# T01 · Use case register

## Legal notice and disclaimer

SEVEN-G and this tool are provided “as is” and for information purposes only. They do not constitute legal, regulatory, financial or professional advice, nor do they guarantee compliance with any regulation. The criteria, classifications and references to general regulation (EU AI Act, GDPR, DORA, NIS2…) or sector-specific regulation may be incomplete, may not apply to a specific case or may become outdated as a result of regulatory changes. Each organisation that uses the tool is solely responsible for identifying the regulation that applies to it, verifying that it is current and certifying its own regulatory compliance, with the appropriate qualified advice. The author accepts no liability whatsoever for the use of the tool or for decisions taken with it. The demo data is fictitious.

In the interface, this notice appears in the footer of every view, is shown prominently on first load (dismissing it is remembered in the browser) and is always available from the “Legal notice” link in the header and footer. Next to the regulatory classification (record, registration and edit, T02 inventory and T04 intensity determination) the interface states that it is indicative and must be carried out by the organisation with qualified legal judgement.

**SEVEN-G** reference tool (wave 1 · core) for managing the AI portfolio as a funnel: phases, statuses, dated events, decision gate criteria, conditions, value and metrics. It includes, as modules, **T02** (AI system inventory), **T03** (gate manager), **T04** (intensity determination) and **T05** (ambition classifier).

Specification: document 03 (§3 and §4), document 01 (§6–§9), document 00 (§5.2 and §6) and document 21 (gate criteria).

## On-screen help

Each view has a **“?”** button next to its title that explains, in the active language (Spanish or English), what the view shows, how to read it, what each column, label or figure in it means, why it matters and where it is explained in SEVEN-G. In addition, every table header, record label and header figure shows its explanation as a tooltip (D123). The texts live in `_fuentes/ayuda.json` (views and the explanation of each column by its translation key, in both languages); the shared module `../_comun/ayuda.js` displays them and `build_registro.ps1` embeds them when generating. A new view or column needs its entry in `ayuda.json` in both languages (`verificar_coherencia.ps1`, section 28).

## Files

| File | Content |
|---|---|
| `registro.html` | Complete single-file application (HTML, CSS and JavaScript, no dependencies). **It is generated** by `build_registro.ps1` from the JSON files; it is never edited by hand. |
| `datos_demo.json` | Source of the (fictitious) demo data the application opens with, valid against the schema. |
| `catalogo_criterios.json` | Source of the catalogue of 128 gate criteria from document 21, in Spanish and English (one criterion per line). |
| `esquema_registro.schema.json` | JSON Schema 2020-12 of the common data model (03 §4), with closed lists and code patterns. Version 0.5. |
| `build_registro.ps1` | Builds `registro.html` by embedding the JSON files in the template. It checks the sources before generating. |
| `_fuentes/registro.plantilla.html` | The application without data: the only thing edited by hand. It is not published. |
| `README.md` · `README_en.md` | This document, in Spanish and English. |

## How it is built: from the JSON files to the register and from the register to the dashboard

The register follows the same pattern as the board dashboard (T17): **data lives in JSON and the HTML is generated by embedding it**, so that it works when the file is opened from disk.

```mermaid
flowchart LR
  A["datos_demo.json<br>catalogo_criterios.json<br>template"] -->|build_registro.ps1| B["registro.html<br>(T01)"]
  B -->|Export full JSON| C["T01_registro_YYYY-MM-DD.json<br>(one or several)"]
  C -->|Import or merge| B
  C --> D["t01_a_panel.py<br>(T17 connector)"]
  E["config_panel.json"] --> D
  D --> F["Dashboard JSON"]
  F --> G["Full and mobile<br>dashboard"]
```

- `pwsh -File build_registro.ps1` generates `registro.html` with the demo data. With `-Datos my_register.json` the application starts with that register instead of the demo, and `-Salida` sets the output file.
- The script checks that the JSON files can be read, that the catalogue has no repeated codes, that use cases, events, amounts and decisions point to entities that exist, and that the linked example dashboard exists.
- **Why it matters.** The register is the single data entry point: each use case is entered once, like an opportunity in a CRM, and both the register funnel and the board dashboard come from that same JSON. No figure is hand-written in any HTML, so the dashboard can be rebuilt at any time from the register JSON file or files.

## How to open it

1. Double-click `registro.html`. It works from disk (`file://`), without a server, installation or connection.
2. The first time, the demo data is loaded: a banner states that the **use cases are examples** and links, as the header does, to the **board dashboard generated from those same use cases** (T17). With your own data, the link leads to the connector page. From then on, every change is saved automatically in the browser’s local storage (`localStorage`), tied to that browser and that file path.
3. Language (ES/EN) and theme (auto, light or dark) are selected at the top right. The preference is remembered.
4. In **Data**, set the *reference date* (cut-off date for days and alerts). The demo data sets it to 16-09-2026; empty means “today”.
5. The **"Data: …"** button in the bar says where the data is (sample, this browser, a file on the computer or the company's server) and opens the "Where my data is" dialog with the three ways to keep it (document 03 §2.1): only in this browser (default; the first time something is changed, a banner says so); in a **JSON file on the computer** that the tool rewrites with every change and reads again when opened (Edge or Chrome; the file is the same one "Export" downloads); or, in a copy of the site served over http within the company, the file `herramientas/datos/T01_registro.json`, which replaces the sample data for the whole company. On the public site that folder does not exist.

The application does not send data to third parties or load external resources (it uses system fonts; Google Fonts is not linked so that no browsing data is shared).

## Views (03 §3.7)

| View | What it does |
|---|---|
| **Funnel** | Portfolio indicators, funnel by phase broken down by status, stalled use cases and expected value, and a use case table with days in phase against the limit and alerts. Filters by sphere, ambition, intensity, regulatory classification, technology, exposure, value type, area, status, phase, supplier, free tag and text. |
| **Kanban board** | Cards by phase (0–7) and a closed column. Cards change column when the gate decision is recorded. |
| **Record** | Tabs: summary (identification, owners with incompatibilities, classification, lifecycle, value, risk and compliance, and data for the board dashboard), current gate (T03), conditions, value (validated, declared or estimated), risks (T06: the use case's matrix and register), event timeline and gate history with criteria. From G3 onwards, the gate tab summarises the risk matrix. |
| **Pending gates** | Requests awaiting verification or decision, with working days against the limit, blocking criteria and unverified evidence; upcoming or overdue continuity reviews. |
| **Alerts** | Stalled use cases, decision overdue, expired conditions, overdue continuity reviews, evidence pending verification, third iteration (escalation), resumption overdue, incompatible roles, overdue nonconformities, low adoption and risk matrix observations (T06). |
| **Risks (T06)** | Risk matrix and register of the use cases that pass the filters: 5 × 5 likelihood × impact matrix, residual or inherent, with the number of risks per cell (clicking a cell filters the register); summary by level and by the ten categories in document 33; observations from the methodology; register with inherent and residual assessment, controls and their effectiveness, response, owner, acceptance, status and review; creation and editing; CSV export. Own filters by category, residual level and status, and inclusion of closed risks. |
| **Analysis** | Metrics from 03 §3.5, segmentable with the filters (see below). |
| **Inventory (T02)** | In-house, third-party and corporate-use systems, with classification, intensity, autonomy, suppliers, owner and review; consistency warnings against the register. |
| **Data** | Export, steps to generate the board dashboard, import of one or several JSON files (replace or merge), preferences, reference time limits (C2/C5), people and suppliers. |

## Rules enforced by the tool

**Events.** Every change (registration, phase entry and exit, request, verification, decision, escalation, conditions, hold and resumption, classification changes, field edits, value, evidence, retirement) generates an event with the date of the fact, author, a mandatory reason and, where relevant, field, previous value and new value. Events cannot be edited or deleted from the interface.

**Gate manager (T03).**
- Embedded catalogue of criteria G0.01–G7.12 and R6.01–R6.16 from document 21, in Spanish and English (criterion text and ambition note from the Spanish and English versions of the document, with the same codes), with obligation (Yes, Yes ◆, Conditionable; “Rec.” in the intensity column is treated as recommended), Lite/Enterprise applicability and ambition note.
- Automatic, justified *Not applicable* by intensity, [GEN], [AG] and [TER] tags, Transform-only criteria and outcome criteria (Scale, Iterate, Retire) according to the proposed outcome. A manual *Not applicable* without justification is treated as *Not met*.
- Degree of compliance (met ÷ applicable), blocking criteria, open conditionable criteria and omitted recommended criteria.
- Prevents **Proceed** (and Continue operation or Scale) with mandatory criteria *Not met* or *Pending*, or with open conditionable criteria; **Proceed with conditions** only on open conditionable criteria and without blocking criteria; no outcome without conformant verification; only **Stop** with a prohibited practice (G3.08); no proceeding with expired conditions; at G5 Enterprise, proceeding requires all four sign-offs conformant and no veto.
- Segregation of duties: the verifier cannot be the sponsor, a team member (product, technical, operations) or an evidence author; the decision-maker cannot be a team member, the verifier or an evidence author; at Lite G3–G5, risk clearance must come from someone outside the team.
- From the third decision at the same gate, escalation must be marked and the higher body or the board chosen; for Transform, G2 (proceed) and G7 (scale) require a board decision.
- Conditions with description, owner, deadline after the decision and verification method; alert on expiry; they can be marked met, cancelled or expired.
- Outcomes by gate (21 §5.3): G0 and G4–G5 without Pivot; G1–G3 with Pivot (return to phase 2); **R6**: Continue operation · Proceed with conditions · Bring G7 forward (deviation checkbox that forces bringing it forward); **G7**: Scale (returns to phase 6 and opens registration of the new extended-scope use case) · Iterate (return phase, 6 by default) · Retire (coded reason, plan executed or pending recording).
- Who verifies and who decides according to 01 §7.5 (at Lite, G3–G5: sponsor with risk clearance).

**T04 · Intensity.** Eight criteria from 01 §9.2 with Yes/No/No data; one is enough for Enterprise. If there is no yes but some criteria have no data, the outcome is flagged as provisional Lite. With all eight answered "No", the **Eligibility for Express** block (01 §9.4, P04 §5.1; D147) records six conditions and who confirms them: if all are "Yes" and there is a confirmation, the intensity is **Express**. An Express use case is assessed with the Express column of the catalogue (21 §2.5): criteria outside the reduced list come out as justified *Not applicable*; it follows the Lite circuit (AI Office, sponsor with risk clearance at G3–G5), its continuity review is annual (`revision_continuidad_dias.express`, 365 by default) and the **Out of Express** alert warns if it no longer meets its eligibility (autonomy A2/A3, exposure to customers, high risk, Transform or unconfirmed eligibility).

**T05 · Ambition.** Five questions from 00 §5.2: 1 or 4 → Transform; 2 or 3 → Augment; 1–4 negative → Optimise. Depending on the moment it updates proposed (phase 1), confirmed (phase 2) or actual (phase 7) ambition. Transform forces Enterprise intensity.

**Hold.** Requires a cause (budget, dependency, supplier, data or other) and a planned resumption date; time on hold does not count towards time in phase.

**“No data” is not zero.** Empty amounts are stored as `null`, shown as “No data”, never summed and counted separately. Annual net value is efficiencies + return − recurring cost and is only calculated when at least one benefit and the recurring cost have an amount; released capacity, avoided risk and compliance are not added.

**T06 · Risk matrix and register** (document 33 and template P12).
- Common scales: likelihood and impact from 1 to 5; impact is the highest of five axes (economic, people and rights, regulatory, operational, reputational). Level = likelihood × impact: Low 1–4 · Medium 5–9 · High 10–15 · Critical 16–25. Levels are calculated; `nivel_inherente` and `nivel_residual` are kept for risks that only have the level.
- **Target** residual (with the planned controls, G3 and G4) or **verified** residual (with control effectiveness tested, G5 and R6). The body that accepts the residual depends on its level: Low, AI Product Owner; Medium, AI Sponsor; High, AI Committee; Critical, only the board or its board committee. With impact 5 on people and rights or regulatory, it is accepted as at least High (extreme impact rule, 33 §4.3).
- Observations (for information; they do not prevent saving or deciding, but they feed the alerts and the gate tab): Critical residual without board approval (blocks G3 and G5); High or Critical without a contingency plan (G3.13); Medium or higher without a response (G3.14); no owner; not assessed or without residual; accepted by a lower body, by someone building the use case, or expired; not accepted from phase 3 (G3.12); review overdue; ineffective control on a High or Critical risk (nonconformity); verified residual that reduces more levels than control effectiveness allows (2 effective, 1 partially effective, 0 otherwise); use case in phase 3 or later without a register (G3.11).
- Every new risk or change generates an edit event with date, author and reason. Risks are not deleted: they are closed with the status "Closed".
- If the highest residual of the open risks does not match the record's **main residual risk** (the value used by the board dashboard), the tab says so and offers to update it, with its event.
- **Excel of the use case: matrix and plans** (button on the Risks tab of the record and "Excel of a use case…" in the Risks view; D106). Generates in the browser, without dependencies, an `.xlsx` workbook with seven sheets: **Cover** (identification of the case, owners, generation date and time, schema, summary and legal notice), **Matrix** (residual and inherent 5 × 5 with the number of risks per cell, summary by level and by category), **Register** (all risks with the fields of P12 and 33 §8.1, calculated levels and observations), **Mitigation plan** (P13 §4: for each open risk, proposed actions, control type and what it reduces, plus columns to complete: owner, deadline, cost, evidence of effectiveness and status), **Contingency plan** (P13 §6: scenario, proposed trigger and immediate actions, use of the rollback plan, who activates it, communication and notifications; mandatory for High, Critical and impact 5, and flagged when missing), **Risks to consider** (the typical risks of document 33 §9 that apply to the profile of the use case —technology, exposure, autonomy, regulatory classification, ambition and third parties— and have no registered risk with their code, with their proposed mitigation and contingency, the column "When to review" —"Now" if document 33 places the risk in the current phase of the case or earlier, "Later" otherwise, sorted that way— and columns to include or discard with a reason, 33 §8.2) and **Scales**. Colours: white, data from the register; blue, proposal from the catalogue, to be validated; yellow, to be completed. The file is named `SEVEN-G_T06_<code>_<YYYYMMDD-HHMMSS>.xlsx`. The proposals come from `catalogo_riesgos.json` (applicability rules, control type and mitigation and contingency texts per RT code; the title, description, causes and typical controls are read from document 33 §9 when `registro.html` is generated): they are a starting point for P13, they do not replace the decision of the competent body and nothing is estimated. A risk without an RT code, or with one that is not in the catalogue, comes out without a proposal.

**Why it matters.** The risk matrix is mandatory evidence at G3, the main stopping gate, and is reviewed at G5 and at every R6. Keeping it inside the register stops it living in a separate spreadsheet that nobody updates: the same place that moves the use case through the funnel shows which risks remain untreated, who must accept them and what blocks the decision.

## Analysis metrics (03 §3.5)

| Metric | Calculation |
|---|---|
| Time in phase | Intervals between `entrada_fase` and `salida_fase` events, minus days between `espera_inicio` and `espera_fin`. Median and 80th percentile (linear interpolation) of closed intervals; intervals in progress are reported. |
| Decision time | Working days (Monday to Friday, no holidays) between `fecha_solicitud` and `fecha_decision`, by gate. |
| Time to production | Calendar days registration → first G3 decision that proceeds → first entry into phase 6. |
| Conversion by gate | Distribution of outcomes; “proceed” = Proceed, Proceed with conditions, Continue operation and Scale. |
| Iterations by gate | Average and maximum prior iterations in final decisions (outcome other than Iterate). |
| Compliance | Average degree by gate of decisions taken and the criteria that block most often. |
| Stalled | Days in phase excluding hold above the reference limit for the phase and intensity (phase 6 has no limit). |
| Time on hold and stop/retirement reasons | Episodes and days by cause; distribution of coded reasons. |
| Ambition mix and value by phase | Active use cases by phase according to confirmed (or proposed) ambition, and the sum of their expected value with a separate count of those without data. |
| Weighted value | For phases 0–5: expected value × historical probability of reaching production (register use cases that went through the phase and reached production ÷ resolved ones, in production or closed). Only shown with at least `historial_minimo_ponderado` resolved use cases (5 by default); value in phases without history is reported as excluded. |
| Cohorts | By registration quarter: registered, pass G3, reach production, closed without production and median time to production. |

## Import and export

- **Export full JSON**: the whole register in the `esquema_registro.schema.json` format. It is the backup, the way to share data and **the input of the board dashboard (T17)**. It includes the root field `aviso_legal` with the legal notice in the interface language.
- **Export use cases CSV**: one row per use case with classification, lifecycle, owners, value, conditions, closure and alerts. Semicolon separator, UTF-8 with BOM; lists separated by `|`; empty cell = no data; closed-list codes are exported untranslated. **It does not include the legal notice**: CSV has no comment lines, and an extra first line would break the header when the file is opened in a spreadsheet or imported; whoever distributes the CSV must accompany it with the notice.
- **Export risks (CSV)** (Risks view): one row per risk with the fields of P12 and 33 §8.1, calculated scores and levels, level for acceptance purposes, required body and observation codes. It is the T06 "spreadsheet template". Same format and same caveat about the legal notice as the use cases CSV.
- **Excel of the use case (T06)** (Risks tab of the record and Risks view): `.xlsx` workbook of one use case with matrix, register, proposed mitigation and contingency plans and typical risks to consider; it carries the case code, the generation date and time and the legal notice on the cover. Described in the T06 block of this page.
- **Board dashboard (T17)**: the dashboard regenerates itself in the browser from this register (D103): the header link and the one in the Data view open it, and the dashboard reads the register saved in this browser (same site). "Download the dashboard JSON" produces `dashboard_data.json` with the `t01_a_panel.js` connector, embedded here: there is a single T01 → dashboard mapping, the T17 connector's (identical in JavaScript and Python, checked in every verification). The Python generator is only needed to publish the dashboard as static files.
- **Import JSON**: picker for **one or several files** (for example, one register per area or per period). Each file is validated (structure, code patterns, closed lists, dates, references and outcomes allowed by gate); the files are then joined by code (if a code is repeated, the one in the last file prevails; `meta` is that of the first file, with the areas of all of them) and the result is validated. **Validate and import** replaces the current data; **Validate and merge** adds the files to the current data. Confirmation is always requested.
- **Results from other tools** (D100): the same picker accepts the files exported by T11 ("use case result", with `valores_t01`) and T15 ("summary for T01", with `madurez_t01`) and incorporates them into the current register without replacing it: the expected amounts of the use case are added to it in the register (as expected, with source T11 and an edit event) and the summary of each maturity assessment is merged by identifier into `madurez[]`. Served from the site, T11 and T15 can write it directly into the register saved in the browser, with no files.
- **Other tools that read this register**: the Data view links T11, T14 and T15 with the loaded register (`?desde=t01`; the link saves the register in the browser first so that the other tool reads it), as do the record (T11 with the use case) and the Board view (T14 and T15). The register is the source of truth: those tools show where each figure comes from and manual corrections made in them are not overwritten. The field-by-field map is in `../mapa_datos.json` (document 03 §4.1).
- **Restore demo** and **delete local data** ask for confirmation.

## Data model

A single JSON object with `version_esquema` (`0.8`; `0.1` to `0.7` files are accepted and upgraded on load, because each version after `0.1` only adds optional fields), `aviso_legal` (text, optional on import), `meta` (organisation, reference date, currency, time-limit configuration) and one list per entity from 03 §4. `null` means “no data”. Dates `YYYY-MM-DD`. Field names and closed-list codes are in Spanish, as in the rest of the SEVEN-G library.

**Schema 0.6 (D100)**: optional list `madurez[]` with the summary of each T15 maturity assessment (`EM-YYYY-MM`: cut-off date, cycle, mode, questionnaire version, verifier, body, overall level, minimum, average, cap by D1 or D6, validity, declaration possible and, per dimension, level, progress and blocking criteria; never the answers). T15 writes it, the Board view shows the most recent one and the T17 connector takes it to the "Company maturity" card of the dashboard. **Schema 0.7 (D115)**: each assessment may also carry `perfiles` with the summary of the NIST profiles derived from the questionnaire (`ai_rmf` and `csf`: by function, by Cyber AI Profile area and in total, with minimum and most frequent level, subcategories with a level, with a target and with a gap); the Board view shows the total of each profile and the dashboard, its table. **Schema 0.8 (D120)**: each assessment may also carry `lentes`, maturity through three lenses (11 §7.6 and 12 §3.7) at its cut-off date: `huella` (highest HT0–HT5 level in use, breadth, types, systems and use cases in operation, pilots and the most demanding footprint in exploration), `alcance` (use cases in operation by IM1–IM4), `exigible` (minimum governance by dimension) and `alertas[]` (code, severity and, where relevant, dimension); the Board view shows the footprint, reach and alerts of the latest assessment and the dashboard, its table.

| List | Entity | Code |
|---|---|---|
| `iniciativas` | Use case: identification, owners, classification (controlled taxonomy), T04, T05, lifecycle (phase, status, entry, iteration, hold, next review), closure, residual risk, impact assessments, investment, data for the dashboard (`panel`, optional), free tags, systems | `IA-AAAA-NNN` |
| `sistemas` | AI system (T02) | `SIA-AAAA-NNN` |
| `eventos` | Event with date, author, reason and change. Events that change the status of the use case (registration, phase entry, stop and retirement) also store the `cifras` (figures) at that time: investment, recurring cost, efficiencies and return, expected and realised | `EVT-NNNNNN` |
| `decisiones_gate` | Request, verification, decision, body, escalation, proposed outcome and outcome, G5 sign-offs, evaluated criteria (`codigo`, `estado`, `justificacion`, `evidencias`) | `DG-AAAA-NNN` |
| `condiciones` | Condition with decision, criterion, owner, deadline, verification and status | `CND-AAAA-NNN` |
| `evidencias` | Link, template, version, author, date and verification (linked, not copied); `origen` ("plantilla" or "referencia", when it is evidence the company already had and is referenced, 21 §4.3) and `sistema_origen` | `EVI-AAAA-NNNN` |
| `valores` | Expected or realised amount by type, formula, status (validated, declared, estimated), period, source, dashboard line (`concepto`, optional) and business unit (`area`, optional, cross-unit use cases) | `VAL-NNNN` |
| `riesgos` | Risk (T06): description, category, typical risk, system, owner, inherent and residual assessment, controls and their effectiveness, response, contingency, status, trend, review and acceptance | `IA-AAAA-NNN · Rnn` |
| `no_conformidades` · `incidentes` · `proveedores` · `recomendaciones` | Related entities (in this version they are displayed and exported; full management belongs to T08 and T09; recommendations are managed in the Board view, T18) | `NC-AAAA-NNN` · `INC-AAAA-NNN` · `PRV-NNN` · `REC-AAAA-NNN` |
| `personas` | People assignable to roles, verification, decision and conditions | `PER-NN` |

Closed lists (values in the schema): sphere `01`–`09`; ambition `optimizar · aumentar · transformar`; intensity `lite · enterprise`; regulatory classification `prohibido · alto_riesgo · transparencia · riesgo_minimo · fuera_ambito · pendiente`; technology `ml_predictivo · ia_generativa · agente · lenguaje_documentos · vision · optimizacion · ia_terceros_embebida · reglas`; exposure `interna · empleados · clientes_indirecta · clientes_directa`; value type `eficiencia · retorno · riesgo_evitado · cumplimiento`; stop or retirement reason (10 codes); statuses (8); outcomes (9); criterion statuses (4); event types (18); autonomy `A0`–`A3`.

## What the register provides to the board dashboard (T17)

The connector `../T17_panel_consejo/t01_a_panel.py` converts the full JSON of this register into the dashboard JSON and generates the full and mobile dashboards. The field-by-field mapping table is in the [T17 README](../T17_panel_consejo/README_en.md). The essentials (state names are in Spanish, as in the dashboard):

| What the dashboard shows | Where it comes from in T01 |
|---|---|
| **Case state and funnel** (Propuesto → Hipótesis de valor → POC → En desarrollo → En uso; exits: No aprobado, Descartado, Desenganchado) | Phase and closure of the use case: phases 0–1 → Propuesto; 2 → Hipótesis de valor; 3 → POC; 4–5 → En desarrollo; 6–7 → En uso. Stopped in phases 0–1 → No aprobado; in phases 2–5 → Descartado; retired → Desenganchado. The mapping is configured in `config_panel.json` of T17. |
| **Lifecycle and time per stage**, as in a CRM (`historial_estados`) | Registration and `entrada_fase` events (including steps back after a pivot or an iteration) and the closure date. Never estimated. Each status change carries the figures the use case had at that time (`eventos[].cifras`): the dashboard shows them in the funnel, in its tables and in the case record. |
| **Investment, efficiencies and return**, current and potential | Realised and expected `valores`, with their status (validated, declared, estimated) and, if provided, their `concepto` (dashboard line). |
| **Classification and controls** | Regulatory classification, impact assessments (DPIA, FRIA) and `panel.controles` (security, use and control manual, risk of AI-enabled attacks). |
| **Complexity, priority, expected value deadline and board remarks** | Optional `panel` block of the use case (in the record: “Data for the board dashboard”). |
| **Movements, incidents and recommendations (T18)** | Registration, stop, retirement and classification change events, R6 reviews, `incidentes` and `recomendaciones`. |

**Fields added in schema 0.2 for the dashboard** (all optional; empty = “no data”):

| Field | Values | Use in the dashboard |
|---|---|---|
| `iniciativas[].panel.complejidad` | `baja` · `media` · `alta` | Limit of days in development. |
| `iniciativas[].panel.prioridad` | `alta` · `media` · `baja` | Priority tag and filter. |
| `iniciativas[].panel.plazo_potencial` | `YYYY-MM` | Deadline of the potential value. |
| `iniciativas[].panel.observaciones_consejo` | text | Advisory board remarks in the case record. |
| `iniciativas[].panel.controles` | `seguridad`, `muc`, `ia_ofensiva`: `hecho` · `pendiente` · `no_aplica` | Complete controls per case. |
| `valores[].concepto` | Efficiencies: `personas` · `herramientas` · `siniestros` · `operativo` · `penalizaciones`. Return: `venta_nueva` · `venta_cruzada` · `retencion` · `precio_margen` · `cobros` · `otros` | Dashboard line where the amount adds up; without it, `operativo` or `otros`. |
| `meta.panel.consejo_sigla` | text | Name or acronym of the advisory board in the dashboard texts. |
| `eventos[].cifras` | `esperado` and `realizado`, each with `inversion`, `coste_recurrente`, `eficiencias` and `retorno` | Figures on entering each status: how the case evolves along the funnel. Stored automatically by the tool. |

**Fields added in schema 0.3: cross-unit use cases and enabling platforms** (document 40 §7.2; all optional, a 0.1 or 0.2 register remains valid):

| Field | Values | Use |
|---|---|---|
| `iniciativas[].alcance.tipo` | `unidad` · `transversal` · `plataforma` | Without the block, the use case belongs to a single unit. **Cross-unit** (`transversal`): a tool used by several business units (for example, a generative assistant in the office suite). **Platform** (`plataforma`): an enabling capability whose value is allocated to the cases that use it. Edited in the record (“Scope”) and available as a filter. |
| `iniciativas[].alcance.reparto[]` | `area`, `estado` (`previsto` · `piloto` · `en_uso` · `retirado`), `desde`, `licencias_asignadas`, `licencias_activas`, `usuarios_activos_semanales`, `horas_liberadas_mes`, `fuente`, `fecha_dato` | Roll-out and adoption of each unit (“Edit roll-out and adoption by unit” button in the Value tab). Hours are declared: they are never validated and never count as savings. |
| `iniciativas[].alcance.umbral_adopcion_pct` | 0–100 | “Low adoption” alert when a unit in use has fewer active over assigned licences. |
| `iniciativas[].alcance.habilita[]` | `IA-YYYY-NNN` codes | Platform: cases to which its value is allocated. |
| `valores[].area` | a business unit | Cost and value of each unit; without `area`, what is shared across the use case (governance, training). The Value tab shows the ladder by unit: cost, adoption, declared hours, released capacity and realised value. |
| `iniciativas[].resultado_operativo[]` | `indicador` (IND- from document 41), `nombre`, `unidad`, `sentido` (`subir` · `bajar`), `base`, `fecha_base`, `objetivo`, `actual`, `fecha_actual`, `fuente` | Operational outcome (D150): physical indicators with baseline, target and current value. The Value tab opens with the use case's **three perspectives** (economic value, operational outcome and risk exposure, 40 §11.1, rule 11), which are never merged; never translated into euros. |

**Fields added in schema 0.4: risk matrix and register (T06)** (document 33 §8.1; all optional in `riesgos[]`, a 0.1, 0.2 or 0.3 register remains valid):

| Field | Values | Use |
|---|---|---|
| `eje_impacto` | `economico` · `personas` · `regulatorio` · `operativo` · `reputacional` | Axis that determines the impact; applies the extreme impact rule. |
| `eficacia_controles` | `eficaz` · `parcial` · `ineficaz` · `no_probado` | Maximum reduction allowed in the verified residual (33 §5.3). |
| `probabilidad_residual` · `impacto_residual` | 1–5 | Position of the risk in the residual matrix. |
| `tipo_residual` | `objetivo` · `verificado` | Residual with planned controls (target) or with tested effectiveness (verified). |
| `contingencia` | text | Trigger, actions and who activates it; mandatory for High and Critical. |
| `estado` | `identificado` · `en_tratamiento` · `aceptado` · `materializado` · `cerrado` | Closed risks do not count in the matrix unless included. |
| `tendencia` | `sube` · `estable` · `baja` | Monitoring (Enterprise). |
| `fecha_alta` · `proxima_revision` | `YYYY-MM-DD` | Date identified and next review (33 §7.3). |
| `aceptacion` | `organo` (`producto` · `patrocinador` · `comite_ia` · `consejo`), `persona`, `fecha`, `vigencia`, `referencia` | Acceptance of the residual by the body for its level. |

The board dashboard (T17) does not read these fields: it still uses the use case's main residual risk.

**Fields added in schema 0.5: transformation index evidence (T14) and board register (T18)** (documents 12 and 62; all optional, a 0.1 to 0.4 register remains valid):

| Field | Values | Use |
|---|---|---|
| `iniciativas[].indice.itp2` · `itp3` | `estado` (`pendiente` · `verificada` · `no_verificada`), `gate` (`G2` · `G5` · `R6` · `G7`), `fecha`, `verificador`, `evidencia`; in `itp3`, `supervision_p17` | Verification at a *gate* of answers IT-P2 and IT-P3 (signals 4 and 5 of document 12). A change in roles without verified human oversight does not count. |
| `iniciativas[].indice.unidad_completa` | yes or no | Redesign of an entire organisational unit (level 3 of signal 5). |
| `iniciativas[].indice.capacidad` | `horas_liberadas`, `horas_materializadas`, `horas_reasignadas`, `actividad_destino`, `roles_redisenados`, `fecha` | Released and converted capacity (T20, signal 3). Reassigned hours require their destination activity. |
| `valores[].oferta_habilitada_ia` | yes or no | Return from an offering that would not exist without AI (counterfactual test; signal 6). |
| `meta.indice` | `ingresos_totales`, `periodo_ingresos`, `it_d3`, `it_d3_evidencia` | Denominator of signal 6 and condition IT-D3 of the transformation declaration. |
| `decisiones_consejo[]` | `DEC-YYYY-NNN` with `fecha`, `organo`, `acta`, `tipo`, `asunto` (thesis, Transform bet at G2, scaling at G7, review of a bet, stage decision, Critical risk, C5 review, taking note, other), `texto`, `resultado`, `iniciativas`, `esferas_transformar`, `ambicion_objetivo` (optional, only in the thesis: target ambition of each sphere 01–07, `optimizar`, `aumentar`, `transformar` or `no_prioritaria`; edited in the decision dialog and read by the board dashboard for the impact map, D131), `limite_inversion_etapa`, `etapa`, `decision_etapa`, `vigencia`, `responsable`, `recomendaciones` | Board decisions from document 62 §10: source of signal 8, of condition IT-D1 and of the target ambition in the impact map (60 §10.5). |

The record shows the index evidence in its summary ("Edit index evidence") and the **Board (T18)** view records decisions and recommendations, with the signal 8 reading and the company data. The index calculator (T14) reads all of this from the register's full JSON; the T17 connector does not read it.

**Why it matters.** Entering a use case in T01 is the equivalent of logging an opportunity in a CRM: from then on, every phase entry, gate decision, amount and closure recorded in the register moves the case through the dashboard funnel without anyone typing the data again. The board sees the same thing the AI Office manages.

Anything T01 does not record (overall adoption of productivity suites outside a cross-unit use case, agent identity and permissions record, DORA provider, operating metrics) is left as “no data” in the dashboard.

## Demo data

Fictitious company (*Compañía Ejemplo Industrial, S.A.*), 21 fictitious people and 4 fictitious suppliers, 15 use cases registered in 2025 and 2026 across all phases (0–7) and all eight statuses: one registered, in phase, awaiting gate (one at its third iteration, escalated to the higher body), one on hold with resumption overdue, in production (one with an overdue continuity review), one awaiting G7 brought forward by R6, one **stopped** at G3 for unacceptable risk and one **retired** after G7 because it was replaced. There are stalled use cases, two **expired conditions**, a pivot, decisions with conditions, a G5 Enterprise multi-level sign-off, validated, declared, estimated and no-data amounts, 9 systems (including one for corporate use), incidents and nonconformities, and 21 risks across nine use cases with codes from the catalogue in document 33: accepted by the body for their level, one closed in the stopped use case, one High without a contingency plan in the use case awaiting G3, and one expired acceptance with an overdue review in the cross-unit use case. One is **cross-unit** (a generative assistant in the office suite, rolled out in waves across five units: two in use, one in pilot and two planned, with Commercial below the adoption threshold, realised and validated value in Finance and declared released capacity that does not add up). Fourteen use cases carry data for the board dashboard (complexity, priority, controls and, in four of them, advisory board remarks) and one does not, so that the dashboard also shows “no data”; efficiency and return amounts carry their dashboard line except those with no hypothesis yet. The T17 example dashboard is generated from this data. The data is illustrative: any resemblance to a real company or person is coincidental.

**Examples by sector (D136).** `ejemplos/<sector>/datos_demo.json` are complete registers of fictitious companies in banking, insurance, manufacturing and the public sector, from which the [gallery of examples by sector](../T17_panel_consejo/galeria/index.html) generates its dashboards. They are generated from a compact profile per sector (`ejemplos/_fuentes/<sector>.json`) with `uv run --with jsonschema python generar_ejemplos.py` (in `ejemplos/_fuentes`), which validates them against the schema; they are never edited by hand. They can be imported into the register (Data → Import), but they replace the saved data. They do not change the example the register opens with.

## Limitations

- Working days are Monday to Friday, with no holiday calendar. R6 frequency is approximated in days (182 Lite and 91 Enterprise, configurable).
- Single-user, local tool: no authentication, access control, electronic signature or time-stamping; the author of each event is declarative. `localStorage` data is not shared across browsers or devices; export the JSON.
- Import validates the main structure, not the full JSON Schema. Merging joins entities by code: it suits registers with different codes (per area or per period) or updated versions of the same records; if two registers have been edited separately from the same base, new codes may collide and the one in the last file prevails.
- The board dashboard measures the time in each stage with the phase-entry dates; it does not deduct periods on hold, which the register analysis does deduct.
- If the browser holds data from a previous version, the new example risks do not appear until "Restore demo data" is clicked in the Data view.
- The risks view does not yet calculate portfolio concentration and correlation (33 §10) or key risk indicators (33 §11).
- Nonconformities and incidents (T08), suppliers (T09), value realisation by period (T12), retirements (T22) and recommendations (T18) are displayed, raise alerts and are exported, but their full management belongs to those tools (waves 2 and 3).
- Gates grouped in Lite (G0–G2, G4–G5) are recorded as separate decisions on the same day; there is no joint session.
- Scale opens registration of the new use case with the tag “Escalado de IA-…”, without a formal link between the two.
- Historical probability is not segmented by intensity, ambition or cohort.
- Tested in Microsoft Edge (Chromium). It should work in other current browsers supporting `<dialog>`, but has not been tested.

## Licence

Code under the **MIT** licence. Content (texts, criteria catalogue, model and demo data) under **CC BY 4.0**.

© 2026 Fernando García Varela · Metodología SEVEN-G
