Used when Leads to
Legacy Existing code without sufficient documentation needs to be modified. The main cycle, from phase 1.
Debugging A problem appears in production or in development. Main cycle (code), configuration adjustment or action on infrastructure.
Urgent fix A critical incident requires an immediate solution. Solution deployed, post-mortem and, where applicable, a definitive plan.
Security The code handles sensitive data, authentication, authorisation or payments, or the context requires it. Classified findings; critical and high findings block deployment.

02Legacy cycle

2.1 Phases

Phase Owner Input Mandatory output
L1 · Documentation of what exists AI Analyst Existing code and its location. Current behaviour (purpose, functions, inputs, outputs, side effects); components and internal and external dependencies; flow and architecture diagrams; identified risks.
L2 · Impact analysis AI Analyst Documented code and objective of the change. Affected areas with impact level; risks of the modification and mitigation; related existing tests and coverage gaps; edge cases and whether they have a test; recommendations.

Afterwards, the work continues in phase 1 (PLAN) of the main cycle, which takes L1 and L2 as input.

Legacy cycle
Understand before changing
flowchart LR
  A["Existing code"] --> L1["L1 · Documentation of what exists"]
  L1 --> L2["L2 · Impact analysis"]
  L2 --> P["Main cycle from phase 1"]
Source: SPAD

2.2 Rules

Why it matters. Most changes in production are changes to legacy code. Modifying what is not understood is the usual cause of regressions; the legacy cycle forces understanding first and leaves in writing what was understood.


03Debugging cycle

3.1 Phase

Phase Owner Input Mandatory output
Diagnosis (D1) Diagnostic AI Description of the incident, environment, available evidence (logs, traces, configuration). Root cause report: analysis mode; evidence examined; technical explanation; category (logic error, configuration, race condition, resource exhaustion, dependency, other); verdict: code · configuration · infrastructure; prioritised actions.

Analysis modes:

Mode What it does When
Static analysis Examines code, configuration and logs without executing anything. Always as the first step; the only mode if there is no safe execution environment.
Analysis with execution Reproduces the problem with traces in a controlled environment. When static analysis is inconclusive and a test environment exists. Only temporary traces or flags are admitted; no functional change.

3.2 Outputs according to the verdict

Verdict Next step
Code Main cycle from phase 1 (or urgent fix if the incident is critical).
Configuration Configuration adjustment recorded as a change, with rollback.
Infrastructure Action on infrastructure recorded as a change, with rollback.
Debugging cycle
Diagnosis first; the solution depends on the verdict
flowchart LR
  I["Incident"] --> D["D1 · Diagnosis"]
  D --> R["Root cause report"]
  R --> V{"Verdict"}
  V -->|"Code"| P["Main cycle or urgent fix"]
  V -->|"Configuration"| C["Recorded configuration change"]
  V -->|"Infrastructure"| INF["Recorded action"]
Source: SPAD

3.3 Rules

Why it matters. Under the pressure of an incident, the temptation is to ask the AI to "fix it". Separating diagnosis from solution avoids fixing symptoms and produces a report that explains what happened, which is what management, the customer or the auditor ask for afterwards.


04Urgent fix cycle

For critical incidents (priorities P1 and P2 according to the organisation's scale) that require an immediate solution. It speeds up the phases; it does not eliminate them.

4.1 Phases

Phase Owner Mandatory output Global context parameter
U1 · Rapid diagnosis Diagnostic AI Abbreviated root cause report with verdict. —
U2 · Simplified plan AI Planner Proposed minimal change, scope, risk, rollback plan. Maximum time for the plan (starting value to be set by each organisation).
U3 · Accelerated review AI Reviewer Verdict on the simplified plan. Mandatory. —
U4 · Implementation with minimal tests AI Builder Change and minimal tests covering the fixed path. Mandatory. —
U5 · Deployment Authorised person Recorded deployment with method and rollback available. Emergency approval: who may give it.
U6 · Monitoring Operations Monitored indicators and status (stable · unstable · rolled back). Minimum duration of monitoring.
U7 · Post-mortem Person orchestrating, with diagnostic AI Timeline, root cause, effectiveness of the fix, lessons, actions with owner and date; if the fix is provisional, topic of the definitive plan. Maximum time for the post-mortem.
Urgent fix
Faster, with the same guarantees
flowchart LR
  P1["Critical incident"] --> U1["U1 · Rapid diagnosis"]
  U1 --> U2["U2 · Simplified plan"]
  U2 --> U3{"U3 · Accelerated review"}
  U3 -->|"NO-GO"| U2
  U3 -->|"GO"| U4["U4 · Implementation and minimal tests"]
  U4 --> U5["U5 · Deployment"]
  U5 --> U6["U6 · Monitoring"]
  U6 --> U7["U7 · Post-mortem"]
  U7 -->|"Provisional fix"| DEF["Definitive plan in the main cycle"]
Source: SPAD

4.2 Rules

Why it matters. Emergencies are the moment when controls are most relaxed and errors do the most damage: a hasty fix without review or tests frequently produces the second incident. SPAD speeds up the review and reduces the tests to the minimum, but does not remove them, and turns every emergency into learning.


05Security cycle

5.1 When it is mandatory

Situation Security review
Authentication, authorisation, session or secret management. Mandatory.
Payments, monetary operations, financial data. Mandatory.
Personal data or confidential information. Mandatory.
Untrusted user inputs, exposed interfaces. Mandatory.
AI components in production (instructions, agents, information retrieval). Mandatory, with the requirements of document 05.
The rest of the code. Recommended; according to the project context.

5.2 Phase

Phase Owner Input Mandatory output
S1 · Security review AI Security Reviewer (other than the builder) Implemented code, security context, dependencies. Scope reviewed; vulnerabilities with identifier, severity, category, reference to the reference list (OWASP Top 10 and, for AI components, OWASP Top 10 for Large Language Model Applications), location, exploitation scenario and remediation; secret management; dependencies with known vulnerabilities; deployment decision; residual risks.

5.3 Severities, blocking and risk acceptance

Severity Effect Who decides
Critical Blocks deployment. Returns to fixes (phase 9) and a new security review. Nobody can accept it as residual risk.
High Blocks deployment. Returns to fixes and a new review. Only exceptionally, acceptance by the risk authority of the global context, in writing and with a fix date.
Medium Does not block. It is fixed or accepted as residual risk. Person with acceptance authority according to the global context.
Low Does not block. It is fixed or accepted. Person orchestrating.

The scale corresponds to that of SEVEN-G for organisations that apply it (SEVEN-G 33 · AI risk methodology); in those organisations, residual risk is accepted by the body corresponding to its level and critical and high findings block decision gate G5.

No AI accepts a residual risk. The AI Security Reviewer classifies and recommends; a person accepts.

Security cycle
Classify, fix what blocks, accept what is residual in writing
flowchart LR
  C["Implemented code"] --> S["S1 · Security review"]
  S --> K{"Severity"}
  K -->|"Critical or high"| F["Fixes and new review"]
  F --> S
  K -->|"Medium or low"| D{"Human decision"}
  D -->|"Fix"| F
  D -->|"Accept"| R["Documented residual risk"]
  R --> OK["Deployment authorised"]
Source: SPAD

5.4 Supply chain and licences

The security review and the code review (phase 8) also check:

Why it matters. Code generated with AI inherits the vulnerabilities and the licences of whatever the AI proposes to incorporate. Reviewing one's own code and not its dependencies leaves the most used door open.


06Handover to operations

All cycles that end in a deployable change go through version management (phase 10 of the main cycle or U5–U6 in the urgent fix), which includes the deployment plan, a tested rollback plan, monitoring requirements and the operations owner. In organisations that apply SEVEN-G, this links to the operations manual and the rollback plan (SEVEN-G 52 · AI operations manual).


Document Relationship
document 01 · Operating guide Main cycle into which these cycles lead; phase 9 of fixes; phase 10 of versions.
document 02 · Contexts, topics and artefact register Parameters for time limits, severities and acceptance in the global context.
document 03 · Validation policy Phase violations specific to these cycles.
document 05 · Systems that include AI Additional security requirements for AI components.
document 07 · Input and output contracts Structure of the root cause, security and urgent fix reports.
SEVEN-G 33 · AI risk methodology Risk scale and acceptance in SEVEN-G.
SEVEN-G 53 · Building solutions with AI SEVEN-G evidence into which these cycles lead.

08Version control

Version Date Changes
0.1 19-09-2026 First version. Develops the four cycles with numbered phases, rules and diagrams; characterisation tests in legacy; time limits as parameters of the global context; severities with blocking and human acceptance of risk; supply chain and licences; handover to operations.

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.