⌂ AI Consulting SEVEN-G
ESEN

AI action areas · Technology and control

Standards

What SEVEN-G covers of ISO/IEC 42001, NIST and the EU AI Act.

Part of Risk, security and agents →

In brief

What this area is about

Standards say what must exist; SEVEN-G is the operating layer that makes it work. The crosswalk shows, row by row, what the framework covers of each standard and what it does not. SEVEN-G does not certify: certification is issued by an accredited body.

Presentations

This area in slides

The whole area in one slide, or in ten slides to explain it in a meeting or a classroom. PowerPoint (editable) and PDF with the notes of each slide.

1 slide

Standards in 1 slide

What SEVEN-G covers of ISO/IEC 42001, NIST and the EU AI Act, and what it does not: operating layer, crosswalk, NIST profiles and applicability.

PowerPoint →PDF →

10 slides

Standards in 10 slides

What SEVEN-G covers of ISO/IEC 42001, NIST and the EU AI Act: crosswalk, NIST profiles, applicability, mistakes and how to start.

PowerPoint →PDF →

Concepts

The concepts you need

Definitions taken from the SEVEN-G glossary (document 02). The codes are links to where each one is explained.

Coverage crosswalk
Table showing, for each requirement of a standard or regulation (ISO/IEC 42001, 38507, 23894, 42005, NIST AI RMF, EU AI Act), where SEVEN-G covers it, with which core rule and which evidence, and its coverage: direct, partial, requires external control or not covered. It is generated from a versioned data file; it is not a certification or a declaration of conformity.
NIST CSF
NIST Cybersecurity Framework, version 2.0 (NIST CSWP 29, February 2024): voluntary taxonomy of cybersecurity outcomes with six functions (GV govern, ID identify, PR protect, DE detect, RS respond and RC recover), 22 categories and 106 subcategories, organisational profiles and tiers. SEVEN-G maps it in 34 §5.3 and in the "CSF function" column of the SEG and AG controls.
Cyber AI Profile
NIST CSF 2.0 community profile for AI (NIST IR 8596). It organises the CSF subcategories into three areas —Secure (protecting the components of AI systems), Defend (using AI in cyber defence) and Thwart (thwarting attacks that use AI)— and proposes a priority for each one. As at the consultation date it is a preliminary draft (December 2025): it is used for guidance and does not underpin gate criteria.
Current profile · target profile
In the NIST CSF and the NIST AI RMF, the current profile describes the outcomes (subcategories) that the organisation achieves today and the target profile, those it wants to achieve, prioritised. The difference between them is the gap that becomes an action plan. SEVEN-G expresses the degree of each outcome with the 0–5 maturity scale (section 4.9), not with tiers.
Declaration of application
Statement by a company that it applies SEVEN-G because it meets the fourteen core rules (01 §14.1). It is a verifiable self-declaration subject to audit, not a certification: in version 0.x there is no official certification of the framework.
Full glossary (document 02) →

Sources

External sources it is based on

Official or primary sources cited by the documents of this area, checked in the reference register. Always verify the version in force on the date of use.