⌂ AI Consulting SEVEN-G
ESEN

AI action areas · Technology and control

Data, build and operations

Which data it is built on and how it is kept alive in production.

In brief

What this area is about

An AI system is built on data with permission to use and known quality. In production its behaviour, cost and drift are monitored. Each change is classified before it is applied, and there is always a tested plan to roll back.

Presentations

This area in slides

The whole area in one slide, or in ten slides to explain it in a meeting or a classroom. PowerPoint (editable) and PDF with the notes of each slide.

1 slide

Data, build and operations in 1 slide

Which data an AI system is built on and how it is kept alive in production: data, lineage, build, monitoring, changes and rollback.

PowerPoint →PDF →

10 slides

Data, build and operations in 10 slides

Data with permission and quality, AI-assisted build under control and monitored operation: drift, changes, cost, rollback and continuity review.

PowerPoint →PDF →

Concepts

The concepts you need

Definitions taken from the SEVEN-G glossary (document 02). The codes are links to where each one is explained.

AI system
Machine-based system that, with varying levels of autonomy, infers from the input it receives how to generate outputs—predictions, content, recommendations or decisions—that can influence physical or virtual environments. It is aligned with the EU AI Act definition and is identified in the inventory with the code SIA-AAAA-NNN.
Generative AI
Systems that generate content (text, image, audio, code) from instructions and context. It is a value of the technology tag and triggers the [GEN] criteria.
Rollback plan
Plan to return to a previous safe situation (previous version, non-AI alternative, reduced autonomy or scope) if the solution fails. It must be tested before go-live.
Minor · significant · substantial change
Classes of change to a system in production. Minor: does not alter behaviour or controls. Significant: alters behaviour within the approved purpose, scope, autonomy and risks, and requires regression evaluation, updating of the documentation and a report at the next R6. Substantial: alters the approved purpose, scope, autonomy, data, critical controls or risk profile, and requires a return to the relevant gate.
AI Operations Owner
Building role: accountable for stability, monitoring, incidents and changes in production. It cannot verify evidence of its own operation.
R6 · Continuity review
Periodic review that replaces the gate in phase 6: at least quarterly in Enterprise and half-yearly in Lite. It checks realised value against the hypothesis, stability, incidents, compliance and the validity of the classification. Outcomes: Proceed with operation, Proceed with conditions or Bring G7 forward. Omitting it is a major nonconformity.
Agentic mesh
Architecture in which a company's own agents discover, identify and coordinate with each other under common controls (identity, permissions, logging and gateway). A term in general use in the sector; in SEVEN-G it has no criterion of its own and refers to the agent controls.
Full glossary (document 02) →

In the framework

Where it is covered

Documents, sections, templates, tools and examples that develop this area.

Sources

External sources it is based on

Official or primary sources cited by the documents of this area, checked in the reference register. Always verify the version in force on the date of use.