SPAD
Document 02 · 19-09-2026

Document 02 · Contexts, topics and artefact register

Contexts, topics and artefact register

Which rules are loaded before any phase, how work is grouped into topics and what is recorded for each artefact, each human validation and each model used

Fernando García VarelaVersion 0.119-09-2026Under construction
2mandatory contexts
1topic per piece of work
3records per artefact
20maximum characters in the topic

01Purpose

This document defines three mechanisms that make work with SPAD consistent across projects and reconstructible afterwards:

Mechanism Question it answers
Contexts Under which rules does the AI work in this organisation and in this project?
Topics Where are all the artefacts of this feature, fix or incident?
Records Who validated each output, with what outcome, and which model produced it?

02Contexts

Two contexts are loaded before any phase is executed. No instruction (document 06) is executed without them.

2.1 Global context

Universal rules of the organisation, applicable to all projects that use SPAD, regardless of the technology or the domain.

Mandatory section Content Illustrative example
Artefacts Location, names and format of the artefacts and diagrams. documentation/{{TOPIC}}/SPAD_NN_PHASE.md; diagrams in Mermaid.
Tests Minimum coverage per layer; mandatory integration tests for interfaces; end-to-end tests for critical flows. Minimum unit coverage of 80 % (starting value, to be calibrated by each organisation).
Versioning Semantic versioning; change log with each release; breaking changes documented. MAJOR.MINOR.PATCH.
Baseline security No secrets in the code; input validation; authentication at sensitive points; technical reference for the security review. OWASP Top 10 as the reference list.
Data and model providers Which classes of information may be sent to each approved AI provider and environment, and which never (personal data, secrets, proprietary code according to its classification). "No real personal data in instructions to external providers; synthetic test data."
Prohibitions What no phase may do. Code in the PLAN phase; design decisions in the implementation; self-approval.
Parameters of the complementary cycles Maximum time limits for the simplified plan and for post-deployment monitoring in the urgent fix; severity scale and who accepts the residual risk. Starting values, to be calibrated (document 04).
Approved models Providers, models and versions authorised per role, and which may not coincide in building and reviewing. "The AI Reviewer uses a model or provider other than the builder's for sensitive code."

Why it matters. The data and providers section is the one most often forgotten and the one that prevents the most damage: without it, each person decides on their own which code, data or secrets to paste into an external tool. It is also the point of connection with the corporate AI use policy (SEVEN-G 31 · Corporate AI policy and acceptable use policy).

2.2 Project context

Rules of the specific project, which complete the global context or make exceptions to it.

Section Content
Technology Language, frameworks, versions, database, infrastructure.
Architecture Patterns and constraints (stateless, multi-instance, queues, latency limits).
Domain rules Business rules that the design cannot violate (for example, dual authorisation in monetary operations, record retention).
Compliance Applicable obligations (data protection, sector regulation) and their effect on the design.
Team conventions Naming, reviews, branches.
Deployment Environments, windows, constraints.
Justified exceptions Rules of the global context that this project does not meet, with justification and risk (section 2.3).

2.3 Precedence and exceptions

If the project context contradicts the global one:

  1. The project context prevails, only if the exception is written down and justified.
  2. The exception includes the risk of departing from the global rule and how it is mitigated.
  3. The AI Reviewer evaluates the exception in the plan review and flags it in its verdict.
  4. It is approved by the person orchestrating (or whoever the global context designates for exceptions), and the approval is kept in the validation record (section 4). No AI approves an exception.

Illustrative example. The global context requires 80 % unit coverage. A legacy code migration project without tests sets 70 % for new code and a 10 % increase per iteration for the legacy code. The AI Reviewer evaluates it as reasonable because of the gradual plan; the technical owner approves it and it is recorded with the date.


03Topics

Each piece of work with SPAD is associated with a topic (TOPIC): a short identifier that groups all its artefacts.

Rule Detail
Format snake_case, maximum 20 characters, descriptive.
Represents A feature, a fix, an incident or a use case.
Set In phase 0, explicitly (given by the person) or inferred (proposed by the AI and confirmed by the person).
Persists Throughout the work; it does not change midway; it is not reused for another feature.
Valid examples user_auth, pdf_export, payment_gateway, cache_mem_leak.
Invalid examples feature_123 (not descriptive), tmp, fix (generic), long names in another format.

3.1 Organisation of artefacts

documentation/
├── {{TOPIC}}/
│   ├── SPAD_01_PLAN.md
│   ├── SPAD_01_AUDIT_PLAN.md          (NO-GO)
│   ├── SPAD_02_PLAN.md                (second iteration)
│   ├── SPAD_02_AUDIT_PLAN.md          (GO)
│   ├── SPAD_02_CODE_PRIMER.md
│   ├── SPAD_02_TEST_STRATEGY.md
│   ├── SPAD_02_IMPLEMENTATION.md
│   ├── SPAD_02_TEST_IMPLEMENTATION.md
│   ├── SPAD_02_AUDIT_TESTS.md
│   ├── SPAD_02_AUDIT_CODE.md
│   ├── SPAD_02_FIX_PRIMERS.md
│   ├── SPAD_02_VERSION.md
│   ├── VALIDATION.md                  (human validation record)
│   └── diagrams/
└── {{TOPIC_2}}/

The sequential numbering keeps every iteration: a rejected plan is not deleted; it is kept with its review and the next iteration takes the next number. In this way it can be seen what was attempted, why it was rejected and what changed.

Why it matters. The topic folder is the unit of audit. Anyone who needs to know, months later, why a component is built the way it is finds in a single place the initial intention, the plan, the review, the code, the tests, the fixes, the version and who validated each step.


04Records per artefact

Each artefact carries three records. The first two are mandatory in all work; the third, in the complete version.

4.1 Model record

What produced the artefact. Without it, a result cannot be reproduced or explained when the provider changes.

Field Content
Provider and model Name and version of the model (or identifier of the tool).
Date and time Of the generation.
Role Planner, reviewer, builder, fixer, analyst, diagnostic, security reviewer.
Instruction Reference to the instruction used (document 06) and its version; in the complete version, the full text of the additional instructions.
Contexts Version of the global and project contexts loaded.

4.2 Human validation record

Who validated the artefact and with what outcome. It is the evidence of human control; without it, traceability only proves what the AI did.

Field Content
Artefact Name and iteration number.
Person Who validates (orchestration role or human code review).
Date Of the validation.
Outcome Valid · Invalid (with the cause from the validation policy, document 03) · Exception approved.
Verdict accepted If the artefact is a review: the AI's verdict and whether the person accepts or rejects it, with the reason.
Observations What the person adds or disagrees with.

The record is kept in VALIDATION.md within the topic (or in the version control system, if the organisation prefers) and is completed at the time, not at the end.

4.3 Violation log

Each response discarded under the validation policy (document 03) is noted with date, phase, cause, model and action. It is the raw material for the process metrics (document 08) and for improving the instructions.

Why it matters. The three records answer the three questions of any development audit: which tool did this, which person accepted it and how many times it had to be discarded and repeated. In SEVEN-G, those records are the input to the evidence of the design and delivery phases (SEVEN-G 53, section 7.2).


05Checklist before starting


Document Relationship
document 01 · Operating guide Phases in which the recorded artefacts are produced.
document 03 · Validation policy Invalidation causes that feed the records.
document 07 · Input and output contracts Structure of the artefacts, with the fields of the model record.
document 08 · Self-assessment and metrics Use of the records as evidence and as the source of the metrics.
SEVEN-G 31 · Corporate AI policy and acceptable use policy Origin of the rules on data and providers in the global context.
SEVEN-G 53 · Building solutions with AI How the contexts are derived from SEVEN-G evidence and what traceability requires.

07Version control

Version Date Changes
0.1 19-09-2026 First version. Develops the previous management of contexts and topics; adds to the global context the sections on data and providers, parameters of the complementary cycles and approved models; exceptions are approved by a person; incorporates the model record, the human validation record and the violation log.

External sources cited

Links to the official or primary source, checked before publication. Always verify the version in force on the date of use.