Legal notice and disclaimer. SEVEN-G is a reference methodological framework provided "as is" and for information purposes only. It does not constitute legal, regulatory, financial or professional advice, nor does it guarantee compliance with any law or standard. References to general regulation (such as the EU AI Act, the GDPR, DORA or NIS2), to technical standards and to regulation specific to each sector or jurisdiction may be incomplete, may not apply to a particular case or may become out of date as a result of regulatory changes, interpretations or supervisory positions after their consultation date. Each organisation that uses SEVEN-G is solely responsible for identifying the regulation that applies to it, verifying that it is current and certifying its own regulatory compliance, with the appropriate qualified advice. This methodology is a generic, free aid shared with the community so that nobody has to start from scratch; each person or organisation can and should adapt it to its own use. It must not be inferred that its legally sensitive parts have been reviewed by legal counsel: those reviews, for each company or sector, are the ultimate responsibility of the company, consultant or organisation that uses it. Although every effort is made to keep it up to date, some regulation may have changed without being reflected here. To the fullest extent permitted by law, the author accepts no responsibility whatsoever for the effects of its application in any organisation or for its full applicability. The methodology does not grant certification of any kind. The author accepts no liability for any use made of this content or for any decisions taken on the basis of it. The data, figures, companies and cases in the examples are fictitious or illustrative.
01Objective
By the end you will be able to choose your company's implementation scope, distinguish what is mandatory from what is proportionate and prepare the start of a 90-day plan.
02Key ideas
- Two different proportionality decisions. Intensity (Express, Lite or Enterprise) belongs to each use case; implementation scope (Lite or Enterprise) belongs to the company. Size decides neither.
- A single library, three layers. Essential (what every company applies), conditional (what a trigger activates) and complete (guides and reference). There are no reduced versions of the documents.
- No phase or gate is skipped. In Lite they are grouped —G0 to G2 in one session, G4 and G5 in another— and the evidence is simplified. G3 always goes separately.
- The starting point changes the order, not the destination. A company with no AI, another with predictive models in production and another with many pilots start with different milestones (document 96), but reach the same fourteen-rule core (01 §14.1).
- Technology does not add maturity. Maturity is read through three lenses: governance capability, technology footprint and impact reach (11 §7.6). Having agents with weak risk control is an alert, not more maturity.
- Ninety days to have a diagnosis, a direction and a first portfolio, with no moratorium: AI activity continues while the framework is implemented.
03Guided tour
| Step | What to open | What to look at |
|---|---|---|
| 1 | document 94, sections 2 and 3 | The three layers, the five levels, the fourteen-rule core that is never omitted (N-01 to N-14) and the difference between principle, practice and instrument. |
| 2 | document 94, section 4 | The triggers: which ones occur in your company? |
| 3 | document 01, section 9 | The Enterprise criteria of a use case. |
| 4 | document 90, section 2 | Company Lite or Enterprise scope and minimum path in Lite. |
| 5 | document 90, section 4 | The 90-day plan, week by week, and its completion criteria. |
| 6 | document 90, section 8 | Common mistakes. The first: starting by buying or building tools. |
| 7 | document 92 | Application cases, including medium-sized companies. |
| 8 | document 96 and tool T23 | The six starting points, the five modifiers and the 22 milestones with their priority. Load the PP-B example in T23 and compare it with the demo, which comes out as PP-F. |
| 9 | document 11, section 7.6, and T15, "Three lenses" view | Technology footprint, impact reach, minimum governance required and alerts of the example company. |
04Exercise
- With the five criteria of document 90 (section 2.2), decide your company's implementation scope.
- With the triggers of document 94 (section 4), mark those that occur today. That is your conditional layer.
- Write the names of the three minimum people: whoever drives and builds, whoever controls the risks and whoever runs the AI Office. If three different people do not come out, that is your first governance problem.
- Answer in T23 the twelve questions of the questionnaire for your company. Note your archetype, your traits and the three priority-1 milestones you do not have yet.
- Book the board session for week 12.
05Self-check
- A medium-sized company launches a single Transform bet. Does its implementation scope change?
- Which gates can be grouped in a Lite use case?
- Is the AI system inventory reduced in Lite scope?
- Is it mandatory to use the T01 application?
- A company has agents with A2 autonomy in production and D6 at level 2. Is it more mature than another that only has predictive models and D6 at level 3?
06Next step
You have finished the course. Go back to the course guide to see other paths, or start with document 90. If you need support, document 91 describes the possible models and document 04 indicates how to contact the author; using the framework does not oblige anyone to hire anybody.
Answers. 1) No: that use case is Enterprise and is approved by the board, but the company's scope remains Lite. 2) G0, G1 and G2 in one session, and G4 and G5 in another; G3 always separately. 3) No: it covers all systems, including third-party and unauthorised ones. 4) No: what is mandatory is the register; it can be kept in a spreadsheet with the data model of document 03. 5) No. The technology footprint does not add maturity: the first company is at HT5, which requires D6 at 3, and it has the high-severity "adoption ahead of governance" alert (11 §7.6).